Taylor TAYLOR-GTW-2A Bedienungsanleitung

2022-012-R-0017-A2_Draft 4 1
O T I M U S
S O R T E R S
Gateway
Installation manual
Taylor Technologies BV
Torenallee 32-14
5617 DB Eindhoven
The Netherlands
tel: +31 (0)85 107 1871
mail: support@taylor.solar
web: www.taylor.solar

2022-012-R-0017-A2_Draft 4 2
O T I M U S
S O R T E R S
Gateway
Table of contents
1 About this document...................................................................................2
1.1
Purpose of this document
................................................................................2
1.2 How to use this document................................................................................2
1.3
Language
...........................................................................................................2
1.4
Symbols and signal
words used in this document........................................2
2 Safety............................................................................................................3
2.1 General................................................................................................................3
2.2 Connect to the inverter......................................................................................3
3 Packaging.....................................................................................................4
4 Description...................................................................................................5
4.1 Overview of the system.....................................................................................5
4.2
Overview of the gateway
..................................................................................5
4.3 Data cables delivered seperate from gateway...............................................5
4.4
Status shown by the indicator
light in the power switch...............................6
4.5
Status shown by indicator lights 1 and 2
......................................................6
5 Installation....................................................................................................7
5.1 Preliminary equirements...................................................................................7
5.2
Install the gateway
............................................................................................8
6 Declaration of conformity..........................................................................11
7 Technical
specication..............................................................................11
7.1
Gateway
............................................................................................................14
7. 2
Smart module
...................................................................................................14
8Drill template...............................................................................................16
11

2022-012-R-0017-A2_Draft 4 3
O T I M U S
S O R T E R S
Gateway
1.1 Purpose of this document
This document is only applicable for the gateway. Refer to the technical
specications for the applicable part numbers.
From here on, this document refers to the gateway as the equipment.
The equipment is part of a solar power system, from here on in this
document referred to as the system.
The document is for approved personnel and gives the information that is
necessary to install the equipment.
1.2 How to use this document
1. Make sure that you know the structure and contents of this document.
2. Read the safety chapter and make sure that you know all the instructions.
3. Do the steps in the procedures fully and in the correct sequence.
4. Keep the document in a safe location that you can easily access.
This document is a part of the equipment.
1.3 Language
The original instructions of this document are in English (EN-US). All other
language versions are translations of the original instructions.
1.4 Symbols and signal words used in this document
Symbol Signal word Description
Warning Obey the instruction.
If not, this can cause injury.
Caution Obey the instruction.
If not, this can cause damage to the machine,
to equipment or to property.
Note A note gives more data, to make it easier to do the
steps, for example.
- Read the instructions.
1 About this document
2

2022-012-R-0017-A2_Draft 4 4
O T I M U S
S O R T E R S
Gateway
2.1 General
WARNING:
- Before you switch the inverter on or o, stop the gateway. Set the power
switch of the gateway in the o position (0).
- Incorrect installation can cause electric shock or can cause damage to
the equipment and property. Obey the local regulations and electrical
standards.The system must be installed and maintained by trained and
authorized personnel.
- The gateway is designed to apply within the Taylor system, do not use it for
any other purposes.
- Use the equipment only in combination with inverters that are approved by
Taylor.
- Before you install the equipment, read all instructions.
- When the photovoltaic array is exposed to light, it supplies a DC voltage.
- Read the documentation and safety instructions of the inverter.
- Do not disconnect the junction box under load.
- Do not install the equipment in areas that contain ammable materials or
gases.
- Install the equipment in a dry location.
- If the power cable has damage, switch o the gateway and remove the
power source before you touch the power cable.
- If the equipment has damage, disconnect the power cable. Replace the
equipment.
- Do not open the equipment.
- Do not make changes to the equipment.
- Recycle the equipment as electronic waste. Do not put the equipment in
unsorted municipal waste. Obey the local regulations.
2.2 Connect to the inverter
2 Safety
Caution:
- On the inverter, do not
connect more than one string
of solar panels to an MPPT
connection.
- Refer to the documentation
of the inverter.
3

2022-012-R-0017-A2_Draft 4 5
O T I M U S
S O R T E R S
Gateway
A B C
E D
3 Packaging
A. Gateway
B. Installation manual
C. Power cable
D. Fastening materials
E Drill template
4

