SEI Insta-Berm Bedienungsanleitung

INSTA-BERM
(Frame)
OPERATIONS
MANUAL
2018 VERSION D

2018 Insta-Berm (Frame) Operations Manual (Version D)
We Engineer Solutions
INSTA-BERM (FRAME) OPERATIONS MANUAL - Version D
Issue Date: September 2018
PLEASE READ BEFORE USING.
SEI INDUSTRIES LTD.
7400 Wilson Avenue
Delta, B.C. Canada
V4G 1H3
Phone: (604) 946-3131
Fax: (604) 940-9566
E-Mail: [email protected]
Website: www.sei-ind.com
COPYRIGHT © 2018 SEI INDUSTRIES LTD. ALL RIGHTS RESERVED
PRINTED IN CANADA

2018 Insta-Berm (Frame) Operations Manual (Version D)
We Engineer Solutions
Table of Contents
Section 1: Introduction 1
Overview of the Insta-Berm (Frame) ............................................................................1
Section 2: Description 2
Description of the Insta-Berm (Frame) System ............................................................2
Fabric Information ...........................................................................................2
Chemically Resistant Insta-Berm System .......................................................3
Fabric Chemical Resistance ...........................................................................4
Standard Equipment .....................................................................................................5
Optional Equipment ......................................................................................................5
RainDrain Description .....................................................................................5
RainDrain Performance ..................................................................................6
RainDrain Installation .....................................................................................7
RainDrain Specifications ................................................................................8
Section 3: Safety 9
Safety Precautions .......................................................................................................9
Handling Chemicals and Fluids ......................................................................9
Handling of Petroleum Fuels ..........................................................................9
Personnel Safety ............................................................................................9
Section 4: Installation 10
Installation Procedures ...............................................................................................10
Selecting a Site .............................................................................................10
Preparing the Site .........................................................................................10
Assembling the Berm ...................................................................................11
High Wind Precautions .................................................................................22
Section 5: Maintenance 23
Maintenance and Repairs ...........................................................................................23
Spill Clean-Up ...............................................................................................23
Removing Water and Foreign Materials .......................................................23
Extending the Service Life of the Insta-Berm System ..................................24
Repairs .......................................................................................................................26
Using Glue ....................................................................................................26
Repairing in High Humidity ...........................................................................27
Applying the Glue .........................................................................................27
Gluing with Patches ......................................................................................29
Cutting the Patch ..........................................................................................30
Applying the Patch ........................................................................................31
Using Other Glues ........................................................................................32

2018 Insta-Berm (Frame) Operations Manual (Version D)
We Engineer Solutions
Section 6: Packing and Storage 33
Repacking, Shipping and Storage ..............................................................................33
Repacking the Insta-Berm System ...............................................................33
Shipping Instructions ....................................................................................36
Storing the Insta-Berm System .....................................................................36
Section 7: Specifications and Parts 37
Specifications .............................................................................................................37
Terra Tank to Frame Insta-Berm Cross Reference Chart ............................39
Repair Kits .................................................................................................................40
Mini Repair Pocket Kit REPKM002 ..............................................................40
Mini Repair Pocket Kit REPKM002NG (no glue) ..........................................40
Parts List .....................................................................................................................41
20" High Berms .............................................................................................41
32" High Berms .............................................................................................42
Section 8: Warranty 43

Section 1: Introduction Overview of the Insta-Berm (Frame) System
2018 Insta-Berm (Frame) Operations Manual (Version D) 1
We Engineer Solutions
Section 1: Introduction
Overview of the Insta-Berm (Frame) System
This manual provides the necessary information and instructions for the installation, operation,
maintenance, shipping and safe use of SEI Industries’ Insta-Berm (Frame) – a portable secondary
containment berm liner system. Additional copies of this manual are available from SEI Industries Ltd.
A fully collapsible berm, the Insta-Berm (Frame) is easy to use and meets
EPA regulation 40CFR112.7. It comes in two fabric choices; Chem-
Shield and Arctic-Shield fabric, which is fully certified by Intertek to meet
the CAN/ULC-S668-12 Class IP and Class IIP standard and is suitable for
secondary containment of flammable liquids and combustible liquids in
both above ground (exposed) and (buried) non-exposed secondary
containment applications.
This standard is listed in the Storage Tank Systems for Petroleum Products
and Allied Petroleum Products Regulations (SOR/2008-197), under the Canadian Environmental Protection
Act, 1999.

Section 2: Description Description of the Insta-Berm (Frame) System
2018 Insta-Berm (Frame) Operations Manual (Version D) 2
We Engineer Solutions
Section 2: Description
Description of the Insta-Berm (Frame) System
The frame-supported Insta-Berm system is a portable secondary containment berm liner, intended to prevent
the spill of liquids and hazardous materials. The liner is constructed of polymer-coated nylon or polyester
fabric. Some models may be constructed of urethane-coated nylon. This type of berm system is used for
larger applications that require superior environmental protection.
The prefabricated support frame is constructed of corrosion resistant aluminium pipe and galvanized
malleable iron fittings.
There are two Insta-Berm frame models available (20" high and 32" high frames). The 32" model has a
second set of rails to support the bottom of the liner.
Fabric Information
There are two types of fabric available with the frame-supported Insta-Berm systems:
• 30oz Chem-Shield fabric
• Arctic-Shield fabric is certified to ETL W/N 1746, chemical and fire-resistant fabric for
temperatures to -50 degrees Fahrenheit / -46 degrees Celsius (Arctic-Shield fabric is not
suitable for acids)
20" high frame shown. 32" high frame shown.

