TR Comfortline II Bedienungsanleitung

Hygiene Equipment
Designed for People
1
Registered at Medical Products Agency,
Sweden as an MDR Class 1 product
according to MDR 2017/745.
TR reserves the right to make design
changes and/or improvements without
notice.
Always study this manual carefully before you
attempt to operate your bathing system. The
operator/user must always have access to the
operating manual.
This bathing system is intended for professional use
only where the patient will be under supervision of
trained personnel.
Operating instructions and recommended
maintenance procedures are explained in the
following pages.
If you have any questions regarding the operation or
maintenance of your bathing system and cannot find
the answer in this manual, please contact us.
The system is designed for years of trouble-free
operation, with proper use and maintenance.
Bathtub and shower water must be run at least every
three days.
Operating manual
Version 202
1
-
04
-
26
TR Comfortline II / TR Ecoline II
Height adjustable & fixed height
bathtubs
Mandatory to read the manual before using the bathtub.

Hygiene Equipment
Designed for People
2
Table of contents
Manufacturer
Page 3
Introduction
Page 4
Unpacking
Page 5
Installation
Page 6
Initialization/Calibration
Page 12
Intended use
Page 13
Safety Instructions
Page 14
Features and controls
Page 16
Product description
Page 17
Configurations
Page 18
Technical specification
Page 19
User instructions
Page 2
2
-
How to fill the tub
Page 2
2
-
How to enter and step out of the bath
Page 2
3
-
Foot support
Page 2
4
-
Showering
Page 2
5
-
Option, Cleaning system
Page 2
6
-
Option, Air Spa
Page 26
-
Option, LED Light
Page 2
9
-
Option, Music system
Page
30
-
Option, Autofill
Page 3
1
System
components
Page 3
2
-
Lifting columns
Page 3
2
-
Thermostatic mixer
Page 3
2
Labels and symbols
Page
3
3
Routine m
aintenance
Page 3
5
Cleaning instructions
Page 3
9
Maintenance record
Page
40
Training record
Page 4
1

Hygiene Equipment
Designed for People
3
Manufacturer
TR Equipment AB
Rundelgatan 2
SE-573 35 Tranås
Sweden
www.trequipment.com
Phone: +46 (0)140 38 50 60
Group subsidiaries:
USA
TR Group Inc. Phone: +1 (800) 7526900
United Kingdom:
TR Equipment Ltd Phone: +44 (0) 84433558386
Germany:
TranspoRehamed GmbH Phone: +49 (0) 212645850-0

Hygiene Equipment
Designed for People
4
Introduction
Dear Customer,
Thank you for choosing one of our quality products. We hope you enjoy the TR Comfortline II height adjustable
bathtub or your TR Ecoline II fixed height bathtub.
This manual shall, in conjunction with staff training, ensure that the operator/user is always using and/or
operating the Comfortline correctly.
New colleagues must be trained by qualified and experienced staff.
TR Equipment AB requires that each user has read and understands the entire operating manual and that
they can apply the instructions as specified. This applies to anyone who was not present at the in-service.
This instruction manual should generally be kept easily accessible for every user. Copying the whole manual is
encouraged since its sole purpose is to improve the standard of training and safety.
Please order another copy from us if the instruction manual is lost or unusable, or if it has become illegible
over time.
If you need further information, do not hesitate to contact TR Equipment AB or one of our qualified partners.
Mandatory to read the manual before using the bathtub.
Make sure you have read, understood and applied the information on the following pages
before using the bathtubs.

Hygiene Equipment
Designed for People
5
Unpacking
When you receive a bathtub from us it´s placed on a pallet surrounded by a cardboard crate.
If the cardboard box is wrapped in plastic carefully cut and remove the plastic.
Start unpacking the bathtub by removing the lower carton staples with a pliers.
DO NOT use any sharp tools that may scratch the bathtub.
Carefully lift off the cardboard frame from the pallet. When lifted, do so briefly and use at least two people.
Carefully lift off the bathtub from the pallet. DO NOT push or pull the bathtub!
Warning:
Never push or pull the bathtub! Always lift the bathtub from the pallet and into position!
If you push or pull the bathtub it will damage lifting columns / legs.

