The assembly of the SolBox happens at the
three xing points at the back.
Prior to the beginning of the assemly it
is necessary to inspect the sustainability
of the building ground by the customer.
Subsequently, dimensions and style of
the xtures have to be adjusted and to be
provided by the customer.
After placing of the xtures, the SolBox has
to be hooked in the xing points and needs to
be secured.
Now install further pipelines in the solar
systems. Pay attention to the accurate
connection of the pipelines upon the collectors
- see illustration 6.
Connect the pipelines comming from the
collectors with the designated connections
(1) and (2) at the SolBox - see illustration 1.
Please pay attention that the pipelines have
to be installed with downgrade from the
collectors towards the SolBox.
notice total weight of 65 kg
Illustration 8
Connect the SolBox with the heat
exchanger in the storage tank. For this
purpose use the connections (6) and (10).
Please pay attention that the pipelines
have to be installed with downgrade from
the SolBox to the heat exchanger in the
storage tank.
Apply the prewired sensor at designated
place at the storage tank and secure it -
see illustration 2.
Install further sensors and wire these
with the solar controller - see assembly
instruction solar controller.
Plug in the power plug of the solar
controller - see illustration 2.
Assembly of the SolBox