PAGE 4
OBLICA | STUV 16 INSTALLATION AND USER MANUAL
^
MINIMUM CLEARANCE – INTERNAL
2.1 Clearance from non-combustible surfaces
(eg masonry)
100mm minimum clearance is required from fully
non-combustible surfaces.
100
100
Non Combustible
Non Combustible
Glass (frameless or aluminium frame)
Glass (frameless or aluminium frame)
250mm
250mm
Combustible
Combustible
Combustible
Combustible
600mm
100
100
2.2 Clearance from glass
250mm minimum clearance is required from normal
non-combustible glass.
2.3 Clearance from combustible surfaces
(eg timber joist & concrete)
Clearances may be reduced with the application of
heat shielding to walls in accordance to the
Australian Building Code.
For information on heat shielding please contact our
IMPORTANT:
Frames must also be considered. Timber window
frames must be treated as combustible surfaces
(see 2.3). Aluminium frames can be treated as
non-combustible surfaces (see 2.2).
2. PRE-INSTALLATION (CONTINUED)
100
100
250mm
Non Combustible
Non Combustible
Glass (frameless or aluminium frame)
Glass (frameless or aluminium frame)
250mm
250mm
Combustible
Combustible
Combustible
Combustible
600mm
100
100
250mm
Non Combustible
Non Combustible
Glass (frameless or aluminium frame)
Glass (frameless or aluminium frame)
250mm
250mm
Combustible
Combustible
600mm
100
100
250mm
Non Combustible
Non Combustible
Glass (frameless or aluminium frame)
Glass (frameless or aluminium frame)
250mm
250mm
Combustible
Combustible
Combustible
Combustible
100
100
Configuration 1 – Parallel installation
Configuration 2 – Corner installation