Phuel OPS-4247 Kurzanleitung

IPC-4336 Rev C
Unit 17 Denmore Industrial Estate, Denmore Road, Bridge of Don, Aberdeen AB23 8JW
Illustrated Parts Catalogue
And Technical Documentation
Stuffing Box
100-4336-HV0
Refer to OPS-4247 for Operational Instructions
EXAMPLE

Technical Documentation
Stuffing Box
IPC-4336 Rev C 1
Table of Contents
Revision History ...............................................................................................................................2
1Declaration of Conformity .........................................................................................................3
2Technical Specification .............................................................................................................5
3Parts List and Assembly Drawings ...........................................................................................6
4Spares ....................................................................................................................................12
4.1 Redress Kit ............................................................................................................. 12
4.2 Wire Specific Parts.................................................................................................. 12
4.3 Operation Specific Parts ......................................................................................... 13
4.4 Support Equipment ................................................................................................. 13
Table 1: Technical Data ...................................................................................................................5
Table 2: Parts list 100-4336-HV0.....................................................................................................6
Table 3: 100-4252-HV0 Parts List....................................................................................................6
Table 4: 100-4253-HV4 Parts List..................................................................................................10
Table 5: 100-4250-HV0 Parts List..................................................................................................11
Table 6: Redress Kit Part No RDK-4336-HV0................................................................................12
Table 7: Redress Kit Part No RDK-4252-HV0................................................................................12
Table 8: Wire Kit WKS-4117-092 ...................................................................................................12
Table 9: Wire Kit WKS-4117-108 ...................................................................................................12
Table 10: Wire Kit WKS-4117-125.................................................................................................13
Table 11: Wire Kit WKS-4117-160.................................................................................................13
Table 12: Spacer Selection............................................................................................................13
Table 13: Support Equipment ........................................................................................................13
Figure 1: Dimensional Data..............................................................................................................5
Figure 2: 100-4252-HV0 ..................................................................................................................7
Figure 3: Assembly Procedure.........................................................................................................9
Figure 4: 100-4253-HV4 ................................................................................................................10
Figure 5: 100-4250-HV0 ................................................................................................................11
EXAMPLE

Technical Documentation
Stuffing Box
IPC-4336 Rev C 2
Revision History
Issue, Release Date Description
Rev A, 12 Jun 12 Initial Issue
Rev B, 11 Jul. 12 Item No’s Parts List Update
Rev C, 31 Oct 12 Removed spacer from line kits
EXAMPLE

Technical Documentation
Stuffing Box
IPC-4336 Rev C 3
1 Declaration of Conformity
DECLARATION OF CONFORMITY
Phuel Oil Tools Limited hereby declare that the following equipment
Slickline Stuffing Box
Model 100-2040-HH0
Model 100-3296-HV0
Model 100-3602-HV0
Model 100-4229-HV0
Model 100-4269-HV0
Model 100-4336-HV0
Also described as;
A mechanical device used for guiding Slicklines (Wire-lines) into well bores while containing well bore pressure
(excluded from the Pressure Equipment Directive by virtue of Annex ‘A’ 6 and 9) and is manufactured to achieve the
following specification.
Was found to be in accordance with;
The European Machinery Directive 98/37/EC being implemented in the United Kingdom by the Supply of
Machinery (Safety) Regulations 1992 and as amended by S.I. 1992/3073, S.I 1994/2063 and SI 2005/831
And the;
The European Directive on Equipment and Protective Systems Intended for Use in Potentially Explosive Atmospheres
94/9/EC, being implemented in the United Kingdom by The Equipment and Protective Systems Intended for Use in
Potentially Explosive Atmospheres Regulations 1996 (SI 1996/192) and as amended by The Equipment and
Protective Systems Intended for Use in Potentially Explosive Atmospheres (Amendment) Regulations 2001 (SI 2001
No.3766).
EXAMPLE

