Contents General information
4
1X DHW (1x Hot water) 21
T-DHW 1-3 (Hot water temperature setting) 21
ANTILEGION
(Hot water short time heating function) 21
Heating circuit I / II 22
MODE 22
T-ROOM DES 1-3 22
T-REDUCED 22
T-ABSENCE 22
T-LIMIT DAY/T-LIMIT N (Day/Night) 23
HEATSLOPE 23
ADAPTION (heat slope adaptation) 24
ROOMS-INFL (Room sensor influence) 24
ADAP ROOM-T (room sensor adaptation) 24
OPTIM HEAT (Heating optimisation) 25
MAX OPT-TIME (maximum bringing forward) 25
ECONO OPTI (Reduction optimisation) 25
PC-ENABLE 25
RETURN 25
Timer Program Area 26
List of available time programs 26
Selecting a timer program 26
Timer/heating program adjustment 27
Expert area 30
Installation 30
CODE-NO 30
BUS ID 1 / 2 (heating circuit number) 30
TIME MASTER 30
MAX T-COLL (max. header temperature) 30
MIN T-COLL (min. header temperature) 30
HYST BOILER
(dyn. switching hysteresis stage 1) 31
with HYST TIME (Hysteresis time) 31
CAP/MODULE (boiler output for each stage) 32
MIN MOD CASC (min. modulation cascade) 32
HW-BOILER
(number of stages for HW operation) 32
CONTROL DEVIAT (header control variance) 33
DES OUTPUT (required system output [in %]) 33
SWITCH VAL (-99 – +99) 33
BLOCK TIME (currently remaining value) 33
RESET TIME (resetting time for I-Controller) 34
SEQUENCE 1) 34
SEQUENCE 2 (heat generator sequence 2) 34
BOILER SEQ (time to sequence change) 34
LOCK TIME (delay time for next stage) 34
Screed program 35
SCREED (activation of screed drying process) 35
Hot water 36
DHW RELIEF(charging pump lock) 36
PARALLEL (Pump parallel running) 36
T-BOILER DHW
(increase during HW operation) 37
HYST DHW (hot water hysteresis) 37
DHW FOLLOWUP (pump run-down time) 37
THERM INPUT (storage tank with thermostat) 37
WALL HUNG (for modulating HS) 37
Heating circuit I / II 38