Curtis Sno-Pro 5FBMSB Bedienungsanleitung

FRONT END LOADER BLADES
For Tractor and Skid-Steer Loaders
Assembly & Mounting Instructions
Curtis Industries Inc. LLC, 111 Higgins St., Worcester, MA 01606 TEL: (800) 343-7676 FAX: (508) 854-3377 For Parts and information visit us at www.Curtisindustries.net
Curtis Industries Inc. LLC, reserves the right to change product design or specifications without notice or liability.
Curtis Snow Plows are protected by the following U.S. Patent Numbers: 6,145,222 and 6,209,231 Licensed under U.S. Patent Number 5,568,694 & Canadian Patent Number 2,137,853.
Other patents pending.
Do not attempt to install or operate Front End Loader Blade
without reading and understanding all Warnings and Instructions
in this Manual and on the Loader Blade.
WARNING
ALWAYS travel at reduced speed when Loader Blade is attached.
ALWAYS ensure Lift Chain (if used) is securely attached to Grab Hook.
ALWAYS familiarize yourself with area to be plowed.
DO NOT exceed 10 mph when plowing snow.
DO NOT exceed 5 mph if obstructions could be encountered when plowing.
ALWAYS lower Loader Blade to ground when not in use.
DO NOT position any part of your body under Loader Blade.
DO NOT use any part of your body when dislodging an obstruction from
Loader Blade Assembly.
DO NOT service Loader Blade in tripped condition. Dangerous release of
stored energy may result.
1 of 14
NOTE: Curtis F.E.L.B.’s are suited for installation on Tractors and Skid Steer Vehicles up to 47HP.
F.E.L.B. Standard Mount - Part Number 5FBMSB
F.E.L.B. Skid Steer Mount - Part Number 5FBMSS
F.E.L.B. John Deere Quick Attach Mount - Part Number 5FBMQA
Rev A October 11th, 2012

Figure 1. Front End Loader Blade Illustrated Parts List
Tractor Arms
Tractor Arms
1
7
8
3
Bypass
Relief Valve
See Detail
22
6
2
4
20
4
18
18
19
23
26
25
25
16
15
5
9
12
11
10
13
14 21
17
24
28
DETAIL
27
27
28
2 of 14

3 of 14
Figure 2. Front End Loader Blade Illustrated Parts List (continued)
NO.
STANDARD MOUNT LOADER PARTS
PART NO. DESCRIPTION QTY. NOTES
1
2
3
4
5
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
BUY REPLACEMENTS LOCALLY
REPLACEMENTS SOLD AS SET OF 4 (2L & 2R)
FOR 5FBMSB ONLY
FOR 5FBMSS ONLY
FOR 5FBMQA ONLY
REPLACEMENTS SOLD AS SET OF 4 (2L & 2R)
REPLACEMENTS SOLD AS SET OF 4 (2L & 2R)
REPLACEMENTS SOLD AS SET OF 4 (2L & 2R)
BUY REPLACEMENTS LOCALLY
BUY REPLACEMENTS LOCALLY
BUY REPLACEMENT LOCALLY
BUY REPLACEMENT LOCALLY
2 PER SET
5' Moldboard Kit
6' Moldboard Kit
6.5' Moldboard Kit
7' Moldboard Kit
7.5' Moldboard Kit
8' Moldboard Kit
Trip Frame
A-Frame
A-Frame
A-Frame
Skid Shoe
5' Cutting Edge
6' Cutting Edge
6.5' Cutting Edge
7' Cutting Edge
7.5' Cutting Edge
8' Cutting Edge
4
2
2
4
4
4
4
4
1
1
1
Trip Springs
L Moldboard Spring Mount Bracket
R Moldboard Spring Mount Bracket
Spring Eyebolt
5/8"-11 Nylon Locknut
5/8"-11 Jam Nut
1" x 4" Clevis Pin
3/16" x 1-1/2" Cotter Pin
1"-8 x 6" Gr. 5 Bolt
1"-8 Nylon Locknut
Blade Markers
6
7
8
9
10
11
12
13
14
15
16
2
2
Loader Bracket - Right
Loader Bracket - Left
27
28
1
2
1
2
2
1
2
2
5/16" x 50" Lift Chain
5/16" Anchor Shackle
Grab Hook
1 x 3" Clevis Pins
1 x 4" Clevis Pin
By-Pass Relief Valve
Hydraulic Hose
10" Angle Cylinder
17
18
19
20
21
22
23
24
1TBP21D
1TBP21E
1TBP21F
1TBP21G
1TBP21AF
1TBP21BF
1TBP22B1
1TBP29A
1FELB1BW
1TBP29Q
1TBP50
1TBP49D
1TBP49E
1TBP49F
1TBP49G
1TBP49A
1TBP49B
1TBP33
8SV-TBP133LR-B5
8SV-TBP133LR-B5
1TBP34
1TBP36
SN-MK1307
1TBP23
1TBP24
1TBP25
1TBP26
1TBP37
1TBP170
1TBP170
4
2
90º Angle for Bypass Relief Valve
10.5 Ft. Hydraulic Hose
25
26
1TBP71-B
1TBP98U
1TBP30A
1TBP31
1TBP77
1TBP73
1TBP23
1TBP71
1TBP72
1TBP27

