
3
English
Installing the Cooktop
WARNING
Gas supply pipe must be installed with clearance from knives contacting or
cutting gas lines.
IMPORTANT: Before finally fixing the cooktop into the cabinet, ensure there
is a ventilation hole for air circulation around the cooktop in the cabinet. The
location of the ventilation hole can be located at the rear, sides or bottom of the
cabinet. The minimum diameter is 2” (50mm).
The clearance between the cooktop bottom to the combustible materials is
no less than 1” (25.4mm). Ensure the countertop, surrounding materials and
bonding agents have a temperature rating of no less than 193°F (95°C) to avoid
deformation or discoloration.
1. Affix the roll of butyl tape (included in the cooktop packaging) around the
underside edge of the cooktop. Remove the butyl tape protective film. (Fig. 2)
2. Connect a propane supply line with a ⅜” Flare Female connection to the
cooktop in the upper left rear corner of the cabinet. Tighten the gas line
joint to the cooktop using 2 wrenches.
NOTE: Make sure the gas supply pipe cannot contact any moving parts
after installed. Be sure all openings in the cabinet around the gas line are
sealed at time of installation.
3. Place the cooktop into the cutout and verify that the cooktop is level from
side to side and front to rear. Press on the cooktop edges to seal. (Fig. 3)
Fig. 2 Fig. 3
CCD-0005857 Rev. 01.31.2023