Envision FAIRWAY RAILING A210 Benutzerhandbuch

• •
A210
3-RAIL
ALUMINUM
RAILING
INSTALLATION
QUICK GUIDE
SQUARE ALUMINUM BALUSTERS
TOOLS NEEDED:
• Drill with #2 Square Drive Bit
• Circular Saw
• Speed Square
• Tape Measure
• Drill Extenstion
LEVEL & STAIR*
KIT INCLUDES:
•Top Rail
•Sub-Rail with Rail Insert
• Mid Rail with Rail Insert
•Bottom Rail with Rail Insert
• Top Rail Connector
Brackets with Screws
• Bottom Rail Connector
Brackets with Screws
• Rail Support(s)
•
Square Aluminum Balusters
•Installation Template
(*not included in stair kit)
™
BY ™

BEFORE STARTING
• Review all local building codes.
• Wear proper safety equipment.
STEP 1 GETTING STARTED
• Plumb all posts or mounting surfaces. Install post trim at this time.
• Determine required bottom rail height from deck surface to bottom of rail
based on local building codes.
STEP 2 INSTALL MOUNTING BRACKETS
• Using the installation template, insert brackets into bracket hole cut-outs and install using
#8 x 1-1/2” screws – bottom bracket hole for bottom rail, middle bracket hole for mid-rail
and top bracket hole for top rail.
STEP 3 CUT RAILS & INSTALL BOTTOM RAIL
• Measure distance between the inside of posts.
• Mark bottom rail to correct length. Subtract 3/8” from bracket mark on each end. Repeat
for all top, mid and bottom rail bracket marks.
• Ensure there is equal & maximum distance from baluster holes on both ends of top, mid
and bottom rails.
• Cut bottom rail, mid-rail, top sub-rail, and top cap rail the same length, ensuring baluster
holes line up.
• Slide bottom bracket cover onto both sides of the rail and set rail into place. Secure rail by
installing two #8 x 3/4” self-drilling screws through holes in both sides of each bracket.
Snap bracket cover over the bracket.
STEP 4 INSERT BALUSTERS
• Insert balusters into bottom rail making sure they are fully seated into rail.
• Make sure that the “P” insert remains within the bottom rail channel.
A210
LEVEL INSTALLATION
STEP 2
STEP 3
STEP 4
STEP 5
Fairway Architectural Railing Solutions will not be held liable for incorrect or unsafe installations by the installer. It is the installer’s responsibility to secure
proper building permits, review local codes and safety needs and meet or exceed them. The instructions provided by Fairway are a guide and may not
account for every special circumstance. The installer must indentify and execute the installation approach that is appropriate for every application.
“P” Insert
STEP 5 INSTALL MID-RAIL AND TOP RAIL
• Slide mid-rail bracket cover onto both sides of the mid-rail. Holding mid-rail at an angle
above balusters, start at one end and insert rst baluster, working your way across the
remaining balusters until they are seated through the top and bottom of the mid-rail.
• Line up mid-rail with mid-rail brackets and secure rail by installing two #8 x 3/4” self-drilling
screws through holes in both sides of each bracket. Snap bracket cover over the bracket.
• Holding the top sub-rail at an angle above the baluster, start at one end to insert rst
baluster and tap lightly.
• Insert remaining balusters making sure they are seated completely in both bottom and top
sub-rails.
• Slide top bracket cover onto both sides of top rail. Place top cap rail over sub-rail.
• Secure rail by installing two #8 x 3/4” self-drilling screws through holes in both sides of
each top bracket. Snap bracket cover over the bracket.
STEP 6 FINISHING STEPS
• Tap post caps in place.
• Install two-piece, snap together trim.
• Measure to the underside of the bottom rail and cut rail support to measured length.
• Measure to the center of the bottom rail and secure rail support with 3/4” stainless
steel screw.

STEP 1 GETTING STARTED
• Plumb all posts or mounting surfaces. Install post trim
at this time.
• Determine required bottom rail height from deck
surface to bottom of rail based on local building codes.
STEP 2 MARK & CUT RAILS
• Use blocking to achieve desired rail sweep height. Lay
bottom rail onto blocking next to post and clamp using
a quick clamp.
• Balance out baluster end spacing for equal distance at
top and bottom of stairs.
• Place one baluster in each end hole and slide mid-rail
and sub-rail into place.
A210
STAIR INSTALLATION
STEP 3 STEP 4
STEP 2
STEP 1
Fairway Architectural Railing Solutions will not be held liable for incorrect or unsafe installations by the installer. It is the installer’s responsibility to secure
proper building permits, review local codes and safety needs and meet or exceed them. The instructions provided by Fairway are a guide and may not
account for every special circumstance. The installer must indentify and execute the installation approach that is appropriate for every application.
• Making sure balusters are parallel to the posts,
clamp the mid-rail and sub-rail to each post.
Measure mid-rail height to ensure a 36” height
and mark at each post..
• Hold brackets on post next to rail and mark rail at
all bracket locations.
• Unclamp railing section from post.
• Add 3/4” to bracket mark. Repeat for all mid, top
and bottom rail bracket marks.
• Transfer top sub-rail measurement to top cap rail.
• Cut all marks at 90˚ angle and slide bottom
brackets onto ends of rail.
• Place bottom rail onto blocking between posts and
pre-drill bracket holes using a 1/8”drill bit.
• Secure bracket using the provided 1-1/2”
stainless steel screws.
• Insert all of the balusters into bottom rail making sure they
are fully seated.
• Slide mid-rail bracket cover onto both sides of the mid-rail.
Holding mid-rail at an angle above balusters, start at one
end and insert rst baluster, working your way across the
remaining balusters until they are seated through the top
and bottom of the mid-rail.
• Pre-drill bracket holes using 1/8” bit and secure with the
provided 1-1/2” stainless steel screws. Snap bracket cover
over the bracket.
• Insert sub-rail into the top cap rail and slide brackets
covers on both sides of top rail.
• Starting at the top of the stairs, insert rst baluster.
• Insert remaining balusters making sure they are fully
seated in the bottom and top rail.
• Pre-drill bracket holes using 1/8” bit and secure with the
provided 1-1/2” stainless steel screws.
• Secure rail by installing two #8 x 3/4” self-drilling screws
through holes in both sides of each top bracket. Snap
bracket cover over brackets.
STEP 4 FINISHING STEPS
• Tap post caps in place.
• Install two-piece snap-together trim.
STEP 3 INSTALL BRACKETS & RAIL
SECTION
BEFORE STARTING
• Review all local building codes.
• Wear proper safety equipment.

EnvisionOutdoorLiving.com 1-800-598-5245
#909983
© 2021 FAIRWAY ARCHITECTURAL RAILING SOLUTIONS