Master Image MI-WAVE3D Bedienungsanleitung

Installation & Operation Manual | MI-WAVE3D
55
MI-WAVE3D
Digital 3D Cinema System
Installation & Operation Manual
Revision No. 2.0

Installation & Operation Manual | MI-WAVE3D
© MASTERIMAGE 3D, Inc.
2
Revision History
Revision
Date
Release Status
Author
Remarks
PD 0.9
Preliminary
Document
PD 1.0
June 5, 2012
Preliminary
Document
RJG
PD 1.1
June 7, 2012
Preliminary
Document
SA
PD 1.2
June 8, 2012
Preliminary
Document
RJG
PD 1.3
June 8, 2012
Preliminary
Document
RJG
2.0
Dec. 14, 2012
Released version
RJG
Copyright © 2005-2012 MASTERIMAGE 3D, INC
All Rights Reserved
MASTERIMAGE 3D, INC. Proprietary
All other trademarks and copyrights are the property of their respective owners.

Installation & Operation Manual | MI-WAVE3D
© MASTERIMAGE 3D, Inc.
3
Locations
MASTERIMAGE 3D, INC
5358 Melrose Ave., 4th Floor
Hollywood CA 90038
TEL: (323) 606-7800
FAX: (323) 960-8008
MASTERIMAGE 3D ASIA, LLC.
22F, BYC HIGHCITY B/D A,
371-17, Gasan-dong, Geumcheon-gu,
Seoul 153-803, South Korea
TEL.: +82-2-3438-1600
FAX: +82-2-3438-1698
MASTERIMAGE 3D EUROPE, PLC
Pinewood Studios
Pinewood Rd., Iver Heath
Buckinghamshire
England
SL0 0NH
TEL: +44 1753 785131
Fax: +44 1753 656050
URL: Uhttp://www.MASTERIMAGE3d.com
Email Contact: support@MASTERIMAGE3d.com

Installation & Operation Manual | MI-WAVE3D
© MASTERIMAGE 3D, Inc.
4
Table of Contents
1. Introduction ............................................................................................................6
1.1. Welcome.......................................................................................................................6
1.2. Contacting Technical Support .......................................................................................6
2. Warnings and Cautions..........................................................................................7
2.1. Installation Consideration..............................................................................................7
2.2. Heat Damage................................................................................................................7
2.3. General Electrical Safety...............................................................................................7
2.4. General Handling..........................................................................................................7
3. System Overview ...................................................................................................8
3.1. The Next Wave in Digital 3D Projection.........................................................................8
4. Installation and Configuration.................................................................................9
4.1. Unpacking the MI-WAVE3D..........................................................................................9
4.2. Confirm Package Contents of MI-WAVE3D.................................................................10
5. Detailed Component Overview.............................................................................11
5.1. Liquid Crystal Polarization Modulator (LCPM).............................................................11
5.2. Actuator ......................................................................................................................12
5.3. Control Box –Front Panel...........................................................................................13
5.4. Control Box –I/O Rear Panel......................................................................................13
5.5. Control Box –Rack Mount ..........................................................................................14
6. System Setup.......................................................................................................14
6.1. Installation Options......................................................................................................14
6.2. Projector Lens Consideration......................................................................................15
6.3. Initial Actuator/LCPM Assembly..................................................................................16
6.3.1. Attach Actuator to Horizontal Frame Rail ...........................................................16
6.3.2. Attach LCPM Frame to Actuator ........................................................................16
6.4. Control Box Cable Connections ..................................................................................18
6.4.1. LCPM Cable ......................................................................................................18
6.4.2. Actuator Connector............................................................................................19
6.4.3. GPIO Cable .......................................................................................................19
6.4.4. DC Power Cable................................................................................................19
6.5. Initial Test....................................................................................................................20
6.5.1. Auto Power On ..................................................................................................20
6.5.2. Actuator Operation –3D Position.......................................................................20
6.5.3. Actuator Operation –2D Position.......................................................................20

Installation & Operation Manual | MI-WAVE3D
© MASTERIMAGE 3D, Inc.
5
7. Basic System Operation.......................................................................................21
7.1. System Ready –Standby Condition............................................................................21
7.2. System Run ................................................................................................................21
7.3. System Stop................................................................................................................21
7.4. System Power Off.......................................................................................................22
8. Projector Configuration.........................................................................................22
8.1. Projector 3D File Configuration ...................................................................................22
8.2. Series II Projectors......................................................................................................22
8.2.1. NEC Series II File Settings for External Server Playback...................................22
8.2.2. Christie Series II File Settings for External Server Playback ..............................23
8.2.3. Barco Series II File Settings for External Server Playback .................................23
8.2.4. IMB Configuration Settings ................................................................................24
9. MI-WAVE3D Detailed Operation..........................................................................25
9.1. MI-WAVE3D Menu Tree..............................................................................................25
9.2. Explanation of Menu Items..........................................................................................27
9.2.1. 3D Phase –Sync Polarity ..................................................................................27
9.2.2. 3D Phase –Offset..............................................................................................28
9.2.3. 3D Position ........................................................................................................28
9.2.4. Automation Source ............................................................................................29
9.2.5. Sync Pulse Automation Source –Reference Frequency Selection ....................29
9.2.6. Fan Speed.........................................................................................................30
9.2.7. Menu Password Option......................................................................................31
9.2.8. Ethernet Configuration.......................................................................................32
9.2.9. Factory Setting...................................................................................................33
9.2.10. System Information............................................................................................34
10. Appendix A –Firmware Upgrade Process for MI-WAVE3D.................................35
10.1. Prerequisites for Upgrading Firmware.........................................................................35
10.2. Upgrade Firmware ......................................................................................................35
10.3. Check the STM Virtual COM Port Number..................................................................38
11. Appendix B –MI-WAVE3D Automation................................................................39
11.1. Ethernet Automation ...................................................................................................41
11.1.1. Doremi Server....................................................................................................41
11.1.2. Qube Server ......................................................................................................46
11.1.3. GDC Server.......................................................................................................49
12. Appendix C –Installation Record.........................................................................55
13. Appendix D –Dimensional Drawings...................................................................56

