Nibe AMB 30 Benutzerhandbuch

Installer manual
LEK
AMB 30
Accessories, F1345
IHB GB 1341-1
231417


Table of Contents
1 Important information 2
Safety information 2
2 Delivery and handling 5
Transport and storage 5
Assembly 5
Supplied components 9
Removing the covers 9
3 The air collector module's
design 10
4 Pipe connections 12
General 12
Dimensions and pipe connections 14
Brine side 14
Docking alternatives 16
5 Electrical connections 20
General 20
Connections 21
Optional connections 23
6 Commissioning and adjusting 26
Preparations 26
Filling and venting the brine system 26
Start-up and inspection, Outdoor air opera-
tion 26
Start-up and inspection, Hybrid operation 26
Readjusting, collector side 26
Adjustment, charge flow 26
7 Control - Introduction 27
The control unit 27
8 Control - Menus 28
Service 28
9 Service 34
Service actions 34
10 Disturbances in comfort 36
Alarm management 36
Troubleshooting 38
11 Accessories 39
12 Technical data 40
Dimensions and setting-out coordinates 40
Sound pressure levels 41
Technical specifications 42
Electrical circuit diagram 45
Item register 48
1Table of Contents |AMB 30

Safety information
This manual describes installation and service proced-
ures for implementation by specialists.
This appliance can be used by children
aged from 8 years and above and per-
sons with reduced physical, sensory or
mental capabilities or lack of experience
and knowledge if they have been given
supervision or instruction concerning
use of the appliance in a safe way and
understand the hazards involved. Chil-
dren shall not play with the appliance.
Cleaning and user maintenance shall
not be made by children without super-
vision.
Rights to make any design or technical
modifications are reserved.
©NIBE 2013.
Symbols
NOTE
This symbol indicates danger to machine or
person.
Caution
This symbol indicates important information
about what you should observe when main-
taining your installation.
TIP
This symbol indicates tips on how to facilitate
using the product.
Marking
The CE marking means that NIBE ensures that the
product meets all regulations that are placed on it
based on relevant EU directives. The CE mark is obligat-
ory for most products sold in the EU, regardless where
they are made.
Serial number
The serial number can be found on the product's foot.
LEK
6HULDO QXPEHU
Caution
Always give the product's serial number (14
digits) when reporting a fault.
Country specific information
Installer manual
This installer manual must be left with the customer.
AMB 30Chapter 1 | Important information2
1 Important information

Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The inspection must
be carried out by a suitably qualified person. Fill in the page for information about installation data in the User
manual.
DateSignatureNotesDescription
✔
Brine
System flushed
System vented
Shut off valves
Electricity
Fuses air collector module
Fuses property
Ambient sensor
Control unit
Safety breaker
Earth circuit-breaker
Miscellaneous
Docked to
3Chapter 1 | Important informationAMB 30

Contact information
KNV Energietechnik GmbH, Gahberggasse 11, 4861 SchörflingAT
Tel: +43 (0)7662 8963-0 Fax: +43 (0)7662 8963-44 E-mail: mail@knv.at www.knv.at
NIBE Wärmetechnik AG, Winterthurerstrasse 710, CH-8247 FlurlingenCH
Druzstevni zavody Drazice s.r.o, Drazice 69, CZ - 294 71 Benatky nad JizerouCZ
NIBE Systemtechnik GmbH, Am Reiherpfahl 3, 29223 CelleDE
Vølund Varmeteknik A/S, Member of the Nibe Group, Brogårdsvej 7, 6920 VidebækDK
NIBE Energy Systems OY, Juurakkotie 3, 01510 VantaaFI
AIT France, 10 rue des Moines, 67000 HaguenauFR
NIBE Energy Systems Ltd, 3C Broom Business Park, Bridge Way, Chesterfield S41 9QGGB
NIBE Energietechniek B.V., Postbus 2, NL-4797 ZG WILLEMSTAD (NB)NL
ABK AS, Brobekkveien 80, 0582 Oslo, Postadresse: Postboks 64 Vollebekk, 0516 OsloNO
NIBE-BIAWAR Sp. z o. o. Aleja Jana Pawła II 57, 15-703 BIAŁYSTOKPL
Tel: 085 662 84 90 Fax: 085 662 84 14 E-mail: sekretariat@biawar.com.pl www.biawar.com.pl
© "EVAN" 17, per. Boynovskiy, Nizhny NovgorodRU
NIBE AB Sweden, Box 14, Hannabadsvägen 5, SE-285 21 MarkarydSE
For countries not mention in this list, please contact Nibe Sweden or check www.nibe.eu for more information.
AMB 30Chapter 1 | Important information4