Hygiene Equipment
Designed for People
6
Installation instructions
The TR Comfortline II bathtub and TR Ecoline are delivered fully assembled, ready to be
connected to
water and power supply at the customer’s premises and must be installed according to local guidelines
and regulations.
The tub must be cleaned
before the first use!
Assembly process:
Do not drag nor push the bathtub across the floor as this will damage the lifting columns or legs.
When lifted, do so briefly and use at least two people.
1. Once the bathtub is in its final position, once again lift the bathtub briefly at each end at the same
time to release any tensions that might have been created between the lifting columns during
installation
2. The adjustable feet are used to level and adjust the bathtub. Please note that the head end of the
bathtub must be approximately 2cm (3/4” inch) higher than the foot end to allow the water to
drain more easily.
3. Flush the pipes at the premises thoroughly before connecting the Comfortline bathtub to protect
the tub and fittings from dirt.
4. A certified electrician shall connect the mains cord to a wall mounted mains connection (splash
proof) and in accordance to local regulations.
5. Raise the tub to its highest position and use the flexible drain hose to establish connection
between the floor gully and the drainage outlet underneath the tub.
6. Carry out a functional test (Height adjustable bathtub):
Test the UP/DOWN function by pushing each button the hand control. An initialization shall b
performed before the first use. See table of contents for separate Initialization/calibration
instructions.
7. Carry out a functional test of the thermostatic mixer:
The GROTHERM 800 thermostatic mixer is pre-set to a Maximum outlet temperature of 43° at
ideal installation conditions at the factory.
Make sure that maximum outlet temperature is 43°. If the maximum outlet temperature is higher
an adjustment needs to be done according to the instructions from the manufacturer of the
thermostatic mixer (separate manual supplied at delivery).
ALWAYS physically check the water temperature by hand before and during bathing to ensure
correct function of the thermostatic mixer.

Hygiene Equipment
Designed for People
7
Installation instructions
8. Carry out a Scalding safety function test:
Start filling the tub with water, shut OFF the cold-water supply to the thermostatic mixer. Within 2
seconds the thermostatic mixer shall be shut OFF.
If the thermostatic mixer continues to supply only HOT water the thermostatic mixer needs to be
replaced. DO NOT use the tub until the thermostatic mixer has been replaced.
9. Make sure the diverter mechanism allows you to switch between the tap and shower function.
10. Check that cold/hot water connections and make sure the drain hose is intact.
11. Make sure that the mains cord is free from damage and properly connected.
On-site preparations:
1. 3/4"Inch (hot and cold) water connections.
2. Check valves and shut off valves according to local regulations.
3. Incoming water pressure 1-5 bar.
4. Mains connection 230V/50Hz or 110V/60Hz depending on model.
5. Fuse 10A
The bathtub may only be connected to the power supply via a cord that is connected to a GFCI
(Ground Fault Circuit Interrupter) including an easily accessible switch near the bathtub.
Installation of the thermostatic mixer:
1. Flush the pipes at the premises according to DIN1988.
2. Attach connections (hot and cold) to the water supply.
3. The hot water supply needs to be on the left side and the cold-water supply must be on the right side.
Check the connections for any leaks and make sure the fittings are working properly.
Warning:
The bathtub may only be used after it has been successfully and correctly installed.
All electric conduit, fitting and wiring to bath supplied must be installed by a certified
electrician in accordance with local regulations. Main switch, main fuse and GFCI, Ground
Fault Circuit Breaker are NOT included at delivery and must be supplied by others.

Hygiene Equipment
Designed for People
8
Installation instructions
Height adjustable bathtub, TR Comfortline

Hygiene Equipment
Designed for People
9
Installation instructions
Fixed height bathtub, TR Ecoline

Hygiene Equipment
Designed for People
10
Installation instructions
Assembly of the cleaning system
Valve:
- Assemble the valve stem (1) by screwing it into the left female threaded coupling No.1 on the bath
tub.
- Screw on the protective sleeve (2) onto the valve stem (1).
- Push on the chromed ring (3) over the protective sleeve (2).
- Finally, screw on the key (4) onto the completed valve.
Dieses Handbuch passt für folgende Modelle
1
Inhaltsverzeichnis
Andere TR Badewanne Handbücher
Beliebte Badewanne Handbücher anderer Marken

Lyons
Lyons Elite ETLxx663219 Series Bedienungsanleitung

Woodbridge
Woodbridge BJ500 Montageanleitung

Whirlpool
Whirlpool Ariel ARL-702 Bedienungsanleitung

TEIKO
TEIKO EXCELLENT DUO Bedienungsanleitung

American Standard
American Standard Colony 5-1/2' x 32" Bedienungsanleitung

American Standard
American Standard 3052OD.X0X Kurzanleitung















