Fröling FBR-G Bedienungsanleitung

Installation and Operating Instructions
FBR-G / TGR-G
with separate rotary agitator drive and discharge screw
Translation of the original German operating and installation instructions for technicians and operators
Read and follow the instructions and safety information!
Technical changes, typographical errors and omissions reserved!
M1730116_en | Edition 29/02/2016
Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com

Table of contents
1 General 4
1.1 Functional description 5
2 Safety 6
2.1 Hazard levels of warnings 6
2.2 Permitted uses 7
2.2.1 Permitted fuels 7
Wood chips
7
Wood pellets
8
2.3 Qualification of staff 8
2.3.1 Qualification of assembly staff 8
2.3.2 Personal protective equipment for assembly staff 8
2.3.3 Qualification of operating staff 9
2.3.4 Protective equipment for operating staff 9
2.4 Design information 9
2.4.1 Standards 9
2.4.2 Requirements at the installation site 10
Information about the fuel store
10
2.5 Safety devices 11
2.6 Residual risks 12
3 Technical information 14
3.1 Dimensions 14
3.2 Store sizes 15
3.3 Technical specifications 16
4 Installation 17
4.1 Transport and handling 17
4.1.1 Temporary storage 17
4.2 Installation site 17
4.2.1 Information about setup 18
4.2.2 Wall opening 21
4.3 Installing the discharge system 22
4.3.1 Materials supplied with discharge screw 22
4.3.2 Materials supplied with FBR 22
4.3.3 Materials supplied with TGR 23
4.3.4 Materials supplied with rotary agitator 23
4.3.5 Installing the discharge screw 24
4.3.6 Fitting the rotary agitator 28
4.3.7 Aligning the trough of the discharge screw 31
4.3.8 Securing the adjustable feet and support elements 32
4.3.9 Setting the tension of the torsion springs 32
4.3.10 Closing the wall penetration 33
4.4 Connecting the system 34
4.4.1 Electrical connection 34
4.4.2 Connecting the sprinkler system 34
Table of contents
2 Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com

5 Operating the system 35
5.1 General information 35
5.2 Initial startup 35
5.3 Filling the store with fuel 36
5.3.1 Loading of fuel for a partially emptied store with rotary agitator 37
5.3.2 Loading fuel in an empty store space with a rotary agitator 37
5.3.3 Blowing in fuel for a partially emptied store with rotary agitator 38
5.3.4 Blowing in fuel for an empty store with rotary agitator 39
5.4 During operation 40
5.5 Decommissioning 40
5.5.1 Disassembly 40
5.5.2 Disposal 40
6 Servicing 41
6.1 Maintenance schedule 41
6.2 Maintenance contract 42
7 Troubleshooting 43
7.1 Procedure for fault messages 43
Table of contents
Installation and Operating Instructions | M1730116_en 3

1 General
Thank you for choosing a quality product from Froling. The product features a state-of-
the-art design and conforms to all currently applicable standards and testing
guidelines.
Please read and observe the documentation provided and always keep it close to the
system for reference. Observing the requirements and safety information in the
documentation makes a significant contribution to safe, appropriate, environmentally
friendly and economical operation of the system.
The constant further development of our products means that there may be minor
differences from the pictures and content. If you discover any errors, please let us
know: [email protected].
Subject to technical change.
This is an incomplete machine as defined by the Machinery Directive. The incomplete
machine must only be started up when it has been confirmed that the machine, in
which the incomplete machine has been installed, conforms to the provisions of
Directive 2006/42/EC.
Compliance with the open provisions and verification of the correct installation must be
confirmed in the delivery certificate of the declaration of installation (included in
documentation).
Issuing a delivery
certificate
1General
4 Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com

1.1 Functional description
TGR torsion arm agitator: FBR spring blade agitator:
A Rotary agitator geared motor F Rotary agitator mitre gear
B Rotary agitator duct with drive shaft G Discharge screw geared motor
C Rotary agitator plate H Gravity shaft
D Articulated arms with torsion springs
(TGR)
I Discharge screw closed trough
E Spring piles (FBR) J Discharge screw open trough
When the store is full, the rotary agitator arms are positioned at the rotary agitator
plate, reducing resistance during system operation due to the smaller diameter.
If fuel is requested using the boiler controller, the system starts and the material is
loosened by the pre-tensioned rotary agitator arms, and fed to the trough of the
discharge screw. The discharge screw feeds the material to the transfer position,
where it falls through the burn back protection system (burn back flap/rotary valve) into
the stoker screw of the boiler that is positioned below or into another feed screw.
The feed output can be variably adjusted regardless of the discharge screw thanks to
the separate drive of the rotary agitator.
General 1
Functional description
Installation and Operating Instructions | M1730116_en 5

