Bend-Tech Dragon A400 Installationsanleitung

Revision 6 | English
A400
Part 2 of 3
Startup and Training Manual
Part 2: Machine Overview, Inspection, and Startup
©2021 Bend-Tech LLC

ii Bend-Tech Dragon A400
Startup and Training Manual
©2021 Bend-Tech LLC
All rights reserved. The information in this manual is subject to change without notice.
Bend-Tech LLC strives to produce the most complete and accurate information regarding
its products. We are constantly working to improve and advance our products to increase
performance, user satisfaction and experience. Bend-Tech LLC assumes no responsibility for
errors or omissions regarding this manual. Bend-Tech LLC assumes no liability for damages
resulting from the use of the information contained in this publication.

iiiBend-Tech Dragon A400 Startup and Training Manual
Dragon A400
Start-Up and Training Manual
Revision 6
English
Original Instructions
Janurary 2021
Bend-Tech LLC
729 Prospect Ave.
Osceola, WI 54020 USA
(651) 257-8715
www.bend-tech.com

iv Bend-Tech Dragon A400
Startup and Training Manual
Contents
Contents
Contents...................................iv
01
Machine Overview ................... 7
1.1 Introduction ....................7
1.2 Gate Overview ..................7
1.2.1 Gate Eccentric Bearing .......8
1.2.2 Gate Lead Screws ...........9
1.2.3 Gate Adjustment ............9
1.2.4 Gate Clamp ................9
1.3 Material Support Lift Overview......9
1.3.1 Material Support Lift Operation 10
1.3.2 Air Cylinder Adjustment ...... 10
1.4 Toolhead.......................11
1.4.1 Toolhead Actuators ..........11
1.4.2 Marker Holder ............. 12
1.4.3 Engraver ................. 12
1.4.4 Engraver Air Regulators. . . . . . 12
1.4.5 Torch .................... 13
1.4.6 Laser Light................ 13
1.5 Electrical Components Overview ... 13
1.5.1 Emergency Stops (E-Stops) .. 13
1.5.2 E-Stop Wiring. . . . . . . . . . . . . . 13
1.5.3 Homing Sensors ........... 14
1.5.4 Homing Sensor Designations
and Locations .................. 14
1.6 Motor Cable Connections Overview 15
1.7 Hypertherm Unit................ 15
1.7.1 Hypertherm Overview ....... 15
1.7.2 Hypertherm Cable .......... 15
1.7.3 Ground Connection ......... 15
1.7.4 Amperage ................ 16
1.7.5 Air Supply. . . . . . . . . . . . . . . . . 16
1.7.6 Gas ..................... 17
1.7.7 Consumables.............. 17
1.7.8 Consumables Part List. . . . . . . 17
02
Machine Inspection ................ 19
2.1 Machine Inspection ............. 19
2.2 Rail Inspection ................. 20
2.2.1 Check Rail Assembly........ 20
2.2.2 Check Rail Level ........... 21
2.2.3 Check Rail Straightness ..... 22
2.3 Electrical Inspection ............. 23
2.3.1 Motor Cables .............. 24
2.3.2 Motor Cable Locations....... 25
2.3.3 Axis Sensor Cables ......... 25
2.3.4 Emergency Stop Cables ..... 26
2.3.5 Ethernet Port .............. 26
2.3.6 Laser Light Cord ........... 27
2.3.7 Tool Connections ........... 27
2.3.8 Ground Cable ............. 27
2.3.9 Check the Breakout Board. . . . 28

vBend-Tech Dragon A400 Startup and Training Manual
Contents
2.3.10 Connect Power ........... 28
2.3.11 Check for 5 Volts .......... 29
2.3.12 Check E-Stops............ 29
2.4 Air Line Connection ............. 30
03
Machine Control Startup........ 31
3.1 Machine Control Startup ......... 31
3.2 Booting Up The Dragon A400 ..... 31
3.2.1 Power On Computer ........ 31
3.3 Power On Control Box ........... 32
3.3.1 Main Power Switch ......... 32
3.3.2 Green Power Button ........ 32
3.3.3 Launch Bend-Tech 7x ....... 32
3.3.4 Dragon A400 Software Color
Designations................... 32
3.3.5 Bend-Tech Launcher ........ 33
3.3.6 Machine Control. . . . . . . . . . . . 33
3.3.7 Mach3 Machine Control ..... 34
3.3.8 Enable Machine............ 34
3.4 Jog Controls System Check....... 34
3.4.1 Open Jog Controls.......... 34
3.4.2 Motor Location and Operation
Index......................... 35
3.4.3 Jogging the Machine ........ 35
3.5 Homing The Machine............ 36
3.5.1 Homing an AXIS ........... 36
......... 36
3.5.3 Jog the Trolley ............. 37
3.5.4 Home All Axis.............. 37
3.6 Hypertherm ................... 38
3.6.1 Hypertherm Power Switch .... 38
3.6.2 Hypertherm Cut Type........ 39
3.6.3 Hypertherm Air Supply....... 39
3.6.4 Hypertherm PSI Settings ..... 39
3.6.5 Hypertherm Cut Settings ..... 39

