Endress+Hauser Liquistation CSF48 Bedienungsanleitung

BA463C/07/EN/04.10
71110731
Valid as of:
Software version 01.01.00
Operating Instructions
Liquistation CSF48
Automatic sampler for liquid media
Maintenance & diagnostics

About this manual
This manual describes all the tasks you must perform for maintenance, diagnostics and
troubleshooting.
A description of the following is provided here:
• "Diagnostics" menu
– Diagnostics list
– Logbooks
– System information
– State of Outputs
– Systemtest/Reset
– Sensor change
– Manual hold
– Term information
– Simulation
– Sensor information
• Cleaning and maintenance
• Troubleshooting
• Accessories and spare parts
This manual does not include the following:
• Setup/General settings
--> Operating Instructions BA443C "Commissioning"
• Display/Operation
--> Operating Instructions BA443C "Commissioning"
• Inputs
--> Operating Instructions BA464C "Operation&settings"
•Outputs
--> Operating Instructions BA464C "Operation&settings"
• Sampling programs
--> Operating Instructions BA464C "Operation&settings"
• Additional functions
--> Operating Instructions BA464C "Operation&settings"
• Data management
--> Operating Instructions BA464C "Operation&settings"
• Calibration
--> Operating Instructions BA467C "Calibration"
• Expert
--> Internal Service Manual

Endress+Hauser
Liquistation CSF48
Table of contents
1 Maintenance. . . . . . . . . . . . . . . 4
1.1 Recommended maintenance . . . . . . . . . . . 4
1.2 Replacing the pump tube . . . . . . . . . . . . . . 5
1.3 Cleaning . . . . . . . . . . . . . . . . . . . . . . . . . . 7
1.4 Calibration . . . . . . . . . . . . . . . . . . . . . . . . 12
1.5 Replacing the storage batteries . . . . . . . . . 13
2 Diagnostics menu . . . . . . . . . . 14
2.1 Diagnostics list . . . . . . . . . . . . . . . . . . . . . 14
2.2 Logbooks . . . . . . . . . . . . . . . . . . . . . . . . . 14
2.3 System information . . . . . . . . . . . . . . . . . 18
2.4 Status of inputs/outputs . . . . . . . . . . . . . . 20
2.5 Systemtest/Reset . . . . . . . . . . . . . . . . . . . 20
2.6 Sensor change (for version with sensors with
the Memosens protocol) . . . . . . . . . . . . . . 23
2.7 Manual hold (for version with sensors with the
Memosens protocol) . . . . . . . . . . . . . . . . . 24
2.8 Term information . . . . . . . . . . . . . . . . . . . 24
2.9 Simulation . . . . . . . . . . . . . . . . . . . . . . . . 24
2.10 Sensor information (for version with sensors
with the Memosens protocol) . . . . . . . . . . 25
3 Troubleshooting . . . . . . . . . . . 26
3.1 Troubleshooting . . . . . . . . . . . . . . . . . . . . 26
3.2 System error messages . . . . . . . . . . . . . . . 26
3.3 Device-specific errors . . . . . . . . . . . . . . . . 46
3.4 Process errors without messages . . . . . . . . 47
3.5 Return . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
3.6 Disposal . . . . . . . . . . . . . . . . . . . . . . . . . . 53
3.7 Software history . . . . . . . . . . . . . . . . . . . . 53
4 Accessories. . . . . . . . . . . . . . . 54
4.1 Accessories for Liquistation CSF48 . . . . . . 54
4.2 Measuring cable . . . . . . . . . . . . . . . . . . . . 55
4.3 Sensors . . . . . . . . . . . . . . . . . . . . . . . . . . 55
5 Spare parts . . . . . . . . . . . . . . . 58
5.1 Peristaltic pump . . . . . . . . . . . . . . . . . . . . 58
5.2 Vacuum pump . . . . . . . . . . . . . . . . . . . . . 59
5.3 Climate control module . . . . . . . . . . . . . . 61
5.4 Sample compartment . . . . . . . . . . . . . . . . 62
Index . . . . . . . . . . . . . . . . . . . 63