Technical Documentation
Stuffing Box
IPC-4336 Rev C 4
DECLARATION OF CONFORMITY
This equipment was designed to meet with the following European Harmonised Standards;
BS EN ISO 12100 Part 1 Safety of Machinery. Basic concepts, general principles for design
BS EN ISO 12100 Part 2 Safety of Machinery. Technical principles
BS EN 13463 Part 1: Non-electrical Equipment Intended for Use in Potentially Explosive Atmospheres - Basic Method
and Requirements.
BS EN 13463 Part 5: Non-electrical equipment intended for use in potentially explosive atmospheres - Protection by
constructional safety c.
BS EN 982 Safety of Machinery – Safety Requirements for Fluid Power Systems and Their Components - Hydraulics
BS EN 1050 Safety of Machinery – Principles for Risk Assessment
This equipment has been classified as suitable for use within a potentially explosive atmosphere as follows.
In addition to compliance with the aforementioned European Standards this equipment meets the requirements of the
following internationally recognised standards;
API 6A
I hereby declare that the equipment described in this document has been designed and manufactured in compliance
with the relevant sections and essential health and safety requirements of the aforementioned Standards, Codes and
Directives / Regulations.
Name Colin McKracken Position Managing Director
Signed: ________________
05 April 2012
EXAMPLE

Technical Documentation
Stuffing Box
IPC-4336 Rev C 5
2 Technical Specification
Part Number 100-4336-HV0
Connection 4 ¾’’
Maximum Working Pressure 10,000 Psi (689 Bar)
Test Pressure 15,000 Psi (1034 Bar)
Weight 110 lbs / 50 Kg
Overall Length (A) 40.0’’
Make Up Length (B) 37.8’’
Table 1: Technical Data
Figure 1: Dimensional Data
EXAMPLE

Technical Documentation
Stuffing Box
IPC-4336 Rev C 6
3 Parts List and Assembly Drawings
Item No
Part Number Description Quantity
1 100-4253-HV4
18" ALU SHEAVE WHEEL + STANDARD HUB 1
2 100-4252-HV0
PISTON PACKING HOUSING ASSEMBLY 1
3 100-4250-HV0
4 3/4"-4 (10K) SEAL SUB AND COLLAR ASSEMBLY
1
Table 2: Parts list 100-4336-HV0
Item No
Part Number Description Quantity
1 100-1974-480 HOUSING 1
4 100-1975-480 PACKING HOUSING 1
5 100-2033-480 TOP CAP 1
6 100-1977-B21 PISTON 1
7 100-1981-316 LOCK RING 1
8 100-1986-316 LOCKNUT 1
10 100-1979-B21 CHECK NUT 1
11 100-1988-B21 BOP RETAINER 1
17 802-1997-H80 ROD T-SEAL (.754 DIA) 1
18 802-1998-H80 PISTON T-SEAL (1.750 DIA) 1
19 802-1999-H80 PISTON T-SEAL (.750 DIA) 1
20 801-0232-V90 O-Ring - B.S Size 232 1
22 801-0113-V90 O-Ring - B.S Size 113 1
24 100-2114-PEK CHECK VALVE SEAL 1
26 100-2212-STL COMP SPRING (C5511230) 1
27 100-2005-STL LEE PLUG PLGA1560020A 1
28 100-2211-316 BALL BEARING 0.250 DIA 1
30 100-5058-### Select correct spacer for desired performance 1
31 100-2209-316 NPT SOCKET HEAD PLUG 1/8 1
32 100-1943-304 SPRING PLUNGER L HANDLE LOCKING 1
42 100-2692-STL OUTER SPRING 1
43 100-2693-STL INNER SPRING (RIGHT HAND) 1
999 WKS-4117-###
REPLACE WITH CORRECT WIRE SPECIFIC KIT
1
Table 3: 100-4252-HV0 Parts List
### refer to spares list for wire specific kits
EXAMPLE

Technical Documentation
Stuffing Box
IPC-4336 Rev C 7
Figure 2: 100-4252-HV0
EXAMPLE

Technical Documentation
Stuffing Box
IPC-4336 Rev C 8
EXAMPLE

Technical Documentation
Stuffing Box
IPC-4336 Rev C 9
Figure 3: Assembly Procedure
EXAMPLE
Inhaltsverzeichnis
Andere Phuel Industrieanlagen Handbücher






















