Microscan LVS 7510 Bedienungsanleitung

P/N 84-9320003-02 Rev D
LVS
®
7510 Integrated System Installation
and Quick Start Guide for Zebra Printers

LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers
LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers Page 2 of 16
Copyright ©2018
Omron Microscan Systems, Inc.
Tel: +1.425.226.5700 / 800.762.1149
Fax: +1.425.226.8250
All rights reserved. The information contained herein is proprietary and is provided solely for the purpose of allowing customers to
operate and/or service Omron Microscan-manufactured equipment and is not to be released, reproduced, or used for any other
purpose without written permission of Omron Microscan.
Throughout this manual, trademarked names might be used. We state herein that we are using the names to the benefit of the
trademark owner, with no intention of infringement.
GS1 Solution Partner
Disclaimer
The information and specifications described in this manual are subject to change without notice.
Latest Manual Version
For the latest version of this manual, see the Download Center on our web site at:
www.microscan.com.
Technical Support
For technical support, e-mail:
Warranty
For current warranty information, see: www.microscan.com/warranty.
Omron Microscan Systems, Inc.
United States Corporate Headquarters
+1.425.226.5700 / 800.762.1149
United States Northeast Technology Center
+1.603.598.8400 / 800.468.9503
European Headquarters
+31.172.423360
Asia Pacific Headquarters
+65.6846.1214

LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers
LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers Page 3 of 16
Table of Contents
Safety Instructions.........................................................................................................................4
Important Information....................................................................................................................4
Step 1: Inspect System Components...........................................................................................5
Step 2: Connect the Cables...........................................................................................................6
Step 3: Install and Mount the Light Tower...................................................................................9
Step 4: Printer / Media Setup ......................................................................................................15
Step 5: Log On to LVS-7510 Integrated System Software.......................................................15
Appendix A: LVS-7510 Integrated System Preventive Maintenance......................................16

LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers
LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers Page 4 of 16
Safety Instructions
This unit has been carefully designed to provide years of safe, reliable performance. However, as with all
electrical equipment, there are some basic precautions that you should follow to avoid personal injury or damage
to the system:
Before using the system, carefully read all the installation and operating instructions.
Observe all warning instruction labels on the system.
To protect your system from overheating, make sure no openings on the system are blocked.
Never insert anything into the openings of the system.
Do not use the system near water or spill liquid into it.
Any equipment using electrical voltages may cause personal injury if improperly handled.
Do not attempt to work on the system with the main power lines connected.
Ensure that the AC power source matches the ratings listed for the system. If unsure, check with your
dealer or local utility provider.
Do not place the AC power cord where it can be stepped on. If the AC power cord becomes damaged or
frayed, replace it immediately.
Avoid looking directly into any system lights. If you need to examine the lights, or look at any component
near the lights, be sure to first turn off the lights. If the lights cannot be turned off, then wear polarized
sunglasses while examining the lights.
To avoid damaging the system, turn off and unplug the system before cleaning.
If the system ever needs repair, consult Omron Microscan or your Omron Microscan Distributor.
Important Information
Due to continual product improvements, the product you receive may differ from the content outlined in this
guide. If you have questions about your product that are not covered in this guide, please contact your
Omron Microscan representative or Omron Microscan headquarters at +1-800-762-1149 or
The LVS-7510 Integrated System arrives to your site packaged in specially designed shipping cartons. Do
not discard the shipping cartons in case you must ship or store the system for any reason. Failure to use
these cartons when returning your product to Omron Microscan will void warranty.
The LVS-7510 Integrated System supports Windows 7 Professional and Windows 10.

LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers
LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers Page 5 of 16
Step 1: Inspect System Components
Open the shipping boxes containing the LVS-7510 Integrated System and carefully remove the contents. Verify
the items listed below are included with your system and that each item is clean and in proper condition. Contact
your Omron Microscan representative if any items are missing or damaged in transit.
Calibrated Conformance Standard Test Card (NIST Traceable)
USB cable for LVS-7510 Integrated System readhead (2.0 certified, 6 feet/1.8 m)
Power supply (5-volts)
AC Line Cord
Light Tower Interface Unit Package. Contents include:
oLight Tower Interface Unit
oUSB Cable
oPower Supply (24-volts)
LVS-7510 installation flash drive (includes LVS-7510 Integrated System software and “LVS-7510 Integrated
System Operations Manual”)
“LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers” (this document)
WARNING: The LVS-7510 Integrated System is packaged with two power supplies with different
voltages (5-volt and 24-volt). The 5-volt power supply connects to the LVS-7510 readhead and the
24-volt power supply connects to the light tower. Take special care when plugging in each power
supply as using the wrong power supply results in system failure.
The customer is responsible for providing the following:
Thermal labels
Light tower mounting solution
After system inspection is complete, continue to Step 2: Connect the Cables.

LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers
LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers Page 6 of 16
Step 2: Connect the Cables
Items Needed:
Computer
Zebra printer
Power supply
AC Line Cord
USB cable
Instructions:
1. Connect the power supply cable to the back of the printer.
WARNING: Do not use the 24-volt power supply that is included in the light tower package. Using
the wrong power supply will result in system failure.

LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers
LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers Page 7 of 16
2. Connect one end of the AC power cord to the power supply box.
3. Connect the other end of the AC power cord to a power outlet (110-120 AC).
4. Plug one end of the readhead USB cable to the back of the printer and the other end to the computer’s USB
port. Cables are color coded in orange.
5. If connecting to the read head for the first time, launch LVS-7510 software and the below popup message
appears. Click “Yes” and continue with the Java runtime environment and Atmel flip controller installation.
WARNING: The two USB cables provided with the system are NOT interchangeable. Make sure to
use the correct cable by observing the label on the cable.
6. Plug one end of the printer USB cable to the back of the printer and the other end to the computer’s USB
port.

LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers
LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers Page 8 of 16
7. The 15-pin DB connector (connector shown below) is attached to the light tower. Connect the other end of
the connector to the printer. For the Peel and Present option, connect the other 9-pin DB connector cable
from the light tower to the mating DB connector on the back of the printer, as shown here.
8. The printer and computer cables are connected. Proceed to the next section.
Peel and Present
option only.

LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers
LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers Page 9 of 16
Step 3: Install and Mount the Light Tower
The steps below explain how to connect and mount the light tower interface unit using two screws (8-32 or M4
size – customer-supplied). You may follow the steps below using the customer-supplied screws, or choose a
different mounting solution such as using velcro or magnets to affix the light tower to the desired location.
Items Needed:
Light Tower Interface Unit (LTIU) package (contents listed in Step 1 below)
Mounting solution (if following the mounting steps listed below, you will need two customer-supplied screws
in 8-32 or M4 size)
Instructions:
1. Open the LTIU package and verify the contents listed below are included in the package.
Light Tower Interface Unit
USB Cable
Power Supply (24-volt)
AC Line Cord
2. Mount the light tower to the desired location by inserting a 8-32 or M4 screw (customer-supplied) into each
flange located on the left and right side of the light tower.
3. Plug the 24-volt power supply cable (color coded in red) into the light tower connector.
WARNING: Do not use the 5-volt power supply. Using the wrong power supply will result in system
failure.

LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers
LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers Page 10 of 16
4. Plug one end of the USB cable into the light tower USB connector and the other end into the computer’s
USB port. Cables are color-coded in blue.
5. Light tower installation is complete. Proceed to the next section.
Inhaltsverzeichnis

