Installation & Operation Manual | MI-WAVE3D
© MASTERIMAGE 3D, Inc.
6
1. Introduction
1.1. Welcome
Congratulations on choosing the finest digital projection 3D system available.
The MASTERIMAGE MI-WAVE3D delivers the clearest full-color images in a cost-
effective and studio-approved single projection, liquid crystal, digital 3D system.
Paired with MASTERIMAGE high quality 3D eyewear, the MI-WAVE3D provides the
clearest and truest color 3D picture of any available liquid crystal 3D system.
This user manual provides all the information required for simple installations and
the operation of the MI-WAVE3D, with any DLP cinema projector and digital cinema
server.
1.2. Contacting Technical Support
If you require technical support, our contact information is listed below:
MASTERIMAGE 3D, INC
Email: support@masterimage3d.com
Web Site: www.MasterImage3d.com
USA Tel: +1-323-606-7800
UK Tel: +44 1753 785131
Asia Tel: +82-2-3438-1600

Installation & Operation Manual | MI-WAVE3D
© MASTERIMAGE 3D, Inc.
7
2. Warnings and Cautions
2.1. Installation Consideration
When planning installation of the MI-WAVE3D, ensure that the largest image
possible is projected onto the liquid crystal polarization modulator (LCPM).
The image width should be between 155mm and 165mm and centered on the
LCPM, as shown below.
2.2. Heat Damage
To avoid burning the polarizer film of the LCPM during the installation and setup
procedure, maintain the image size shown below and use lower intensity test
patterns.
2.3. General Electrical Safety
Disconnect the power cord before servicing or opening the control box for any
reason.
2.4. General Handling
Avoid touching the LCPM with bare hands. Handle the assembly by the frame only.
Image Width on LCPM

Installation & Operation Manual | MI-WAVE3D
© MASTERIMAGE 3D, Inc.
8
3. System Overview
3.1. The Next Wave in Digital 3D Projection
Key Features:
MI-WAVE3D Liquid Crystal Polarization Modulator is an easy-to-use, high-quality Digital
3D Cinema System that enables 3D cinema presentation. The system can be quickly
installed in front of the lens of any DLP digital cinema projector.
MI-WAVE3D is constructed from two specific Liquid Crystal (LC) panels that are
accurately bonded to ensure effective polarization of the left and right images from the
projector lens.
MI-WAVE3D provides an accurate synchronization function for both current format
72Hz, 24fps, triple flash and future HFR 3D formats.
MI-WAVE3D is perfectly matched to the high quality polarized 3D eyewear produced by
MASTERIMAGE 3D.
MI-WAVE3D consists of Liquid Crystal Polarization Modulator, Actuator and Control Box,
connection cables, and mounting frame.

Installation & Operation Manual | MI-WAVE3D
© MASTERIMAGE 3D, Inc.
9
4. Installation and Configuration
4.1. Unpacking the MI-WAVE3D
Inspect the MI-WAVE3D packaging box for any external damage. Report any damage to
shipper and to MasterImage 3D.
Top layer inside shipping carton
Bottom layer, mounting frames
Middle layer, LCPM, Actuator, cooling fans and
Control Box
Cables, power adapter, and 3D glasses
Top layer package contains 4 cartons

Installation & Operation Manual | MI-WAVE3D
© MASTERIMAGE 3D, Inc.
10
4.2. Confirm Package Contents of MI-WAVE3D
Liquid Crystal Polarization Modulator (LCPM)
Actuator
Control Box and Rack Mount Accessory
Power Adaptor
Sync Cable
Actuator Cable
Mounting Frames
3D Glasses
Andere Handbücher für MI-WAVE3D
1
Inhaltsverzeichnis
Andere Master Image Projektor Handbücher
Beliebte Projektor Handbücher anderer Marken

Panasonic
Panasonic PTL735NTU - LCD PROJECTOR-NETWORK IB Bedienungsanleitung

NEC
NEC NP600S EDU Bedienungsanleitung

BenQ
BenQ SH753P Bedienungsanleitung

Eiki
Eiki EK-623U series Bedienungsanleitung

Epson
Epson PowerLite Pro Cinema 6020UB Bedienungsanleitung

Epson
Epson PowerLite Home Cinema 705HD Bedienungsanleitung













