Installation instructions SIPP Node 400 and 500, Version 4, December, 2016
5
extend using a 12mm transparent hose. Make sure that water cannot run back into the
pit and that the ground around the outlet can accept the water.
NOTE!
Make sure the all is right or runo and
that a siphon cannot orm in the hose. Consider possible burial o drainage
pipes or leading the outlet to a draining well.
•Lower the suction hose into the draining well and measure how much it needs to be
shortened by holding the hose up against the unit and checking against the fastening
point for the hose.
•Pull up the suction hose from the draining well and shorten the outer casing to the
required length. Be careful not to cut or damage the hose and the cable inside.
•Install by threading the primer pump cable followed by the suction hose and level sensor
hose through the installation point in the unit.
•Cut the suction hose with a hose cutter to the desired length and attach to the main
pump.
•Coil the primer pump cable around three fingers to the required length and fasten with
two cable ties. Then connect all hoses/cables on the left side of the unit using two cable
ties.
•Connect the main power cable to the main power switch.
•Photograph the installation (minimum from the front and tubing installation)
•Clear up all rubbish from the installation.
•The installation is now ready for commissioning.
•
5Electrical installation
•The customer is responsible for carrying out the electrical installation.
•SIPP Node 400 is a permanently installed unit to be supplied with 230VAC and protected
with 6A.
•SIPP Node 500 is a permanently installed unit to be supplied with 230VAC and protected
with 16A-T or 10A-D.
•The power cable is connected to the unit's main switch. Light on indicates voltage to the
swiitch. To turn on the power to the device turn the switch from 0 to 1.
•
6Commissioning
For commissioning, use the template Installation protocol for the SIPP Node.
•Check the placement and installation o the unit
•Con igure and complete documentation in the SIPP Warehouse
•Veri y and document all points in accordance with the installation protocol
deployment phase by means o the service inter ace.
•
7Documentation
Formaterat: Teckensnitt:Verdana, 10 pt, Fet
Formaterat: Liststycke, Justerat, Punktlista + Nivå: 1 +
Justerad vid: 0,63 c + Indrag vid: 1,27 c
Formaterat: Liststycke, Justerat, Höger: -0,1 c , Avstånd
Efter: 1 Rad, Punktlista + Nivå: 1 + Justerad vid: 0,63 c +
Indrag vid: 1,27 c
Formaterat: Liststycke, Höger: 0 c , Avstånd Efter: 0 pt,
Punktlista + Nivå: 1 + Justerad vid: 0,63 c + Indrag vid:
1,27 c , Mönster: Inget (Vit), Tabbstopp: 1,62 c , Till
vänster + 3,23 c , Till vänster + 4,85 c , Till vänster +
6,46 c , Till vänster + 8,08 c , Till vänster + 9,69 c , Till
vänster + 11,31 c , Till vänster + 12,92 c , Till vänster +
14,54 c , Till vänster + 16,16 c , Till vänster + 17,77 c ,
Till vänster + 19,39 c , Till vänster + 21 c , Till vänster +
22,62 c , Till vänster + 24,23 c , Till vänster + 25,85 c ,
Till vänster