2022-012-R-0017-A2_Draft 4 6
O T I M U S
S O R T E R S
Gateway
4.1 Overview of the system
A. Gateway
B. Solar panel
C. String of solar panels
D. Inverter
4.2 Overview of the gateway
A. Inverter data connection
B. Power connection
C. Power adapter
D. LAN connection
E. Indicator light 1
F. Indicator light 2
G. PV cable feed-through hole
H. Cable clamp
I. Power switch with indicator light
J. Identication plate
K. Datacable
L. Cap
H
C
IJ G
BFE A
KD
L
2
4.3 Data cables delivered seperate from gateway
Data cable Part number (P/N) To use with this inverter
A. TAYLOR-GTW-C-00 Goodwe
B. TAYLOR-GTW-C-SL Solis
4 Description
A
B
D
C
5

2022-012-R-0017-A2_Draft 4 7
O T I M U S
S O R T E R S
Gateway
4.4 Status shown by the indicator light in the power switch
Indicator light in the
power switch
Status of
the gateway
Remarks
On On The system produces energy. The cable
from the solar string is energized.
O O When the gateway is o, the system is
in safety mode. The cable from the solar
string has approximately 1 Volt per
solar panel.
Warning: To make sure that the
system is in safety mode, disconnect
the power adapter of the gateway.
4.5 Status shown by indicator lights 1 and 2
Indicator light 1 Indicator light 2 Equipment status
Flashes 7 times O There is a connection with the 4G network.
On O The gateway updates the software
Flashes O The gateway does a factory reset.
6

2022-012-R-0017-A2_Draft 4 8
O T I M U S
S O R T E R S
Gateway
2. The solar panels (A) are installed and
the smart modules (B) are connected.
3. The inverter is installed.
Warning:
- Obey the instructions that come with the
solarpannels, the smart modules and the
inverter.
- When the photovoltaic array is exposed
to light, it supplies a DC voltage.
- + - +
BA
2
5 Installation
2
Design rules
- Multiple orientations within one string are allowed
- Each orientation should reach the start-up voltage (input DC)
7
5.1 Preliminary requirements
1. Scan the barcode of each individual
solar panel. In the onboarding
application on your mobile device, On
the 'Scan' screen (A), select the 'Scan'
button (B).
4 3
2 1
9 10
XXXXXXXXX
B
A
1

2022-012-R-0017-A2_Draft 4 9
O T I M U S
S O R T E R S
Gateway
Warning:
- Obey the safety instructions of the
inverter.
- Make sure that the inverter is o and de-
energized.
- Do not connect more than one string of
solar panels to a MPPT connection.
- Do not connect parallel module strings
per MPPT tracker
1. Scan the gateway. Select the 'SCAN
GTW' button (A).
A
11 10 9
8 7
6 5 4
3 2 1
4
Note: If necessary, drill holes. Drill
safely. Do not drill or screw in electricity
lines, water pipes, and such items. Use
the correct type of wall plugs.
2. Install the fasteners. Use the drill
template on the last page of this
manual.
3. Attach the gateway to the fasteners (B).
B
5
5.2
Install the gateway
.
3
8

2022-012-R-0017-A2_Draft 4 10
O T I M U S
S O R T E R S
Gateway
Caution: Never put both cables
through the hole (B).
4. Put one of the cables (A) (either + or -)
through the hole (B).
5. Put the other cable through the clamp
(C)
6. Connect the cables to the inverter
(D). Refer to the documentation of the
inverter
D
4
7. Connect the data cable to the inverter
(B). Refer to the website:
www.taylor.solar > Downloads >
Manuals.
8. Connect the data cable to the data
connection (A).
B
A
5
AB
C
3
9
Inhaltsverzeichnis
Beliebte Tor Handbücher anderer Marken

LST
LST M500RFE-AS Bedienungsanleitung

Kinnex
Kinnex Media Gateway Bedienungsanleitung

2N Telekomunikace
2N Telekomunikace 2N StarGate Bedienungsanleitung

Mitsubishi Heavy Industries
Mitsubishi Heavy Industries Superlink SC-WBGW256 Bedienungsanleitung

ZyXEL Communications
ZyXEL Communications ZYWALL2 ET 2WE Bedienungsanleitung

Telsey
Telsey CPVA 500 - SIP Bedienungsanleitung











