Conti MONTE-CARLO Leitfaden

MONTE-CARLO - 11/2015 - SOFT V 2.11 1
TECHNICAL DOCUMENTATION

MONTE-CARLO - 11/2015 - SOFT V 2.11 2
1TECHNICAL DOCUMENTS 3
2DIMENSIONS 3
3CAUTION DURING THE USE 4
3.1 Ambient conditions 4
3.2 During installation 4
3.3 During the use 4
3.4 Rules relating to the environment 4
4INSTALLATION 5
4.1 Standby In case of a standby of the machine (standby = 2 months): 5
4.2 Protections 5
4.3 Water supply 5
4.4 Drain 5
4.5 Supplying voltage 5
4.6 Water softeners 6
5FIRST INSTALLATION: 7
6STARTING & WARM UP: 9
7HOW TO USE THE MACHINE 11
7.1 Operating elements 11
7.2 How to use the programmed doses 12
8COFFEE GROUPS: 13
8.1 Mode menu 13
8.2 Group eco mode 15
8.3 Clean button 15
9PROGRAMMING DOSES METHODOLOGY 16
9.1 Coffee doses programming: 16
9.2 Hot water dose programming: 17
10 GENERAL DISPLAY: 18
10.1 ECO MODE (general) 18
10.2 Programming on general display 18
11 COFFEE TEMPERATURE ADJUSTMENTS 37
12 QUALITY CRITERIA 38
13 STEAM CONTROL PRODUCTS ADJUSTMENTS 39
14 SOFTWARE VERSION UPDATE 40
15 MAINTENANCE OF MACHINES 42
16 ELECTRIC DESIGNATIONS 45
17 ELECTRIC DRAWING 46
17.1 CPU board 46
17.2 Electrical power diagram for “400V 3L N PE” 47
17.3 Electrical power diagram for “230 V 1L N PE” 48
17.4 Connecting diagram: 12 fuses box 49
17.5 Solid state relay interface for “400 V 3NAC” 53
17.6 Low voltage wiring 54
18 HYDRAULIC SCHEME 55
19 ALARM 57
20 POWER MANAGEMENT 59

MONTE-CARLO - 11/2015 - SOFT V 2.11 3
1 TECHNICAL DOCUMENTS
Steam boiler
Coffee boiler
Group
Outlet
Total
power
Capacity
(liter)
Power
(W)
Capacity
(liter)
Number
Power
(W)
Number
Power
(W)
Power
(W)
(W)
MC 2G
10
4200
0,9
2
1000
2
100
300
6700
MC 3G
14
6000
0,9
3
1000
3
100
300
9600
MC 2G K
10
6000
0,9
2
2500
2
100
300
11500
MC 3G K
14
6000
0,9
3
2500
3
100
300
14100
BOILER CAPACITY ( IN LITERS )
2 Groups
3 Groups
TOTAL
10
14
Hot water volume
6,5
10
Steam volume
3,5
4
Coffee boiler volume
2 x 0.9
3 x 0.9
WEIGHT (kg)
EMPTY
(Kg)
Weight
in operation (Kg)
2G
89
97
3G
99
112
2 DIMENSIONS
Cup warmer capacity: (88 espressos cups) or (56 espressos cups + 18 cappucino cups)

MONTE-CARLO - 11/2015 - SOFT V 2.11 4
3 CAUTION DURING THE USE
3.1 Ambient conditions
The ambient temperature around the machine had to be between 5°C and 32°C.
The ambient humidity must not exceed 70 %
The machine must be placed such as the cup warmer is located more than 1.5 meters
from the ground.
3.2 During installation
The installation (electrical connections, water supply and drainage) must be carried out by
a qualified technician approved by CONTI.
The machine must be connected to a device conforming to the standards of the country
where the machine is installed. Potential costs of equipment compliance are the only
responsibility of the customer.
For any technical intervention, the machines must always have the power disconnected
from the mains.
An effective earth connected to the terminal provided for this purpose on the device is
mandatory
A screw located under the bottom base machine, allow if necessary, to connect several
machine on an equipotential way.
Devices for disconnection from the main supply, having a contact separation of at least
3mm in all poles, must be provided in the fixed wiring in accordance with the installation
rules.
3.3 During the use
When the machine is not operating, the water cut-off valve has to be closed and the
electrical power supply cut.
When the machine is not supervised it must be disconnected from the power and water
supply.
Never disconnect the earthing when the machine is connected to the power supply.
Machines must always be disconnected from the main power, in case of technical
interventions.
3.4 Rules relating to the environment
This device has been designed according to the European Directive No. 2002/95/EC. This
refers to the restriction of certain hazardous substances in electrical and electronic
equipment (ROHS)
This device has been designed in compliance with the European Directive No.
2002/96/EC concerning waste electrical equipment (WEEE).
This picture informs you that this device should not be discarded with household waste.
At end of life, this product must be returned to a collection point or returned to an
authorized dealer. By doing so, you will help to protect the environment and human
health.

