
© Festo Didactic MPS
®
PA Compact Workstation
3
Intended use ___________________________________________________________ 2
Contents ______________________________________________________________ 3
1
Introduction _______________________________________________________ 5
1.1
Training contents _______________________________________________ 6
1.2
Important notes ________________________________________________ 7
1.3
Duty of the operating authority____________________________________ 7
1.4
Duty of trainees ________________________________________________ 7
1.5
Risks involved in dealing with the MPS® PA Compact Workstation ______ 8
1.6
Warranty and liability ____________________________________________ 9
1.7
Use for intended purpose ________________________________________ 9
Notes on safety ________________________________________________________11
2
Technical data_____________________________________________________13
3
Transport / Unpacking / Scope of delivery _____________________________15
4
Design and function ________________________________________________17
4.1
Level monitoring_______________________________________________20
4.2
Pump ________________________________________________________24
4.3
Proportional valve _____________________________________________25
4.4
Heating ______________________________________________________26
4.5
2W ball valve with pneumatic rotary drive __________________________28
4.6
Level control function___________________________________________29
4.7
Flow rate control function _______________________________________31
4.8
Pressure control function________________________________________33
4.9
Temperature control system _____________________________________35
4.10
I/O-board __________________________________________________37
4.11
Mouting frame ______________________________________________38
5
Commissioning ____________________________________________________39
5.1
Workstation___________________________________________________40
5.2
Visual check __________________________________________________40
5.3
Cable connections _____________________________________________41
5.3.1
Simulation box digital/analog and MPS® PA Compact Workstation 41
5.3.2
Easyport digital/analog and MPS® PA Compact Workstation______43
5.3.3
EduTrainer Siemens S7-300 and MPS® PA Compact Workstation __45
5.3.4
EduTrainer Logo and MPS® PA Compact Workstation ____________47
5.3.5
EduTrainer Festo CPX-FEC IT and MPS® PA Compact Workstation __49
5.3.6
EduTrainer Allen Bradley and MPS® PA Compact Workstation_____52
5.4
Pneumatic connection __________________________________________55
5.5
Voltage supply ________________________________________________55
5.6
Adjusting sensors______________________________________________56
5.6.1
Capacitive proximity sensor B113/B114 _______________________56
5.6.2
Float switch S111/S112/S117 _______________________________57
6.6.3
Ultrasonic sensor B101 _____________________________________58
5.7
Choosing controlled system _____________________________________59
5.8
Allocation list of inputs and outputs ______________________________61
5.9
Loading the PLC program________________________________________62