Maintenance Liquistation CSF48
4Endress+Hauser
1 Maintenance
#Warning!
Process pressure and temperature, contamination, electrical voltage
Danger! Risk of serious or fatal injury!
• De-energize the device before removing the rear panel.
• Power can be supplied to switching contacts from separate circuits. De-energize these circuits
before working on the terminals.
• If a sensor has to be removed during maintenance work, avoid hazards posed by pressure,
temperature and contamination.
"Caution!
Electrostatic discharge (ESD)
Risk of damaging the electronic components!
• For your own safety, only use genuine spare parts. With genuine parts, the function, accuracy
and reliability are also ensured after maintenance work.
• Take personal protective measures to avoid ESD.
1.1 Recommended maintenance
Maintenance work has to be carried out at regular intervals to ensure the efficient operation of
the sampler.
The maintenance work comprises:
• Replacing the wear parts
• Cleaning the device
The cleaning intervals depend heavily on:
• The medium
• The ambient conditions of the sampler (dust etc.)
• The programming intervals
For this reason, adapt the cleaning intervals to your specific requirements but always ensure that
these cleaning tasks are performed regularly.
Replacing wear parts
Wear parts are replaced by Endress+Hauser Service at one- and two-year intervals. Please
contact your local sales center in this regard.
Endress+Hauser offers its customers a maintenance contract. With a maintenance contract,
you can increase your level of operational safety and relieve your operating staff of some of
their workload. Ask your Endress+Hauser Service Organization for detailed information on
maintenance contracts.

Liquistation CSF48 Maintenance
Endress+Hauser 5
1.2 Replacing the pump tube
#Warning!
Danger! Rotating parts!
• Take the sampler out of service before opening the peristaltic pump.
• Safeguard the sampler against accidental operation while working on the open peristaltic
pump.
Open the peristaltic pump as follows:
1. Take the sampler out of service by pausing a program that is currently running.
2. Open the fastening clip (item 3) and push the pump bracket (item 4) upwards.
3. Remove the knurled head screw (item 7) and open the pump head cover (item 5) to the
right.
a0014115
Fig. 1: Opening the peristaltic pump
1
2
3
4
5
6
7
Retainer
Pump tube
Fastening clip
Pump bracket
Pump head cover
Positioning pin
Knurled head screw

Maintenance Liquistation CSF48
6Endress+Hauser
1. Remove the clamp (item 8) and remove the pump tube (item 2) from the pump.
2. Remove any silicone deposits on the roller (item 10) and the flexible pump bracket.
3. Make sure the roller turns smoothly and evenly.
4. Apply some lubricant to the roller.
5. Secure the new pump tube to the pressure sensor with the clamp (item 8).
6. Guide the pump tube around the roller and insert the marking ring into the groove
(item 9), see →å2.
7. Close the pump head cover and screw it tight. Close the pump bracket.
8. Under Menu/Diagnostics/Term information/Pump tube life reset the tube life to zero by
selecting "Reset".
Calibrate the sample volume each time you replace a pump tube. --> See Operating
Instructions BA467C "Calibration".
"Caution!
Incorrect sample volume
Only reset the tube life counter to zero once you have successfully replaced the pump tube in
order to avoid incorrect dosing of the medium.
a0014116
Fig. 2: Replacing the pump tube
1
2
8
9
10
Retainer
Pump tube
Clamp
Marking ring
Roller
1
2
1
8
9
10

Liquistation CSF48 Maintenance
Endress+Hauser 7
1.3 Cleaning
1.3.1 Housing
Clean the housing with commercially available cleaning agents.
"Caution!
Danger of damaging the housing surface or housing seal!
Never use any of the following to clean the device:
• Concentrated mineral acids or bases
• Benzyl alcohol
• Methylene chloride
• Methanol
•Xylene
• Concentrated glycerol cleaner
• High-pressure steam
1.3.2 Wetted parts
After cleaning, rinse all wetted parts thoroughly with clear water to ensure that all cleaning
agent residue has been removed so it cannot affect subsequent medium samples.
Version with vacuum pump
a0013896
Fig. 3: Version with vacuum pump
1Outlethose
2 Dosing chamber
3 Dosing chamber cover
4Airhoseconnection
5 Lock for intake hose
6 Thread adapter nut for intake hose
1
2
6
3
4
5