MONTE-CARLO - 11/2015 - SOFT V 2.11 5
4 INSTALLATION
4.1 Standby In case of a standby of the machine (standby = 2 months):
The first thing to do is to test your machine in a lab.
If the machine stops running for a long time, you could have sediment in some places.
More precisely in small area like the spray nozzle.
4.2 Protections
It is necessary to place before the machine:
oA water shut off valve.
oAn electrical protection standard, suitable for voltage and power consumption.
4.3 Water supply
Recommended operating pressure from 1.5 MPa to 6 MPa
Water connection pin 3/8"
The water supply pipes must resist to 145 Psi / 10 MPa
4.4 Drain
Without pressure.
A tip on the outlet of the machine and a pipe is supplied with the machine
Ensure a connection that causes no risk of fluid return, and ensure good drainage:
The drain pipe must be located lower than the machine.
Do not create a bend in the exhaust tube.
4.5 Supplying voltage
To be specify when ordering : 230V –50/60Hz Monofase
Or : 400V –50/60Hz Trifase

MONTE-CARLO - 11/2015 - SOFT V 2.11 6
4.6 Water softeners
When the mains water has a high hardness (>10°TH ou >4 °KH), it is recommanded:
oTo use a water treatment
oTo regenarate regularly the filters.
What is the total Hardness of the water ?
oThis is the amount of calcium and magnesium ions in the water.
oThese ions are partly responsible for limestone formation.
oIt is measured with the test strip provided with the machine.
oThe unit of measurement is the ° French (° TH) or the ° German (° dH).
What is the Karbonat Hardness of the water?
oThis is the amount of Carbonate Calcium ions and Carbonate Magnesium ions in the
water.
oThese ions are completely responsible for limestone formation.
oIt is measured with chemical dropper testers.
oThe unit of measurment is ° Carbonate (°KH)
There are 2 types of water treatments:
Salt water softeners
oThey treat the total water hardness (°TH)
oBy an exchange of sodium ions with calcium and magnesium ions.
oThey require periodic regeneration of the resins by the user.
oTo use when the water hardness is > à 10°TH or > 5 °GH
Resins filters :
oThey treat the Carbonat hardness water (°KH)
oBy fixing carbonate ions on the resins.
oOften fitted with microfiltration and carbon filtration.
oTo use when the Carbonat Hardness is > à 6°KH
oHighly recommended by the manufacturer :
The machines are equipped with suitable protection in accordance with flowrate
and the water encountered.
The changing cartridges is carried out by the technical service, at intervals to
be determined

MONTE-CARLO - 11/2015 - SOFT V 2.11 7
5 FIRST INSTALLATION:
A. Open the water supply tap
B. Switch on the machine using the ON/OFF switch under the drip tray.
C. During 1 second
The general display shows the software version “Monte Carlo 2.11”.
D. According the situation the display shows:
E. Enter the password to access the first installation, as follows:
1° step:
Press MENU for 6 seconds
2° step:
Press:
ON/OFF Switch
OFF
OFF
MC 2.11
Please
wait!
Push "where you want" on the display during
3 sec until:

MONTE-CARLO - 11/2015 - SOFT V 2.11 8
3° step:
Press:
4° step:
Press:
5° step:
The display shows:
F. The display shows:
Let the machine doing the 1° installation.
During this time, the air inside coffee groups are automatically vaccum by an opening cycle of vaccum
valves, pump and groups valves.
G. The process is finished when the display shows:
Press
H. The display shows:
First Install
First Install
No
First Install
Yes
First Install
In progress
First Install
Press twice

MONTE-CARLO - 11/2015 - SOFT V 2.11 9
6 STARTING & WARM UP:
A. Switch ON the machine by pressing on the main display.
B. The key boards are lighting, and shows the coffee boilers temperature settings
Coffee buttons are blinking. General display blinking
C. When the temperature setting of coffee boilers is reached (2 or 3 minutes): automatic purge goes on.
The leds stay On General display blinking
D. When the steam boiler temperature reaches 105°C: hot water button lights up.
The leds stay On General display blinking
E. When the steam boiler temperature setting is reached (ex.125°C).
The machine is ready. All the lights stay On.
General display shows manometers
Please
wait!
95°C
95°C
95°C
95°C
Please
wait!
Please
wait!
95°C
95°C

MONTE-CARLO - 11/2015 - SOFT V 2.11 10
F. Main display
When the machine is ready, the general display shows:
Boiler pressure (bar) Pressure
(network/pump pressure)
Level information
(In progress)
Press “where you want” on the display, during 3 sec to switch OFF the machine
The display shows:
ON/OFF
Inhaltsverzeichnis
Andere Conti Kaffeemaschine Handbücher

Conti
Conti CC100 Technisches Handbuch

Conti
Conti CC102 D Technisches Handbuch

Conti
Conti CC200 D Leitfaden

Conti
Conti CC100 Leitfaden

Conti
Conti Xeos EVOLUTION 2 Leitfaden

Conti
Conti TOUTAUTO 388 Installationshandbuch

Conti
Conti ACE Bedienungsanleitung

Conti
Conti X-one Technisches Handbuch

Conti
Conti Monaco MC Leitfaden

Conti
Conti Kahveci Bedienungsanleitung





