1.) Lay Moldboard on its face with ribbing up. To prevent paint damage place cardboard under top bend.
2.) If assembling a 5' to 7' Moldboard skip to Step #3. If assembling a 7-1/2' or 8' Moldboard, locate four Mold-
board Spring Mount Brackets, two left (1TBP133L) and two right (1TBP133R). Refer to Figure 1.
Moldboard Spring Mount Brackets must be installed with Spring Mounting Tab pointing towards the outside of
Moldboard. Refer to Figure 3.
Mount each Moldboard Spring Mount Bracket using three 3/8"-16 x 1-1/4" Gr.8 Bolts (1TBP25), six Flat
Washers (supplied) and three Nylon Locknuts (1TBP36). Torque all Bolts to 30 ft./lbs.
3.) Assemble Trip Frame (1TBP22B) to Moldboard using four 1" x 4" Clevis Pins (1TBP23) and secure each with
a 3/16" Cotter Pin (1TBP24). Refer to Figure 4.
When installing Clevis Pins, work from Left to Right. Refer to Figure 4 for correct orientation of Clevis Pins
before installing. All Clevis Pins should be installed pointing towards the A-Frame. Tap with Hammer or Mallet
if needed to ease installation.
4.) The F.E.L.B. has been designed with adjustable trip performance. Two Trip Spring mounting holes are
located on all three Trip Frame Spring Mounting Tabs, one Upper and one Lower. Refer to Figure 6.
The Upper Spring mounting holes will give a lighter trip when encountering an obstacle.
The Lower Spring mounting holes will give a heavier trip when encountering an obstacle.
4a. Thread one 5/8"-11 Jam Nut (SN-MK1307) half way onto each of the four Spring Eyebolts (1TBP34).
4b. Insert Trip Spring (1TBP33) end into hole on Spring Eyebolt, then insert each Spring Eyebolt into hole in
Moldboard Spring Mounting Bracket (orient Trip Springs as shown in Figure 5). Thread one 5/8" Nylon
Locknut (1TBP36) onto each of the Spring Eye Bolts.
4c. Tighten the Nylon Locknuts until Trip Springs are taught. Do not overtighten Trip Springs when installing.
Fully tighten Jam Nuts.
4d. Install supplied orange plastic End Caps to Spring Eyebolt ends to prevent corrosion.
5.) Install Blade Markers (1TBP37) to Moldboard ends using supplied 5/16" Hardware. Refer to Figure 7.
4 of 14
Curtis Front End Loader Blade (F.E.L.B.) Assembly Instructions
Figure 3. Install Spring Mounting Brackets to Moldboard
L Moldboard Spring
Mount Bracket (2)
R Moldboard Spring
Mount Bracket (2)
3/8"-16 x 1-1/4"
Gr.8 Bolt
3/8"-16 x 1-1/4"
Gr.8 Bolt
Flat Washer
Flat Washer
Flat Washer
Nylon Locknut
NOTE: Refer to direction of hardware when mounting Brackets.
The Torque Spec on all Mounting Bolts is 30 ft./lbs.
Nylon Locknut
Flat Washer
LEFT SIDE BRACKETS
RIGHT SIDE BRACKETS
MOLDBOARD
Spring Mount Tab
Spring Mount Tab
NOTE