vi Bend-Tech Dragon A400
Startup and Training Manual
Contents

7Bend-Tech Dragon A400 Startup and Training Manual
Machine Overview
01
01
Machine Overview
1.1 Introduction
This chapter overviews general information on the Bend-Tech Dragon A400. This general
information is a starting point to learn about the Dragon A400. For detailed information on
operation and troubleshooting, please refer to your Bend-Tech Dragon A400 Operator’s
Manual.
1.2 Gate Overview
The gate is located at the front of the Dragon A400. The gate works in conjunction with the
chuck to support and move the material through the cutting process. There are two styles of
gate that the Dragon A400 can come equipped with: a non-powered gate and a powered gate.
Gate Type Function
Non-Powered Gate Round, square or rectangle material. Does not support
angle or channel
Powered Gate Round, square, rectangle, angle or channel material.
Essential when processing angle or channel.

8Bend-Tech Dragon A400
Startup and Training Manual
Machine Overview
01
1.2.1 Gate Eccentric Bearing
The gate rides upon three bearings located on the
back face of the gate assembly. The gate should ride
smoothly on its bearings with no binding. If there is
play in the gate or if the gate binds while moving,
the gate eccentric bearing may need adjustment.
Please, contact customer support before adjusting the
eccentric bearing.
A Dragon A400 machine equipped with
a Non-Powered Gate will not have a
C-Axis drive motor or ring gear.
A Dragon A400 machine equipped
with a Powered Gate will include
the C-Axis drive motor and
Powered Gate Ring Gear.
Front Gate Rollers
Front Lead Screw
Rear Lead Screw
C Axis Drive motor
and gear
Powered Gate Ring Gear
Non-Powered Gate Powered Gate
Front Gate Eccentric
Bearing
Important
Keeping the gate clean is key to maintaining optimum performance of the Dragon.
Refer to maintenance guidelines for the gate for cleaning procedures and intervals.

9Bend-Tech Dragon A400 Startup and Training Manual
Machine Overview
01
1.2.2 Gate Lead Screws
The lead screws are used to adjust the opening of the gate. The gate uses two lead screws,
positioned 90 degrees from each other. Adjust the lead screws using a ¼ in. Allen wrench,
which is provided with the machine. Turning the lead screws clockwise closes the gate, and
turning them counterclockwise opens the gate. The gate lead screws should operate smoothly
with minimal force and no binding throughout the travel.
1.2.3 Gate Adjustment
When loading material, the gate should be adjusted so
that the rollers are snug against the material. The rollers
should not be overtightened, and should spin by hand, but
not spin freely. The material needs to move freely within
When no material is loaded into the gate, the gate rollers
should spin freely without binding or sticking.
1.2.4 Gate Clamp
The gate clamp is used on non-powered gates to
lock the gate into one position. It is used only for
round stock. The gate clamp is critical to keeping
round stock in position during cutting. Always lock
the gate with the lead screws in the 12 o’clock and
3 o’clock positions.
1.3 Material Support Lift Overview
The material support lift is used to support extremely long or thin material. Long material can
support lift can accommodate up to 6-inch OD round stock or 4-inch diameter square stock. By
default the material support lift will activate for material stock over 10 feet (3 meters).
Important
The gate will only need
to be adjusted when
changing material types
or sizes, or for removing
remnant material.
Reminder
Machines equipped with the powered gate
do not come equipped with a gate clamp.
Front Gate
Gate Clamp
E-Stop

10 Bend-Tech Dragon A400
Startup and Training Manual
Machine Overview
01
1.3.1 Material Support Lift Operation
The material support lift is
powered by the B-Axis motor
which moves the lift up and
down. The rotation of the
material support lift is achieved
via a pneumatic cylinder.
The pneumatic controls for
the material support lift are
pre-set to 60 psi. However,
line pressure going into the
of operation of the material
support lift so some adjustment
may be necessary.
1.3.2 Air Cylinder Adjustment
The speed of the material
support lift rotation is controlled
by a needle valve adjustment screw on either
end of the air cylinder. The right side needle
valve adjustment controls the inward rotation
of the material support lift (toward the Rail).
The left side needle valve adjustment controls
the outward rotation of the material support
lift (away from the Rail).
Material Support
Lift in use
Material Support
Lift not in use
Left Needle Valve
Right Needle Valve
Material Support
Lift Air Regulator
Important
When adjusting the
needle valves on the
Material Support Lift air
cylinder it is best to turn
them ¼ turn at a time to
avoid over adjustment
and possible damage
to the assembly.
Andere Handbücher für Dragon A400
14
Inhaltsverzeichnis
Andere Bend-Tech Schweißsystem Handbücher
Beliebte Schweißsystem Handbücher anderer Marken

TAFA
TAFA 30*8B35 Bedienungsanleitung

Lincoln Electric
Lincoln Electric INVERTEC V350-PRO CE Bedienungsanleitung

ESAB
ESAB Buddy Arc 145 Bedienungsanleitung

CIGWELD
CIGWELD 636804 Kurzanleitung

Red-D-Arc
Red-D-Arc DC-400 Bedienungsanleitung

Hobart Welding Products
Hobart Welding Products Spool Gun DP 3035-10 Bedienungsanleitung