Transport and storage
AMB 30 must be transported and stored vertically.
Assembly
႑Place AMB 30 outdoors on a solid level base that can
take the weight, preferably a concrete foundation.
If concrete slabs are used they must rest on asphalt
or shingle.
႑The concrete foundation or slabs must be positioned
so that the lower edge of the evaporator is at the
level of the average local snow depth, although a
minimum of 300 mm.
႑AMB 30 should not be positioned next to noise
sensitive walls, for example, next to a bedroom.
႑Also ensure that the placement does not inconveni-
ence the neighbours.
႑AMB 30 must not be placed so that recirculation of
the outdoor air can occur. This causes lower output
and impaired efficiency.
႑Place AMB 30 protected from direct wind.
႑Large amounts of condensation water as well as melt
water from defrosting can be produced. Condensa-
tion water must be led off to a drain or similar (see
page 6).
႑Care must be exercised so that AMB 30 is not
scratched during installation.
LEK
LEK
PLQ PP
Do not place AMB 30 directly on the lawn or other non
solid surface.
If there is a risk of roof slides a protective roof or similar
should be installed over AMB 30, pipes and wiring.
5Chapter 2 | Delivery and handlingAMB 30
2 Delivery and handling

Condensation water trough
The condensation water trough is used to collect and
lead away most of the condensation water from AMB
30.
NOTE
It is important for the air collector module op-
eration that condensation water is led away
and that the drain for the condensation water
run off is not positioned so that it can cause
damage to the house.
NOTE
Pipe with heating cable for draining the con-
densation water trough are not included.
NOTE
The electrical installation and wiring must be
carried out under the supervision of an author-
ised electrician.
Caution
If none of the recommended alternatives is
used good lead off of condensation water
must be assured.
႑The condensation water (up to 100 litres/24 hrs)
collected in the trough should be routed via a pipe
to an appropriate drain, it is recommended that the
shortest outdoor stretch possible is used.
႑The section of the pipe that can be affected by frost
must be heated by the heating cable to prevent
freezing.
႑Route the pipe downward from AMB 30.
႑The outlet of the condensation water pipe must be
at a depth that is frost free or alternatively indoors
(with reservation for local ordinances and regula-
tions).
႑Use a water trap for installations where air circulation
may occur in the condensation water pipe.
႑Insulate the pipe (at least 19 mm of insulation) all
the way outside.
႑The insulation must be tight against the bottom of
the condensation water trough.
LEK
Fix the drainage hose to the connection under AMB
30 (recommended dimension 32 mm) with hose
clamps.
Recommended alternatives
Stone caisson
LEK
Frostfritt
djup
)URVW SURRI
GHSWK
If the house has a cellar the stone caisson must be po-
sitioned so that condensation water does not affect
the house. Otherwise the stone caisson can be posi-
tioned directly under the heat pump.
The outlet of the condensation water pipe must be at
frost free depth.
AMB 30Chapter 2 | Delivery and handling6

Drain indoors
:DWHU VHDO
The condensation water is lead to an indoor drain
(subject to local rules and regulations).
Route the pipe downward from AMB 30.
The condensation water pipe must have a water seal
to prevent air circulation in the pipe.
Gutter drainage
LEK
Frostfritt
djup
)URVW SURRI
GHSWK
:DWHU VHDO
The outlet of the condensation water pipe must be at
frost free depth.
Route the pipe downward from AMB 30.
The condensation water pipe must have a water seal
to prevent air circulation in the pipe.
7Chapter 2 | Delivery and handlingAMB 30

Installation area
The distance between AMB 30 and the house wall must
be at least 400 mm. Clearance in front of AMB 30
should be at least one metre.
400 mm
400 mm
3 m
Fritt utrymme
Fritt utrymme framför
Serviceutrymme
800 mm
Min. avstånd
vid användning
av flera AMB30
)UHH VSDFH
6HUYLFH DUHD
)UHH VSDFH LQ IURQW
0LQ GLVWDQFH ZKHQ XVLQJ VHYHUDO $0%
AMB 30Chapter 2 | Delivery and handling8
Andere Handbücher für AMB 30
1
Inhaltsverzeichnis
Andere Nibe Industrieanlagen Handbücher

Nibe
Nibe ERS 30 Bedienungsanleitung

Nibe
Nibe ERS 10-500 Benutzerhandbuch

Nibe
Nibe HPAC S40 Benutzerhandbuch

Nibe
Nibe ClimateMaster Tranquility 22 Digital TZ... Leitfaden

Nibe
Nibe BSA 10 Benutzerhandbuch

Nibe
Nibe ERS 30-400 Bedienungsanleitung

Nibe
Nibe ERS S10 Benutzerhandbuch

Nibe
Nibe ERS 10-400 Benutzerhandbuch

Nibe
Nibe GV-HR 130 Bedienungsanleitung

Nibe
Nibe HPAC 45 Benutzerhandbuch


















