WAGO BACnet/IP Kurzanleitung

Please file in Service Binder
6196 911 - 01 07/2022
WAGO BACnet/IP WITH
MS/TP ROUTER GATEWAY
Installation and
Service Instructions
for use by heating contractor
BMS communication with heating systems via BACnet
WAGO BACnet/IP with MS/TP router gateway
Product may not be exactly as shown
Read and save these instructions
for future reference.
IMPORTANT
Read and save these instructions
for future reference.
Product may not be exactly as shown
IMPORTANT

2
6196 911 - 01
WAGO Gateway Installation and Service
Safety, Installation and Warranty Requirements
Please ensure that these instructions are read and understood before commencing installation. Failure to comply with
the instructions listed below and details printed in this manual can cause product/property damage, severe personal
injury, and/or loss of life. Ensure all requirements below are understood and fulfilled (including detailed information
found in manual subsections).
Product documentation
Read all applicable documentation before commencing
installation. Store documentation near boiler in a
readily accessible location for reference in the future
by service personnel.
For a listing of applicable literature,
please see section entitled “Important
Regulatory and Safety Requirements”.
Licensed professional heating contractor
The installation, adjustment, service and maintenance
of this equipment must be performed by a licensed
professional heating contractor.
Please see section entitled Safety and
“Important Regulatory and Installation
Requirements”.
Advice to owner
Once the installation work is complete, the heating
contractor must familiarize the system operator/
ultimate owner with all equipment, as well as safety
precautions/requirements, shutdown procedure, and
the need for professional service annually before the
heating season begins.
Safety
Warranty
Information contained in this and
related product documentation must
be read and followed. Failure to do
so renders the warranty null and void.
2
Safety, Installation and Warranty Requirements

3
6196 911 - 01
WAGO Gateway Installation and Service
3
Safety
General Information
Installation
Specifications
Additional Information
Safety, Installation and Warranty Requirements..............2
Product documentation ..........................................2
Licensed professional heating contractor ..................2
Advice to owner ...................................................2
Warranty..............................................................2
Important Regulatory and Installation Requirements ....... 4
Approvals.............................................................4
Codes..................................................................4
Working on the equipment......................................4
Power supply .......................................................4
About these Installation Instructions .............................4
Intended Use ............................................................... 5
Product Information...................................................5
Spare Parts Lists ........................................................5
Mounting the Gateway ...............................................6
Preparing for Installation..............................................7
Quick Start Guide WAGO BACnet/IP with MS/TP Router .. 8
Process Overview.....................................................12
Installing the Module ................................................12
Connections and Operating Elements ..........................13
Connecting and Releasing Cores.................................15
Establishing the CAN Bus Connection .........................16
Connecting the Plug-in Attachment ........................ 18
Establishing the Connection to the BACnet/IP Gateway ..19
Connecting the Gateway to the Power Supply Unit.......20
Power Supply ..........................................................21
Commissioning the Gateway......................................22
Dismounting the Terminals ........................................22
Dismounting the Gateway .........................................23
Dismounting the Power Supply ..................................23
Gateway .................................................................24
Power Supply ..........................................................25
BACnet/IP to MS/TP Router Specification ....................26
Final Decommissioning and Disposal ...........................30
Page
Table of Contents
Page

4
6196 911 - 01
WAGO Gateway Installation and Service
General Information
Important Regulatory and Installation Requirements
Approvals
Viessmann boilers, burners and controls are approved for
sale in North America by CSA International.
Codes
The installation of this unit shall be in accordance with
local codes. In the absence of local codes, use:
- CSA C22.1 Part 1 and/or local codes in Canada
- National Electrical Code ANSI/NFPA 70 in the U.S.
Always use latest editions of codes.
The heating contractor must comply with the Standard
for Controls and Safety Devices for Automatically Fired
Boilers, ANSI/ASME CSD-1 where required by the
authority having jurisdiction.
Working on the equipment
The installation, adjustment, service, and maintenance
of this product must be done by a licensed professional
heating contractor who is qualified and experienced in the
installation, service, and maintenance of hot water boilers.
There are no user serviceable parts on the boiler, burner,
or control.
Power supply
Install power supply in accordance with the regulations
of the authorities having jurisdiction or, in absence of
such requirements, in accordance with National Codes.
Viessmann recommends the installation of a disconnect
switch to the 120V power supply outside of the boiler
room.
Ensure main power supply to equipment, the heating
system, and all external controls have been deactivated.
Close main oil or gas supply valve. Take precautions in
both instances to avoid accidental activation of power
during service work.
Please carefully read this manual prior to attempting
installation. Any warranty is null and void if these
instructions are not followed.
For information regarding other Viessmann System
Technology componentry, please reference
documentation of the respective product.
We offer frequent installation and service seminars
to familiarize our partners with our products. Please
inquire.
The completeness and functionality of field supplied
electrical controls and components must be verified
by the heating contractor. These include low water
cut-offs, flow switches (if used), staging controls,
pumps, motorized valves, air vents, thermostats, etc.
WARNING
Turn off electric power supply before
servicing. Contact with live electric
components can cause shock or loss
of life.
About these Installation Instructions
Take note of all symbols and notations intended to draw attention to potential hazards or important
product information.
CAUTION
Cautions draw your attention to the presence of potential
hazards or important product information.
WARNING
Warnings draw your attention to the presence of potential
hazards or important product information.
IMPORTANT
Indicates an imminently hazardous situation which,
if not avoided, could result in death, serious injury or
substantial product/property damage.
Indicates an imminently hazardous situation which,
if not avoided, may result in minor injury or product /
property damage.
Helpful hints for installation, operation or maintenance
which pertain to the product.
This symbol indicates to note additional information
This symbol indicates that other instructions must be
referenced.