5 of 14
Figure 4. Mount Trip Frame to Moldboard
Figure 5. Install Trip Springs
Tighten Locknuts on Eyebolts until
correct Spring tension is achieved
A
B
Install
End Caps
End Cap
Install Clevis Pin and secure with Cotter Pin
Note orientation of
Left and Right Clevis Pins
Trip Frame is attached to Moldboard
with 4 Clevis Pins in locations shown
1
2
3
4
TRIP FRAME
LEFT SIDE
TRIP FRAME
LEFT SIDE
MOLDBOARD
Looking down on Trip Frame
1" x 4"
Clevis Pin
Cotter Pin

6 of 14
Figure 6. Trip Spring Installation - Adjustable Trip Performance
Figure 7. Blade Marker Mounting
Use Lower four Holes for heavier
Plow trip when striking an obstacle
Use Upper four Holes for lighter
Plow trip when striking an obstacle
Trip Frame Spring Mounting Tabs on Trip Frame
TRIP FRAME FRONT VIEW
Supplied
5/16" Bolts
Supplied
5/16" Washers & Nuts
NOTE: Mounting is identical for both Blade Markers

Curtis Front End Loader Blade (F.E.L.B.) Assembly Instructions (continued)
7.) Locate both 10" Angle Cylinders (1TBP27) and mount one to each side of the A-Frame. The Angle Cylinders
will be inserted into the A-Frame at the front through the slots, with the Hydraulic Port facing up and visible
through the opening at the top of the A-Frame. Mount each Angle Cylinder to the A-Frame with a 1" x 3" Clevis
Pin (1TBP73) and secure each Clevis Pin with a 3/16" x 1-1/2" Cotter Pin (1TBP24). Refer to Figure 8.
8.) Lift the A-Frame above the Trip Frame, and insert the A-frame and Angle Cylinders into the Trip Frame.
Apply grease to the 1"-8 x 6" Gr.5 Center Bolt (1TBP25) and insert through the Trip Frame and A-Frame.
Secure the Center Bolt with a 1" Nylon Lock Nut (1TBP26). Refer to Figure 9.
Do not over tighten the Nylon Lock Nut, the A-Frame must pivot freely.
9.) Swing A-Frame to Left or Right and align hole in Angle Cylinder Ram with the corresponding hole in Trip
Frame. Install (1) 1" x 4" Clevis Pin (1TBP23) through Trip Frame and Angle Cylinder Ram.
Secure Clevis Pin with (1) 3/16" x 1-1/2" Cotter Pin (1TBP24). Swing A-Frame to opposite side and
repeat alignment and pinning procedure. Swing A-Frame back to the center.
It may be necessary to extend the Angle Cylinder Piston Rod 1-2" to make
the connection to the Trip Frame. To do this, insert a long pin or ratchet handle
through the Piston Rod and work the piston Rod side to side while pushing downward.
10.) Return the A-Frame to the center position after the Angle Cylinders are secured to the Moldboard.
Using the A-Frame as a lever, grasp the A-Frame by the cross-brace and pull back, raising the Moldboard
to a vertical position.
Figure 8. Mount Angle Cylinders to A-Frame
1" x 3"
Clevis Pin
1" x 3"
Clevis Pin
Angle Cylinders are
inserted into slots in
the front of A-Frame
3/16" x 1-1/2"
Cotter Pins
install from
below
Hose Ports up
NOTE
NOTE
7 of 14