Section 2: Description Description of the Insta-Berm (Frame) System
2018 Insta-Berm (Frame) Operations Manual (Version D) 3
We Engineer Solutions
Chem-Shield (30 oz., black/black color)
Chem-Shield liners are constructed with interpolymer alloy coating that combines excellent durability with
resistance to many chemicals. This fabric is suitable for containment of oily water, sludge, transformer
mineral oil, sulphuric acid, PCB transformer oils, 30% chlorine, ammonium hydroxide, ethanol and
fertilizer. This liner is designed to contain most chemicals suitable to -20 F. Call SEI to confirm usage of a
specific chemical. Using optional corrosion proof fittings, phosphoric acid (10%) and sodium hydroxide
(60%) is also permissible. An alternative glue for repairs would be Loctite 495, which should be available
locally.
Arctic-Shield (tan/green color, used in Arctic berms)
Arctic-Shield liners are constructed from urethane-coated nylon that meets U.S. military specification MIL-
T-52983G for fuel tanks. The following fluids are acceptable for containment: Jet A, Jet B, JP-1, JP-4, JP-
8, kerosene, avgas, diesel fuels with less than 40% aromatic content and isopropyl alcohol suitable to -50 F.
Arctic-Shield fabric is not suitable for use with gasoline (contact SEI for information on the Desert King).
Arctic-Shield fabric meets U.S. military specification MI-T-52983G and ATPD-2266. An alternative glue
for repairs would be 3M(DP420), which should be available locally.
Arctic-Shield fabric will provide longer service life due to a higher resistance to abrasion. It can also be
used in warmer climates.
Chemically Resistant Insta-Berm System
Chemically resistant Insta-Berm systems are made from polymer coated polyester or nylon fabric. This
fabric combines excellent durability with resistance to many chemicals.
The data shown in the chart on the following page is the result of laboratory tests and is intended to serve
only as a guide. No performance warranty is intended or implied. The degree of chemical attack on any
material is governed by the length of time, temperature and size of the area exposed.
When considering chemically resistant Insta-Berm system for specific applications, a fabric sample should
be tested in as close to actual service conditions as possible.
Important Note
Please contact an SEI representative for information on which fluids are acceptable for
containment in a chemical resistant Insta-Berm system. The user is responsible for ensuring the
berm is suitable for each application.

Section 2: Description Description of the Insta-Berm (Frame) System
2018 Insta-Berm (Frame) Operations Manual (Version D) 4
We Engineer Solutions
Fabric Chemical Resistance

Section 2: Description Standard Equipment
2018 Insta-Berm (Frame) Operations Manual (Version D) 5
We Engineer Solutions
Standard Equipment
The frame-supported Insta-Berm system comes complete with a berm liner, prefabricated support frame
(20" or 32" high), pre-installed stake down tabs and bulkhead fittings for the optional RainDrain system. A
crate for shipping and a repair pouch are also included. All repair instructions are found in this manual.
Optional Equipment
Also available from SEI Industries:
• RainDrain system
• High wind stakes (available only on Arctic-Shield berms)
• Groundsheet to protect the bottom of the Insta-Berm
• Track belting to protect the inside of the Insta-Berm from tires
• Carrying bag
RainDrain Description
The RainDrain system allows operators to continuously gravity-drain rain water from secondary
containment berms without having to monitor the discharge. The RainDrain is designed as a go-no-go
filtration system that will automatically stop the flow of discharge water when it is full or when there is a
large amount of hydrocarbons present in the water being discharged.
18" Filter Assembly 36" Filter Assembly

Section 2: Description Optional Equipment
2018 Insta-Berm (Frame) Operations Manual (Version D) 6
We Engineer Solutions
RainDrain Performance
The RainDrain system allows rainfall and water from other sources to be discharged from the berm. The
filtration unit stops all target contaminates, acting as a hydrocarbon selection unit and reducing the
discharged water below 10 ppm hydrocarbon content.
When the filtration unit reaches containment capacity, it will automatically cease to discharge all fluids.
When this occurs the filter cartridge will have to be replaced. Once that is completed, the system is ready
for normal operation.
Important Note
The amount of hydrocarbons present in the secondary containment system will determine the
frequency in which to replace the filter cartridge.
Warning
In the event of a catastrophic failure of a primary containment tank (that is secured within a
secondary containment berm and protected by the RainDrain), the subsequent spill of a significant
amount of fuel will cause the filter to shut down automatically. It is still possible that a small
amount of fuel will escape through the RainDrain because of the higher fuel to water discharge
ratio. This discharge can be trapped in a small discharge pit filled with hydrocarbon absorbent
pads.
Inhaltsverzeichnis

















