
VOT 2; Rev 1.2; EN; 09.07.2013
TKT67C –Installation and maintenance
Table of contents
Table of contents................................................................................................................ 2
1. Safety instructions ......................................................................................................... 4
2. Package contents and storing....................................................................................... 4
2.1 Contents of package.............................................................................................................4
2.2 Storing...................................................................................................................................4
3. Product description........................................................................................................ 5
3.1 Manufacturer.........................................................................................................................5
3.2 Terminology ..........................................................................................................................5
3.3 Type .......................................................................................................................................5
3.4 Explanation of letters (in previous models)........................................................................5
3.5 List of optional features........................................................................................................6
3.6 General description ..............................................................................................................6
3.7 Technical specifications.......................................................................................................7
3.8 Directives and standards......................................................................................................9
4. Description of operations ............................................................................................ 10
4.1 Purpose of the central battery unit....................................................................................10
4.2 Circuit outputs ....................................................................................................................10
4.3 Circuit board settings.........................................................................................................10
4.4 Parallel connection of output circuits ...............................................................................10
4.5 Control unit..........................................................................................................................11
4.5.1 Individual luminaire monitoring test with basic settings................................................................... 11
4.5.2 Circuit monitoring luminaire test with basic settings........................................................................ 11
4.6 Operation of the central battery unit..................................................................................12
4.7 Normal Status......................................................................................................................12
4.8 Central module panel..........................................................................................................13
4.9 Control Module panel luminaire monitoring LED’s and menu settings ..........................15
4.10 Control Module panel test functions and alarms............................................................21
4.11 Buttons..............................................................................................................................23
5. System planning and installation................................................................................ 24
5.1 System planning .................................................................................................................24
5.1.1 Luminaire-specific addressable monitoring ..................................................................................... 24
5.1.2 Circuit monitoring............................................................................................................................. 24
5.2 System installation .............................................................................................................24
5.2.1 Parts layout...................................................................................................................................... 26
5.2.2 Circuit wiring in parallel connection ................................................................................................. 27
5.2.3 DIP switch settings in circuit boards ................................................................................................ 28
5.3 Commissioning...................................................................................................................29
5.3.1 Setting of battery type and capacity................................................................................................. 29
5.3.2 Forced charging of the batteries...................................................................................................... 30
5.3.3 Checking the luminaire circuits one at a time.................................................................................. 30
5.3.4 Configuration.................................................................................................................................... 30