URE MA1-INV Bedienungsanleitung

V1.0
Installation Manual
Energy Storage System
(ESS)
MA1-INV

___________________________________________________________________
United Renewable Energy Co., Ltd. Page I of 45
IMPRINT
United Renewable Energy Co., Ltd.
7, Li-Hsin 3rd Rd, Hsinchu Science Park,
Hsinchu, Taiwan 300, R.O.C.
Aug. 19 2019

___________________________________________________________________
United Renewable Energy Co., Ltd. Page II of 45
Copyright Statement
This manual is under the copyright of United Renewable Energy Co., Ltd. with all
rights reserved. Please keep the manual properly and operate in strict accordance
with all safety and operating instructions in this manual. Please do not operate the
system without reading through the manual.
Version Information
Version
Date
Content
V1.0
20190819
New

___________________________________________________________________
United Renewable Energy Co., Ltd. Page III of 45
Content
IMPRINT.............................................................................................................. I
Copyright Statement........................................................................................ II
Version Information ......................................................................................... II
Content............................................................................................................. III
Introduction.................................................................................................. 5
1.1 System Introduction.............................................................................. 5
1.2 General Precautions.............................................................................. 5
1.3 Parts List ................................................................................................ 7
1.4 System Appearance............................................................................... 9
1.5 Liability Limitation............................................................................... 11
Installation.................................................................................................. 13
2.1 Installation Site and Environment...................................................... 13
2.2 Installation............................................................................................ 13
2.3 Power Meter ......................................................................................... 26
2.3.1 Meter ADL-3000 (If Applicable) .......................................................................26
2.3.2 Meter SM60A (If Applicable)............................................................................29
2.3.3 Backup Box (If Applicable) ..............................................................................30
System Operation ...................................................................................... 31
3.1 Switch on.............................................................................................. 31
3.2 Switch off.............................................................................................. 32
EMS Introduction and Set up.................................................................... 34
4.1 Function Description........................................................................... 34
4.2 Introduction.......................................................................................... 35
4.2.1 Main.................................................................................................................35
4.2.2 Status ..............................................................................................................35
4.2.3 History .............................................................................................................36
4.2.4 Setting .............................................................................................................38
Online Monitoring ...................................................................................... 42
5.1 Register ................................................................................................ 42
5.2 Registering License............................................................................. 43
Annex.......................................................................................................... 44
6.1 Datasheet –URE MA1-INV .................................................................. 44

___________________________________________________________________
United Renewable Energy Co., Ltd. Page IV of 45

___________________________________________________________________
United Renewable Energy Co., Ltd. Page 5 of 45
Introduction
1.1 System Introduction
URE MA1-INV can be applied in DC-coupled systems (mostly new installation), AC-
coupled systems (mostly retrofit) and Hybrid-coupled systems (mostly retrofit, and PV
capacity-increase), as the following scheme:
Figure 1 DC- and AC-/ Hybrid-coupled Storage System - Scheme
CAUTION:
For the AC-/ Hybrid-coupled system, unlike DC, two power meters are to be
mounted.
MA1-INV is only to be connected with MA1-BAT, a LFP battery. No other battery
can be connected to MA1-INV.
1.2 General Precautions
DANGER
Danger to life due to high voltages of the PV array, battery and electric shock.
When exposed to sunlight, the PV array generates dangerous DC voltage which
will be present in the DC conductors and the live components of the inverter.
Touching the DC conductors or the live components can lead to lethal electric
shocks. If you disconnect the DC connectors from the system under load, an
electric arc may occur leading to electric shock and burns.
➢Do not touch uninsulated cable ends.
➢Do not touch the DC conductors.
➢Do not open the inverter and battery.
➢Do not wipe the system with damp cloth.

___________________________________________________________________
United Renewable Energy Co., Ltd. Page 6 of 45
➢Have the system installed and commissioned by qualified people with the
appropriate skills only.
➢Prior to performing any work on the inverter or the battery pack, disconnect
the inverter from all voltage sources as described in this document.
WARNING
Risk of chemical burns from electrolyte or toxic gases.
During standard operation, no electrolyte shall leak from the battery pack and no
toxic gases shall form. Despite careful construction, if the Battery Pack is damaged
or a fault occurs, it is possible that electrolyte may be leaked or toxic gases formed.
➢Do not install the system in any environment of temperature below -10°C
or over 50°C and in which humidity is over 85%.
➢Do not touch the system with wet hands.
➢Do not put any heavy objects on top of the system.
➢Do not damage the system with sharp objects.
➢Do not install or operate the system in potentially explosive atmospheres
or areas of high humidity.
➢Do not mount the inverter and the battery pack in areas containing highly
flammable materials or gases.
➢If moisture has penetrated the system (e.g. due to a damaged enclosure),
do not install or operate the system.
➢Do not move the system when it is already connected with battery modules.
➢Secure the system to prevent tipping with restraining straps in your vehicle.
➢The transportation of URE MA1-INV must be made by the manufacturer or
an instructed personal. These instructions shall be recorded and repeated.
➢A certified ABC fire extinguisher with minimum capacity of 2kg must be
carried along when transporting.
➢It is totally prohibited to smoke in the vehicle as well as close to the vehicle
when loading and unloading.
➢For the exchange of a battery module, please request for new hazardous
goods packaging if needed, pack it and let it be picked up by the suppliers.
➢In case of contact with electrolyte, rinse the affected areas immediately with
water and consult a doctor without delay.
CAUTION:
Risk of injury through lifting or dropping the system.

___________________________________________________________________
United Renewable Energy Co., Ltd. Page 7 of 45
The inverter and battery are heavy. There is risk of injury if the inverter or battery is
lifted incorrectly or dropped during transport or when attaching to or removing from
the wall.
➢Lifting and transporting the inverter and battery must be carried out by more
than 2 people.
1.3 Parts List
Check the following parts list to ensure it is complete.
URE delivers a total system separately on site to client, this consists of:
MA1-INV
8x M8*60
2x M4
4x M6
1x Mounting Panel
1x Mounting
Bracket
10x M6
Gasket
2x MC4
8x RJ45
Connectors
1x Meter
(1x SM 60A or 1x ADL 3000)
1x
Installation
Manual
1x User
Manual
MA1-BAT
6x M8*60
6x M5*10
6x M4*10
2x Mounting Panel
6x M6 Gasket
2x Power Cable
(1 black, 1 red)
1x User Manual
Battery Communication Cable

___________________________________________________________________
United Renewable Energy Co., Ltd. Page 8 of 45

___________________________________________________________________
United Renewable Energy Co., Ltd. Page 9 of 45
1.4 System Appearance
Figure 2 MA1 Delivery Scope
Object
Description
1
Hybrid Inverter with Cable Box
2
Display Screen
3
Cable Box Part of Inverter
4
MA1-BAT (Battery 1)
5
MA1-BAT (Battery 2)
1
2
3
4
5
Inhaltsverzeichnis
Beliebte Lagerung Handbücher anderer Marken

Spectra Logic
Spectra Logic T-Series Spectra T50e Bedienungsanleitung

Panasonic
Panasonic LKM-F931-1 Bedienungsanleitung

Tabernus
Tabernus Enterprise Erase E2400 Bedienungsanleitung

Rocstor
Rocstor COMMANDER 3F series Bedienungsanleitung

HP
HP P9000 Bedienungsanleitung

Western Digital
Western Digital Ultrastar Data60 Bedienungsanleitung