5
6196 911 - 01
WAGO Gateway Installation and Service Installation
Intended Use
The WAGO BACnet/IP gateway is used to connect
Viessmann control units to BACnet systems.
For supported devices and other valid product
documentation, use the QR code on the left.
Functions
The system user can use the following functions via
the gateway when connected to a BACnet system:
H Transferring heating system operating states
H Setting heating system parameters
HRelaying fault and maintenance messages
Intended use
The gateway is only intended to be installed and operated
in conjunction with Viessmann control units, with
due attention paid to the associated installation, service
and operating instructions. The gateway may only
be used in systems with supported Viessmann heat
and power generators.
The gateway can only be used with the user and
communication
interfaces defined in the product documentation
for the following purposes:
H To monitor systems
H To operate systems
H To optimize systems
With regard to the communication interfaces, ensure on
site that the system requirements specified in the product
documentation are met at all times for every transfer
medium employed. Only use the specified components for
the power supply (e.g. power supply units).
Intended use presupposes that a fixed installation in
conjunction with permissible, system-specific components
has been carried out.
Commercial or industrial use for a purpose other than
the monitoring, operation and optimization of supported,
approved systems shall be deemed inappropriate.
Incorrect usage or operation of the appliance (e.g. the
appliance being opened by the system user) is prohibited
and will result in an exclusion of liability. Incorrect
usage also occurs if the components in the Viessmann
system are modified from their intended function.
Product Information
Spare Parts Lists
Information about spare parts can be found at
www.viessmann.com/etapp or in the Viessmann
spare part app.

6
6196 911 - 01
WAGO Gateway Installation and Service
Mounting the Gateway
Installation
1. Loosen the retaining screws from the extension kit
enclosure (do not remove).
2. Remove cover and set aside.
3. Mount the extension module enclosure to the wall
using the appropriate hardware.

7
6196 911 - 01
WAGO Gateway Installation and Service Installation
Preparing for Installation
Legend
A Viessmann boiler
B Building management system
C Terminator 120
D Gateway
E Power supply unit
F Laptop with web browser and WAGO Web-Visu
G Module enclosure
H BACnet IP to MS/TP router
WAGO BACnet gateway system overview

8
6196 911 - 01
WAGO Gateway Installation and Service
Quick Start Guide WAGO BACnet/IP with MS/TP Router
Installation
Install WAGO Gateway
Power up and connect WAGO Gateway to heat generators
via CAN-Bus (91 plug).
HPower Supply 24VDC (116 mA, 2.8 W)
HPolarity sensitive (H, and L)
HDaisy chain using (ISO 11898-2, twisted pair cable,
shielded, or CAT5 / CAT7)
HEnd resistors (or dip switch) on both ends of the
daisy chain only
Web Visualisation - Discover Boilers add points
Note: Commission your boiler(s) before configuring the
automation gateway
Open web browser to https://192.168.1.17 (user / user)
Project Settings
Navigate to General / Project Settings
HSelect Units (Metric / Imperial)
HSelect Application Type (Single or Multiple Devices)
HHeartbeat Monitoring
- Enabled: BMS must write to “External Request
(MV-1)” a value of “3” for BACnet cyclically, at least
once per 10 sec. or heat generator reverts to internal
control.
- Disabled: “External Request (MV-1)” does not need
to be written cyclically (just once). If connection to
BMS is interrupted, the heat generator continues to
adopt the setpoint that was written last.

9
6196 911 - 01
WAGO Gateway Installation and Service
Quick Start Guide WAGO BACnet/IP with MS/TP Router (continued)
Installation
Add Data points
Navigate to Datapoints / CAN-Status
Make sure you see all the heat generators you want to
add to the system
Select “Show Datapoints” and Confirm action to discover
points
Select the points you want to add to the BMS
Note: You must do this step for each heat generator

10
6196 911 - 01
WAGO Gateway Installation and Service
Quick Start Guide WAGO BACnet/IP with MS/TP Router (continued)
Installation
Configure the MS/TP router
Open Web browser to http://192.168.1.18
(admin / Vimaster99)
Note: It is recommended to leave the default IP address
of 192.168.1.18 The Wago gateway and MS/TP
router need to be on the same IP subnet to
communicate with each other.
In the “Confguration” tab you can modify the MS/
TP (green) section to accommodate the BMS network
requirements.
WBM - IP Address and UDP Port (Optional)
Note: It is recommended to not change the IP addresses
for the Wago gateway and the MS/TP router as they
both need to be on the same IP subnet to
communicate.
Open web browser to https://192.168.1.17/wbm (admin
/ wago) Navigate to Configuration / Networking / TCP/IP
Configuration
Change the IP address, hit Submit button (IP changes
immediately, change URL)
Optional:
HConfiguration / Users - Change passwords for wbm login
HConfiguration / Networking / Routing - (Default)
Gateway Address
HFieldbus / BACnet / Configuration - BACnet UDP Port
Inhaltsverzeichnis
Andere WAGO Tor Handbücher
Beliebte Tor Handbücher anderer Marken

LST
LST M500RFE-AS Bedienungsanleitung

Kinnex
Kinnex Media Gateway Bedienungsanleitung

2N Telekomunikace
2N Telekomunikace 2N StarGate Bedienungsanleitung

Mitsubishi Heavy Industries
Mitsubishi Heavy Industries Superlink SC-WBGW256 Bedienungsanleitung

ZyXEL Communications
ZyXEL Communications ZYWALL2 ET 2WE Bedienungsanleitung

Telsey
Telsey CPVA 500 - SIP Bedienungsanleitung

