8 of 14
Figure 9. Mount A-Frame to Trip Frame
1" Nylon
Lock Nut
1" x 6" Bolt
Apply Grease
3/16" x 1-1/2"
Cotter Pin
3/16" x 1-1/2"
Cotter Pin
1" x 4" Clevis Pin
S
w
i
n
g
A
-
F
r
a
m
e
L
&
R
t
o
i
n
s
e
r
t
P
i
n
s
1" x 4" Clevis Pin
11.) Locate and install the two Hydraulic Hoses (1TBP72) to each side of the By-Pass Relief Valve and to the
corresponding Ports on the Left and Right Angle Cylinders.
Do not use Teon Tape on the Hydraulic Fittings as it may contaminate the Hydraulic
System causing a malfunction. Use a high quality paste type thread sealant on all N.P.T.
ttings.
Due to the large number of variations in tractor hydraulic systems and ttings, two hoses
with 1/4" male NPT threads have been provided to connect between the tractor and
By-Pass Valve, but ttings and quick connectors have not. Most skid steer loaders
have extra lines which can be tied into. Some tractors have an auxillary valve that can be
used, or an optional valve kit can be purchased from Curtis. The last option is to connect
the lines from the loader tilt cylinders and tie them into the bypass block. Be sure to
connect before the T-Fitting that connects the left and right tilt cylinders. If using this
option the loader blade will need to be supported with Lift Chain provided. See Step 12
below.
12.) Attach Lift Chain (1TBP30A) to A-Frame assembly with 5/16" Anchor Shackle (1TBP31).
IMPORTANT
IMPORTANT

Figure 10. Install Hydraulic Hoses
Figure 11. F.E.L.B. with Skidsteer Reference View
Connect Hydraulic Hoses
from L & R Angle Cylinders
to By-Pass Relief Valve
Relief Valve
9 of 14

10 of 14
Mounting F.E.L.B. with Loader Attachment Brackets
1.) Center A-Frame (1TBP29A) in front of the Tractor. Position one or both Loader Brackets (1TBP170) to align
with each of the Tractor Loader Arms, depending on width. Refer to Figure 12.
2.) Fully seat the tongue and groove cutouts of the L & R Loader Brackets into A-Frame Rear Cross Brace.
Position L & R Loader Brackets so that the outboard bracket bolt holes line up with
slots in Rear A-Frame Cross-Brace. This may result in two of the same bracket on each
Loader Arm depending on Loader Arm width.
3.) Verify 1/8" clearance on either side of Tractor Loader Arms. Attach the outboard L& R Loader Brackets
to A-Frame Rear Cross Brace by bolting through the slots in the A-Frame. Use 1/2" x 1-3/4" Bolts in top of
A-Frame (2 per bracket). Use 1-1/2" length Bolts in all other holes (3 per Bracket).
Install 1-1/2" Bolt through front of A-Frame Cross Brace rst.
4.) Position inboard Brackets with a 1/8" clearance and clamp in place. Drill 9/16" holes into the A-Frame Cross-
Brace using the holes in the Loader Brackets as guides. Bolt inboard Brackets to A-Frame Rear Cross Brace
with 1/2" x 1-3/4" Bolts in the top of the A-Frame (2 per Bracket) and 1-1/2" length Bolts in all other holes.
Torque all Loader Bracket Bolts to 98 ft./lbs.
• Loader Brackets L & R are to be bolted to the A-Frame in accordance with the I.D. and
O.D. of Loader Arms. Tongue and Groove design allows installer to slide Brackets into
position. Leave 1/8" clearance for Easy On/Easy Off.
• Due to Tractor Loader Arm variations, Dealer/Customer is to supply Attachment Pins.
Curtis recommends a Grade 8 Bolt and Nylon Locknut of the proper length and diameter.
After 2 hours of use, all bolted assemblies on the F.E.L.B. should be rechecked for
proper torque specications and tightened as needed.
Figure 12. Mounting F.E.L.B. with Standard Mount Loader Brackets L & R
Tractor Arms
Tractor Arms
Standard Mount
Loader Brackets - Left and Right
Standard Mount
Loader Brackets - Left and Right
Center A-Frame in front of Tractor
Tractor Loader Arm width
determines whether one or
both Loader Brackets will be
used on each side
Loader Brackets bolt through slots
A-Frame Cross
Brace
NOTE
NOTE
ADDITIONAL
NOTES
IMPORTANT
Dieses Handbuch passt für folgende Modelle
2
Inhaltsverzeichnis

















