1. TECHNICAL DATA
1.1GENERALTECHNICAL
CHARACTERISTICS
CTC Maxicast-ironboilersarehigh
efficiency(superiorto 90%)generators
of hot water up to 90°C for central
heating. Thehighefficiencyofthistype
of system also achieves extremely
LOWNOxemissiontotheatmosphere.
WhenLOW-NOxburnersareinstalled
this boiler meets the most restrictive
Europeanairpollution Standards.
Theboilerbody(madeofmodularcast-
iron wet-chamber components)
functions in depression for the entire
rangeofadmissiblepower ratings.
Theboilerbodyiscomposedof:
a. Frontcomponentwithinspection
hatchwaysandsupportforthe
blown-airburner.
b. Intermediateelementswith
shapesdesignedfor high thermal
exchangeeven when operatingat
LOWtemperatures.
Thenumberof elements can vary
dependingonthe thermal
capacity of the boiler.
c. End element that connects to the
deliveryand return pipelinesand
to the smoke exhaust system.
4
All elements are connected together
by twin-taper connection nipples.
Structural rigidity is achieved by tie-
rods,which alsofunctiontocarryload-
bearing parts of the shell. Boiler
insulation is obtained by a thick layer
of glass wool applied directly to the
boilerbody and therearelement. The
shell, made of stove enamelled steel
sheet, is quite simple, efficient and
modular and permits access to
inspection and maintenance
hatchways by simply removing
(withoutanytool) the front panel. The
shell also covers and protects the
controlboardwhichis furnishedtested
andalready wired.
Specific boiler data are given on the
data-decalapplied to thebacksection
of the right side.
1.2DELIVERY CONTENTS
Delivery consists of 6 packages:
1 - Palletwithboilercomponents
.
2 - Box with putty for seals between
modularcomponentsurfaces.
Puttyapplicatorandtwin-taper
connectionnipples.
3 - Tie-rods forassembly.
4 - Boxcontainingthefront
hatchways,thehinge for the
lowerdoor,front plugs,
connectionflangesandseals,
sheathforcontrolinstrument
probesand baffles.
5 - Box containing the shell,
insulation,spacersforpositioning
the shell, installation screws,
nuts and washers, technical and
guaranteedocuments.
6 - Box containing the control panel,
complete
7 - Assembly tools for boiler body
assembly(optionalequipment)