1General Information 6
1.1 Standards 6
1.2 Qualification of assembly staff 7
1.3 Protective equipment for assembly staff 7
1.4 Design information 7
1.4.1 Installation and approval of the heating system .................................................... 7
1.4.2 Information on the installation room (boiler room) ................................................ 8
Boiler room characteristics................................................................................8
Ventilation of the boiler room ............................................................................8
1.4.3 Heating water requirements............................................................................... 8
Combination with storage tank ..........................................................................9
Return lift.......................................................................................................9
1.4.4 Chimney connection/chimney system ................................................................ 10
Draught limiter.............................................................................................. 10
Boiler data for constructing the flue gas system (T4 24-50) ................................. 10
Boiler data for constructing the flue gas system (T4 60-110)................................ 11
2Technology 12
2.1 Dimensions - T4 12
2.2 Technical specifications 13
3Assembly 15
3.1 Transport 15
3.1.1 Positioning..................................................................................................... 15
Positioning using a crane (T4 24-50) ................................................................ 15
Positioning using a crane (T4 60-110)............................................................... 16
3.1.2 Temporary storage ......................................................................................... 16
3.2 Set-up in the boiler room 16
3.2.1 Removing the boiler from the pallet .................................................................. 16
3.2.2 Moving the boiler in the boiler room .................................................................. 16
3.2.3 Minimum distances in the boiler room................................................................ 17
3.3 Assembly work 18
3.3.1 Installing the ash container.............................................................................. 18
3.3.2 Installing the stoker unit.................................................................................. 19
3.4 Electrical connection 20
3.4.1 Removing the controller cover .......................................................................... 20
3.4.2 Laying cables................................................................................................. 21
3.4.3 Mains connection............................................................................................ 22
3.4.4 Note on pumps .............................................................................................. 22
4Commissioning / Decommissioning 23
4.1 Configuring the boiler 23
4.2 Out of service for long periods 23