General safety regulations
Safety regulations
4 Installation & Commissioning FST-2XT
Danger of falling! Installing engineers and unauthorised persons can fall down the shaft. Risk of serious injury or
death.
› Block the shaft access points.
› Use suitable protection (e.g. safety harnesses, scaffoldings) when working on or in the shaft.
Danger of crushing due to intentional or accidental car movement. Risk of serious injury or death.
› Block the shaft access points.
› Before starting any work, make sure that there are no persons in the shaft or in the vicinity of moving parts of
the drive.
› Prevent unauthorised operation of the controller.
Risk of material damage
The following shall always apply during all work on the installation:
Electrostatic charging
› Keep the electronic assembly in its original packaging until installation.
› Before opening the original packaging, a static discharge must be performed. To do this, touch a grounded
piece of metal.
› During work on electronic assemblies, periodically perform this discharge procedure.
Electronic assemblies are destroyed by defective, interchanged or incorrectly mounted connectors, short-circui-
ting or excess voltage.
› Check plugs for mechanical damage.
› Never change pre-assembled connectors or cables.
› Only connect loose or torn off wires according to circuit diagram details if this is possible on site (suitable mate-
rial and tools must be available).
› Pay attention to coding pins and latch lugs.
2.3 Safety regulations
General
› The instructions of the lift manufacturer and the instructions in this manual must be followed during installation
and commissioning of the lift system.
› The shaft must be secured against unauthorised trespassing during installation and commissioning.
› Assemblies, devices and cables must be installed and fastened securely and permanently.
› Loads must be moved with suitable aids (lift trucks, hoisting gear etc.).
› Sharp and pointed tools or other potentially dangerous objects may only be carried along in clothing if suitable
protective measures have been taken to rule out any danger.
› Alcohol and drugs must not be consumed before and during installation and commissioning.
Documentation
› A copy of the installation and commissioning manual must be available to the installing engineer at the time of
installing and commissioning the FST-2XT controller and its components.
› A copy of the installation and commissioning manual and the wiring diagrams must be kept in the control cabi-
net at all times after installation.
› The wiring diagrams supplied with the FST-2XT controller are binding. Changes must only be made after con-
sulting NEW LIFT and must be documented in writing on the system.
› The factory test logs of the FST-2XT controller remain with NEW LIFT.
Electricity
› Regulations for installing and operating electrical equipment (VDE 0100) and regulations of local utilities must
be followed.
› The specied distances between different electrical assemblies must be controlled and maintained.
› All installation work must be carried out with the system shut down and off circuit.
› All cables and wires must be installed with sufcient strain relief.
› The neutral and ground wires must be routed separately.
› The control cabinet must be supplied with a clockwise rotary eld.