CommScope Quareo HDEP Series Bedienungsanleitung

25111-A
Content Page
300100102902 Rev D Page 1
This product is covered by one or more U.S.patents or their foreign equivalents. © 2017 CommScope.
For patents, see http://www.commscope.com/ProductPatent/ProductPatent.aspx All Rights Reserved.
User Manual
INTRODUCTION ............................................................................. 2
RELATED PUBLICATIONS ...................................................................... 3
1 PRODUCT DESCRIPTION .................................................................. 4
1.1 Physical Description ............................................................... 4
1.2 Panel Electronics ................................................................. 5
1.3 Status LEDs on Front Panel and Modules ................................................. 5
1.4 Specifications ................................................................... 6
2 UNPACKING AND INSPECTION .............................................................. 7
3 INSTALLATION......................................................................... 7
3.1 Overview ....................................................................... 8
3.2 Tools and Hardware Needed ......................................................... 8
3.3 Rack Installation ................................................................. 8
3.4 Installing the Vertical Cable Guides (VCGs) ...............................................10
3.5 Grounding the Panel ...............................................................13
3.6 Installing the Management Unit .......................................................13
3.7 Connecting the Ethernet Cable and AUX Power Cable ........................................14
3.8 Connecting the Control Cable .........................................................14
3.9 Connecting the Panel to the Quareo Network ..............................................15
4 INSTALLING MODULES AND IFC CABLES.......................................................15
5 TECHNICAL ASSISTANCE..................................................................16
Quareo High Density Equipment Panel (HDEP)
TECP-90-801 Issue 4 October 2017

TECP-90-801 • Issue 4 • October 2017
Page 2
© 2017 CommScope. All Rights Reserved.
INTRODUCTION
This manual describes the Quareo High Density Equipment Panel (HDEP) and documents all
procedures required in installing it. Included are the procedures required to mount the panel on
a rack, ground the panel, and install Vertical Cable Guides (VCGs).
Revision History
ISSUE DATE REASON FOR CHANGE
1 5/2014 Original.
3 January 2017 Reformatted for CommScope.
4 October 2017 Updated to remove incorrect logo.
Trademark Information
CommScope (logo), CommScope, and Quareo are trademarks
.
Applicable Standards
UL 60950-1, 2nd Edition, 2007-03-27 (Information Technology Equipment - Safety - Part 1:
General Requirements)
CSA C22.2 No. 60950-1-07, 2nd Edition, 2007-03 (Information Technology Equipment -
Safety - Part 1: General Requirements)
Admonishments
Important safety admonishments are used throughout this manual to warn of possible hazards to
persons or equipment. An admonishment identifies a possible hazard and then explains what
may happen if the hazard is not avoided. The admonishments — in the form of Dangers,
Warnings, and Cautions — must be followed at all times.
Danger: Danger is used to indicate the presence of a hazard that will cause severe personal
injury, death, or substantial property damage if the hazard is not avoided.
Warning: Warning is used to indicate the presence of a hazard that can cause severe personal
injury, death, or substantial property damage if the hazard is not avoided.
Note: This manual does not contain instructions for installing modules in access trays.
Instructions unique to the various module types are provided through QR code access to
the CommScope Field Support Link. This online site contains videos, animations, and
other information for the module being installed. The QR code is a label on the top of the
panel; the Field Support Link is accessed using a visual recognition app on a smart phone.
Note: This manual does not contain instructions for the Web Interface used when the
panel is installed to configure it within the Quareo network. Instructions for this are
provided in TECP-90-805.

Caution: Caution is used to indicate the presence of a hazard that will or can cause minor
personal injury or property damage if the hazard is not avoided.
TECP-90-801 • Issue 4 • October 2017
Page 3
© 2017 CommScope. All Rights Reserved.
General Safety Precautions
Danger: To prevent electrical shock, never install panel in a wet location or during a lightning
storm. When installing or modifying telephone lines, disconnect lines at the network interface
before working with uninsulated lines or terminals.
Caution: When connecting the equipment to the power sources, check the equipment nameplate
rating to avoid overloading circuits which may cause damage to over-current protection devices
and supply wiring.
Caution: If the panel is installed in a closed or multi-rack assembly, the operating temperature
of the rack environment may be greater than the ambient temperature. Be sure to install the
panel in an environment that is compatible with the maximum rated ambient temperature. See
Specifications.
Caution: Installation of the equipment in a rack should be such that air flow to the equipment is
not compromised.
Caution: When mounting equipment in the rack make sure mechanical loading is even to avoid
a hazardous condition, such as loading heavy equipment in the rack unevenly. The rack should
safely support the combined weight of all equipment it supports.
Caution: Reliable earthing of rack-mounted equipment should be maintained. Particular
attention should be given to supply connections other than direct connections to the branch
circuit (e.g. use of power strips).
Caution: This equipment is to be installed only in Restricted Access Areas (dedicated
equipment rooms, equipment closets, etc.) in accordance with Articles 110-16, 110-17, and 110-
18 of the National Electrical Code, ANSI/NFPA 70
RELATED PUBLICATIONS
Listed below are related manuals and their publication numbers. Copies of these publications can
be ordered by contacting the CommScope Technical Assistance (refer to Topic 5 on Page 16).
Title/Description Publication Number
Quareo High Density Equipment Panel Web Interface User Manual TECP-90-805
Quareo Management Unit Installation Manual TECP-90-806