Maintenance Liquistation CSF48
8Endress+Hauser
Clean the wetted parts as follows:
1. Release the thread adapter nut on the intake hose (item 6).
2. Turn the intake hose to the "open" position at the hose lock (item 5) and remove the hose
from above.
3. Release the air hose (item 4) and remove the dosing chamber (item 2) from the front along
with the outlet hose (item 1).
4. Open the bayonet lock (item 3) and open the dosing chamber.
5. Clean these parts (hoses, dosing chamber etc.) with water or soapsuds. Use a bottle brush
if necessary.
You can wash the dosing chamber and dosing chamber cover in a dishwasher at 60
˚C.
6. Make sure the dosing pipe is set correctly.
7. Reinstall the cleaned parts in reverse order.
Version with peristaltic pump
a0014004
Fig. 4: Version with peristaltic pump
1Pumptube
2 Pressure sensor
3 Tube connection
Clean the wetted parts as follows:
1. Release the sample supply at the tube connection (item 3).
2. Connect a container containing clear water to the tube connection.
3. Remove the bottles from the sample compartment.

Liquistation CSF48 Maintenance
Endress+Hauser 9
4. Rinse the wetted parts with clear water by taking a manual sample or by performing a
pump test (under Menu/Diagnostics/Systemtest/Reset/Peristaltic pump -> Pump
forward/Pump reverse).
5. Release the couplings to the left and right of the pressure sensor (item 2). Clean the tube
piece carefully with a bottle brush.
6. Reconnect the sample supply to the tube connection and put the bottles back in the sample
compartment.
Interior of peristaltic pump
#Warning!
Danger! Rotating parts!
• Take the sampler out of service before opening the peristaltic pump.
• Safeguard the sampler against accidental operation while working on the open peristaltic
pump.
1. Take the sampler out of service by pausing a program that is currently running.
2. Open the peristaltic pump as described in the "Replacing the pump tube" section.
3. Remove the pump tube.
4. Remove any silicone deposits on the roller and the flexible pump bracket.
5. Make sure the roller turns smoothly and evenly.
a0014029
Fig. 5: Interior view of the peristaltic pump
1
2
3
Pump rotor
Roller
Pump tube
1
2
3

Maintenance Liquistation CSF48
10 Endress+Hauser
Cleaning the distribution arm
a0014112
Fig. 6: Sample compartment
1 Distribution arm motor
2Outletpipe
3 Distribution arm
Clean the distribution arm as follows:
1. Release the outlet pipe (item 2).
2. Push up the splash guard.
3. Remove the distribution arm from the front.
4. Remove the cover.
5. Clean these parts with water or soapsuds. Use a bottle brush if necessary.
6. Reinstall the cleaned parts in reverse order.
1.3.3 Sample compartment
The sample compartment has a fully integrated plastic inner lining.
Clean the sample compartment as follows:
1. Remove the bottle trays and the distribution pan.
2. Remove the distribution arm.
3. Spray-clean the sample compartment with a water hose.
You can wash the PE and glass bottles in a dishwasher at 60 ˚C.
1
2
3
Andere Handbücher für Liquistation CSF48
13
Inhaltsverzeichnis
Beliebte Kühlschrank Handbücher anderer Marken

Bonnet Neve
Bonnet Neve SKYVIEW PLUS Bedienungsanleitung

Zanussi Electrolux
Zanussi Electrolux ZERB 8441 Bedienungsanleitung

Sharp
Sharp SJ-BA31IEXW2-EU Bedienungsanleitung

CORBERO
CORBERO CC2300MCW Bedienungsanleitung

KitchenAid
KitchenAid 2205264 Bedienungsanleitung

Stengel
Stengel KU 1101 A++ Bedienungsanleitung











