CEDES APS Landing System
Page iv © 2021 Smartrise Engineering, Inc. All Rights Reserved June 24, 2021
List of Figures
Figure 1: Coded Tape.....................................................................................................................................................1
Figure 2: Gloves Required..............................................................................................................................................1
Figure 3: Tape Minimum Bend Radius...........................................................................................................................2
Figure 4: Routing Tape...................................................................................................................................................2
Figure 5: Unistrut Installation........................................................................................................................................3
Figure 6: Sensor Array Assembly Positioning ................................................................................................................4
Figure 7: Location of Tape Mount Assemblies...............................................................................................................5
Figure 8: Upper Tape Unistrut Installation ....................................................................................................................6
Figure 9: Hardware ........................................................................................................................................................6
Figure 10: Gap Verification ............................................................................................................................................7
Figure 11: Tape Clip Assembly .......................................................................................................................................7
Figure 12: Tape Clip Insertion........................................................................................................................................8
Figure 13: Tape Clip Assembly Alignment .....................................................................................................................8
Figure 14: Optical Axis ...................................................................................................................................................9
Figure 15: Tape Clip Assembly Placement (Rear View) .................................................................................................9
Figure 16: Tape Clip Assembly Alignment ...................................................................................................................10
Figure 17: Lower Tape Mount Assembly .....................................................................................................................11
Figure 18: Hardware to Lower Tape Mount Assembly................................................................................................11
Figure 19: Sensor Array Assembly ...............................................................................................................................12
Figure 20: Sensor Array Assembly Connected to C-Channel (Right Side)....................................................................13
Figure 21: Sensor Array Assembly Connected to C-Channel (Left Side) ......................................................................13
Figure 22: Sensor Array Assembly (Right Side)............................................................................................................14
Figure 23: Sensor Array Assembly (Left Side) ..............................................................................................................15
Figure 24: Dual Sensor Array Assembly.......................................................................................................................15
Figure 25: Dual Sensor Array Assembly (Right Side)....................................................................................................16
Figure 26: Dual Sensor Array Assembly (Left Side)......................................................................................................17
Figure 27: Emergency Tape Break Switch in Series with Buffer Switch.......................................................................17
Figure 28: Unistrut to Lower Tape Mount Assembly...................................................................................................18
Figure 29: Emergency Tape Break Switch....................................................................................................................18
Figure 30: Sensor Array Assembly Adjustment ...........................................................................................................19
Figure 31: CAT5 Camera to CIB Board .........................................................................................................................19
Figure 32: Optical Sensor LEDs ....................................................................................................................................20
Figure 33: Alignment Arrows.......................................................................................................................................20
Figure 34: Stopping Points...........................................................................................................................................21