TECP-90-801 • Issue 4 • October 2017
Page 4
© 2017 CommScope. All Rights Reserved.
1 PRODUCT DESCRIPTION
1.1 Physical Description
The Quareo High Density Equipment Panel (HDEP) is a fiber optic connector panel with six
access trays, each providing a mounting location for one adapter pack or cabled module. A
single access tray provides 24 LC connections for a panel total capacity of 144 LC connections.
The panel has mounting brackets intended for a 19-inch (48. 26 cm) rack-mount. Extender
brackets configure the panel for an ETSI or 23-inch (58.42 cm) rack-mount. The panel is
shipped with the ETSI extender brackets already installed. The panel may also be mounted in a
cabinet providing a 19-inch, 23-inch, or ETSI rack mount configuration.
This panel contains electronics that enable connection information to be acquired and supplied
to the Infrastructure Configuration Manager (ICM), the central system software of the Quareo
physical layer management system. Refer to Topic 1.2 on Page 5.
Figure 1 shows the main physical features of the 1RU panel, including the following:
•Access trays—hold adapter packs or cabled modules; open to front or rear of the panel.
•Access tray doors—protect adapter pack or cabled module when access tray is closed.
•Designation cards—are used to record cable destinations.
•QR code—is a label with a pattern recognizable by a visual recognition app on a smart
phone. The QR code causes the smart phone to link to the CommScope Field Support
Link, which contains user instructions specific to the 1RU panel.
QR CODE
CABLE
MANAGEMENT
LINKAGE 25316-C
RACK
OFFSET
ADJUSTMENT
SLOT
RACK
OFFSET
SCREWDOWN
LOCATIONS
ACCESS
TRAY
MOUNTING
BRACKET
(WITH
EXTENSION)
GROUNDING
LOCATION
ACCESS TRAY
DOOR (4X)
VERTICAL CABLE
GUIDE (4X)
(PROVIDED)
SHIPPING
BRACKET (2X)
REMOVED
BEFORE
INSTALLATION
DESIGNATION CARDS
(LOCATED ON
BACKSIDE OF DOOR)
Figure 1. Quareo HDEP Physical Features

TECP-90-801 • Issue 4 • October 2017
Page 5
© 2017 CommScope. All Rights Reserved.
•Mounting brackets—are intended for a 19-inch (48. 26 cm) rack-mount. Extender
brackets configure the panel for an ETSI or 23-inch (58.42 cm) rack mount. The panel is
shipped with the ETSI extender brackets installed.
•Cable management linkage—holds and repositions cables when access trays are opened
or closed to ensure cables are not crimped or misaligned impeding tray movement.
•Rack offset adjustment slot and rack offset screwdown locations—(on each side of
panel) provides offset options of 3, 4, 5, or 6.5 inches (7.62, 10.24, 12.7, or16.5 cm).
•Grounding location—provides a mounting stud for a ground wire.
The Quareo HDEP is orderable with universal adapter packs designed to accept a variety of
connector types. Available adapter pack types include LC-LC and MPO-MPO. For more
information, see Table 1. Adapter packs can be installed from the front or rear by snapping them
into position; no screws or tools are required. Cabled modules (ordered separately) are also
available for this panel. For more information, see Table 1.
1.2 Panel Electronics
The Quareo HDEP has electronics that enable it to function by ICM in a Quareo physical
management system. A typical Quareo network includes both fiber and copper connector panels
and non-managed representations of the input and output devices (such as switches) to which
cables are connected.
Assuming all connections to the Quareo HDEP are made with managed modules and cables,
these electronics provide an ICM user with the ability to know, on a real time basis, whether
each port of the Quareo HDEP is connected and to what it is connected (what other equipment
and port). On a network level, the user may plan future connections and disconnections of
equipment assisted by a dynamic schematic view of connectivity of the entire network.
1.3 Status LEDs on Front Panel and Modules
The Quareo HDEP has six Light Emitting Diodes (LEDs) on the front middle of the panel
(Figure 2). These LEDs are identical in function. There is one LED for each access tray. The
LEDs have two states: unlit or lit (green).
ONE
ACCESS
TRAY
25315-A
LEDs
FRONT MIDDLE OF PANEL
Figure 2. Status LEDs

