INSTALLATION
1. It is recommended that a professional sign company be hired to install the scoreboard (see
drawings). Eversan recommends a minimum depth of 8 FT. and 2 ½ FT. footer diameter. Soil
conditions and local codes should be used to determine footer depth and diameter in your
area. All specifications given are to be used as a guide only.
2. Calculate the wind load by standard formula for height and dimension of sign. Dimension of the
sign is 8 FT. High x 18FT. Wide, add height and/or width of any sponsor panels. Approximate
weight is 600lbs. NOTE: Check local codes for your area.
3. Prepare and sink I-beams, minimum I-Beam recommendation W 8 x 24 conforming to ASTM A36,
align with plumb line and careful measurements. Beams should be 14’ apart on center.
4. Determine height of lowest point for scoreboard, minimum recommendation 8FT. Mark and align
on all mounting beams parallel to visual ground sighting. Bolt or weld two Z-brackets, one on each
beam, at this level.
5. Assemble the scoreboard by placing the two halves on sawhorses so that you can reach both the
front and back of the scoreboard. Remove Home innings number 1, 3, 5, 7, and 9 and align the
halves to install 10ea. 5/16” x 1” bolts, washers, lock washers, and 5ea. 5” x 2.5” plates to connect
the two halves. Bolt the 4ea. Angled brackets to the back of the scoreboard with 5/16” x 1” bolts,
washers, and lock washers. If there are Ad panels the angle brackets should also be bolted to the
Ad panel and the Ad panel should be bolted to the scoreboard.
6. Remove the both access covers from the front of the scoreboard and pass the two 9-pin
connectors, 2-black wires with terminal rings, and the yellow wire with a terminal ring from the
bottom section into the top section. Place the 9-pin connector marked HE 1 on Printed circuit
board #2 at the properly marked location. Repeat this process for the connector marked SLAVE 1.
The two black wires are ground. Place these wires on the 8-pin terminal strip on PCB 2 marked
GND. The yellow wire is +28VDC and should be connected to the 8-pin terminal strip on PCB 2
marked +28VDC. 120VAC power can be temporarily connected on the back of the scoreboard for
testing (see the 9370 Internal Wire Locations and PCB Connection dwg’s).
7. The scoreboard can now be tested prior to installing it on the beams. Failure to test the
scoreboard prior to hanging will result in voiding all warrantees. Any problems found during testing
should be reported to Eversan, Inc. at (800) 383-6060 for immediate remedial action. When calling
to report a problem have a detailed description of exactly what is happening. If possible have the
scoreboard in visual sight and the control console in your possession.
8. With proper rigging lift the scoreboard and set it to the Z-brackets. Temporarily secure the
scoreboard to the beams until the top Z-brackets can be installed.