
3.0 3M™Cabinet Conversion Kits
3.1 Pole/wall mount conversion kits
a. Top entry cap
b. Bottom entry plate
c. Cabinet hanger brackets ( 2 top, 1 bottom)
d. Pole attachment hanger bracket (1)
e. Splitportcap(fortoporbottom)
f. Portcoverplate(fortoporbottom)
3.2 Pad mount conversion kit
a. (includes 3M 4220 SVB/VB-PMK-Grade
Pedcab BTM Entry Grade/Pole MT)
3.3 Stake mount conversion kit
a. 3M™Stake Mount Kit 4056-SVS-A
4.0 3M™Accessories and Spare Parts
4.1 3M™Quick System (QCS) 2810 blocks
4.2 Capsfor3M™Quick Connect System (QCS)
2810 blocks
4.3 PriorityCapsfor3M™Quick Connect System
(QCS) 2810 blocks
4.4 3M™Single Pair Test Probe 2827 and Dish
4.5 3M Single Pair Test Probe 2827
4.6 3M™Flex Port Kit 4297-4220SVB/VB-BP Kit
PanI.D.4"x9"(for4220VB300pair)
4.7 3M™Flex Port Kit 4297-4220SVC/VC-BP Kit
Bread Pan I.D. 4" x 11" Wide Flange
(for4220VC600pair)
4.8 3M™Jumper Wire Spools
a. 4068 – 800' 24 AWG orange/white
jumper wire
b. 4069 – 250' 24 AWG orange/white
jumper wire
c. 4368 – 800' 22 AWG red/white
jumper wire
d. 4369 – 250' 22 AWG red/white
jumper wire
5.0 3M™Cross-Connect Cabinet
4220VB/4220VC Installation
Note: Install feeder and distribution cables allowing
10.5' above the pad.
5.1 Pad mount application
1. Position cabinet on pad
a. Removeframe
b. Removebottomfrontentryplateoncabinet
(ifrequired)
c. Installbackhalfof3M™Flex Port Kit 4297
(ifinstalling)
2. Ensure cabinet to pad alignment is square
3.Ensurecablestevenlyinsidecable
entrance chamber
4.Re-installbottomfrontentryplateon
cabinet(ifremoved)
5.Installfrontplateof3M™Flex Port Kit 4297
(ifinstalling)
6. Secure the cabinet to the pad
a.Reinstallthefourmountinglugsthat
secured the cabinet to the shipping pallet
b.Markthepadinthecenterofthe
mounting lug hole
c. Remove mounting lugs
d. Drill holes in pad per your company
directive
e. Install appropriate anchors per your
company directive
f.Reinstallmountinglugs
g. Shim cabinet as required to set level on
the pad
h. Bolt cabinet to pad per your company
directive
578-0013-7947-4-A September 2015