TECP-90-801 • Issue 4 • October 2017
Page 6
© 2017 CommScope. All Rights Reserved.
The status LEDs on the front panel blink green at start-up. If a LED for a particular access tray
does not light at start-up, either there is no module installed in the access try or a module is
present but due to malfunction or mis-seating is unknown to the Quareo system. A blinking
green LED after start-up indicates an individual LED is lit for one of the connectors in the
module installed in that access tray. To identify which LED this is, open the access tray and
check the individual LEDs on the ports.
A LED lit for an individual port indicates that ICM has identified this port as requiring attention
for an active Work Order to be completed. The LED stays on until the entire Work Order is
successfully completed. There can be multiple steps in a Work Order such as Connect two ends
of cable, Disconnect two ends of cable, Insert one end of cable, Extract one end of cable, and so
on. LED blinking is different for Connect and Disconnect Work Orders. For a Connect Work
Order step, LEDs blink green on the two ports that need to be connected. For a Disconnect
Work Order step, LEDs blink yellow on the two ports that need to be disconnected.
A LED for an individual port or all LEDs for all ports on a particular module can also be lit for
identification purposes using the Quareo Panel Interface Web Browser.
1.4 Specifications
Table 1 lists specifications for the Quareo HDEP.
Table 1. Quareo High Density Equipment Panel
PARAMETER SPECIFICATION REMARKS
Electrical
Voltage 37-57 VDC, 48 VDC nominal
Input current 350mA (maximum (per IEEE 802.3af) at 48 VDC
Environmental
Operating conditions +14F to +140F(10Cto+60C)
5% to 95% RH
No condensation
Storage conditions 40F to +158F(40C to +70C) 10% to 95% RH No condensation
Mechanical
DimensionsDxWxH 13.35 in (33,9 cm) D x 19.01 in (48.29 cm)Wx1.7
in (4.32 cm) H
Weight 4.1 lb. (1.86 kg.)
Components
Supported Adapter Packs* LC-LC 24 fibers (12 duplex ports)
MPO-MPO 192 fibers (eight 24-fiber
ports)

TECP-90-801 • Issue 4 • October 2017
Page 7
© 2017 CommScope. All Rights Reserved.
2 UNPACKING AND INSPECTION
Unpack and inspect the various components as follows:
1. Inspect the exterior of the shipping container(s) for evidence of rough handling that may
have damaged the components in the container.
2. Unpack each container while carefully checking the contents for damage and verify with
the packing slip.
3. If damage is found or parts are missing, file a claim with the commercial carrier and notify
CommScope Customer Service. Save the damaged cartons for inspection by the carrier.
4. Refer to Topic 5 on Page 16 if you need to contact CommScope.
5. Save all shipping containers for use if the equipment requires shipment at a future date.
3 INSTALLATION
Warning: To prevent electrical shock, never install panel in a wet location or during a lightning
storm. When installing or modifying telephone lines, disconnect lines at the network interface
before working with uninsulated lines or terminals.
Caution: This equipment is to be installed only in Restricted Access Areas (dedicated
equipment rooms, equipment closets, etc.) in accordance with Articles 110-16, 110-17, and 110-
18 of the National Electrical Code, ANSI/NFPA 70.
Panel
Caution: If the panel is installed in a closed or multi-rack assembly, the operating temperature
of the rack environment may be greater than the ambient temperature. Be sure to install the
panel in an environment that is compatible with the maximum rated ambient temperature. See
Specifications.
Supported Modules LC-MPO (straight configuration; left or right) 24 fibers (one 24-fiber rear
port)
LC-MPO (flipped configuration; left or right) 24 fibers (two 12-fiber rear
ports)
LC-MPO (10G HD; left or right) 24 fibers (two 12-fiber rear
ports)
LC cabled module Dual zip 24-fiber cable
Table 1. Quareo High Density Equipment Panel
PARAMETER SPECIFICATION REMARKS

TECP-90-801 • Issue 4 • October 2017
Page 8
© 2017 CommScope. All Rights Reserved.
3.1 Overview
Installation involves the following:
• Mounting the panel on a rack;
• Grounding the panel;
• Connecting the network control cable;
• Connecting power;
• Connecting the panel to the Quareo network;
• Installing controlled modules and cables.
3.2 Tools and Hardware Needed
Tool and hardware requirements are listed in Table 2.
Table 2. Installation Tools and Hardware Needs
CONSIDERATION DESCRIPTION
Tools Needed #1 Phillips Screwdriver,
#2 Phillips Screwdriver,
3/16” Standard Screwdriver
Rack Mounting 19” EIA/WECO/ETSI Rack Mounting. Use supplied #12-24 screws and #2
Phillips Screwdriver to secure the panel to the rack or cabinet or use supplied
M6 screws, cage nuts and #2 Phillips Screwdriver to secure the panel to the
rack or cabinet or use TrueNet®Frame “quick fit” solution
Grounding Secure panel to ground. Use #1 Phillips Screwdriver to tighten the 10-32
screws through the ground lug (provided) into the panel ground PEM nuts.
Ground cables are NOT provided with the panel
Incoming IFC Cable
Clamping
Use supplied cable clamps and 3/16” standard screwdriver to secure the
incoming IFC cable
3.3 Rack Installation
The Quareo HDEP is shipped with extender brackets already attached for mounting the panel in
an ETSI equipment rack. The extender brackets may be removed for mounting the panel in a
19-inch (482.6mm) equipment rack. Mounting brackets for a 23-inch (58.42 cm) mounting are
supplied as ship along items.
Check the work order to determine the panel location in the rack or cabinet. Mounting hardware
is shipped loose. Each panel is secured with either 12-24 screws, M6 hardware, or TrueNet®
quick fit hardware depending on type of mounting used.
Use the following procedure to mount the panel (refer to Figure 3).

Caution:
If panel is installed in a closed or multi-rack assembly, the operating temperature of the
rack environment may be greater than the ambient temperature. Be sure to install the panel in an
environment that is compatible with the maximum rated ambient temperature. See Specifications.
Caution: Installation of the equipment in a rack should be such that air flow to the equipment is
not compromised.
TECP-90-801 • Issue 4 • October 2017
Page 9
© 2017 CommScope. All Rights Reserved.
1. Obtain the following tools and equipment:
• Flat blade or Phillips screwdriver (type to match mounting screws)
• Locate mounting hardware required.
MOUNTING
BRACKET
12-24 x 1/2 IN.
SCREW (4)
26574-A
RACK
FRONT
FLANGE
LOCKWASHER
(4)
Figure 3. Mounting Panel
(Shown With 23-Inch Extender Brackets Installed)
2.
Determine what rack size is being used, and reconfigure the
mounting brackets if required
for the frame (or cabinet) in which the panel is being installed.
a. For an ETSI rack or cabinet, leave the panel as received from the factory with extender
brackets attached.
b. For a19-inch rack or cabinet, remove the ETSI brackets and leave the inner mounting
brackets in place.
c. For an 23-inch rack or cabinet, remove the ETSI brackets and in their place install the
23-inch extender brackets (provided in ship along kit).

TECP-90-801 • Issue 4 • October 2017
Page 10
© 2017 CommScope. All Rights Reserved.
3. Determine the rack offset position to be used. If other than the 3-inch position that the
panel is shipped in from the factory, remove the two screws holding the rack adjustment
bar, and slide it off the mounting posts and relocate onto the desired mounting posts.
Tighten down the screws in the new rack offset position.
Note: For location of rack offset slot, see Figure 1 on Page 4.
4. Locate the equipment rack mounting space that is specified for the panel.
Note: Ethernet cabling distance to and from the panel should not exceed 328ft. (100m).
Note: If installing panel in a Q-Frame (Cross-Connect Solution), make ground connection
to panel before securing panel in the rack.
5. Place panel in the assigned mounting space and align the holes in the mounting brackets
with the holes in the equipment rack. See Figure 3 on Page 9.
6. Secure panel to equipment rack using the appropriate hardware. Torque these screws to
approximately 27 pound-inches (3.1 Newton meters).
Caution: When mounting equipment in the rack make sure mechanical loading is even to avoid
a hazardous condition, such as loading heavy equipment in the rack unevenly. The rack should
safely support the combined weight of all equipment it supports.
3.4 Installing the Vertical Cable Guides (VCGs)
Vertical Cable Guides (VCGs) are installed on the left and right sides of both the front and the
rear of the panel. Use the following procedure.
1. Orient the VCG with the panel as shown in Figure 4.
Note: The panel is shown here without extension brackets.
2. Insert the VCG into the panel using the orientation shown in Figure 5.
3. Press the VCG into position in the panel as shown in Figure 6.
Note: Make sure the leading edge of the VCG is inserted under the guide rails as shown in
Figure 7.