2 Safety
2.1 Hazard levels of warnings
This documentation uses warnings with the following hazard levels to indicate direct
hazards and important safety instructions:
DANGER
The dangerous situation is imminent and if measures are not observed it will lead
to serious injury or death. You must follow the instructions!
WARNING
The dangerous situation may occur and if measures are not observed it will lead
to serious injury or death. Work with extreme care.
CAUTION
The dangerous situation may occur and if measures are not observed it will lead
to minor injuries or damage to property.
2Safety
Hazard levels of warnings
6 Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com

2.2 Permitted uses
Froling’s “FBR-G / TGR-G with separate rotary agitator drive and discharge screw“ is
solely designed for discharging fuels from dedicated stores. Only use fuels specified in
the “Permitted fuels” section.
The unit should only be operated when it is in full working order. It should be operated
in accordance with the instructions, observing safety precautions, and you should
ensure you are aware of the potential hazards. The inspection and cleaning intervals
in the operating instructions should be observed. Ensure that any faults which might
impair safety are rectified immediately.
The manufacturer or supplier is not liable for any damage resulting from non-permitted
uses.
DANGER
If the device is used incorrectly:
Incorrect use of the system can cause severe injury and damage.
When operating the system:
❒ Observe the instructions and information in the manuals
❒ Observe the details on procedures for operation, maintenance and cleaning,
as well as troubleshooting in the respective manuals.
❒ Any work above and beyond this (e.g. servicing) must be carried out by a
heating engineer approved by Fröling Heizkessel- und Behälterbau GesmbH
or by Froling customer services
2.2.1 Permitted fuels
Wood chips
Criterion Designation as per Description acc. to
ÖNORM M 7133
ÖNORM M 7133 EN ISO 17225
Water content W20 M20 air-dried
W30 M30 suitable for storage
W35 M35 limited suitability for
storage
Size G30 P16S Fine wood chip
G50 P31S Medium-sized wood
chip
EU: Fuel acc. to EN ISO 17225 - Part 4: Wood chips class A1 / P16S-P31S
Additional for
Germany:
Fuel class 4 (§3 of the First Federal Emissions Protection Ordinance
(BimSchV) - applicable version)
Note on standards
Safety 2
Permitted uses
Installation and Operating Instructions | M1730116_en 7

Wood pellets
Wood pellets made from natural wood with a diameter of 6 mm
EU: Fuel acc. to EN ISO 17225 - Part 2: Wood pellets class A1 / D06
and/or: EN
plus
/ DIN
plus
certification scheme
General note:
Before refilling the store, check for pellet dust and clean if necessary.
2.3 Qualification of staff
2.3.1 Qualification of assembly staff
CAUTION
Assembly and installation by unqualified persons:
Risk of personal injury and damage to property
During assembly and installation:
❒ Observe the instructions and information in the manuals
❒ Only allow appropriately qualified personnel to work on the system
Assembly, installation, initial startup and servicing must always be carried out by
qualified personnel:
- Heating technician / building technician
- Electrical installation technician
- Froling customer services
The assembly staff must have read and understood the instructions in the
documentation.
2.3.2 Personal protective equipment for assembly staff
You must ensure that staff have the protective equipment specified by accident
prevention regulations.
▪ For transportation, setup and assembly:
- suitable work wear
- protective gloves
- sturdy shoes (min. protection class S1P)
Note on standards
2Safety
Permitted uses
8 Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com

2.3.3 Qualification of operating staff
CAUTION
If unauthorised persons enter the installation room / boiler room:
Risk of personal injury and damage to property
❒ The operator is responsible for keeping unauthorised persons, in particular
children, away from the system.
Only trained operators are permitted to operate the unit. The operator must also have
read and understood the instructions in the documentation.
2.3.4 Protective equipment for operating staff
You must ensure that staff have the protective equipment specified by accident
prevention regulations.
▪ For operation, inspection and cleaning:
- suitable work wear
- protective gloves
- sturdy shoes
2.4 Design information
Carrying out modifications to the system and changing or disabling safety equipment
is prohibited.
Always comply with all fire, building and electrical regulations when installing and
operating the system, in addition to following the assembly and operating instructions
and mandatory regulations that apply in the country of use.
2.4.1 Standards
The system must be installed and commissioned in accordance with the local fire and
building regulations. The following standards and regulations should be observed in
any case:
ÖNORM / DIN EN 60204 Safety of machines; Electrical equipment of machines, Part 1:
General requirements
TRVB H 118 Technical directives for fire protection/prevention (Austria)
ÖNORM H 5170 Construction and fire protection requirements (Austria)
ÖNORM H 5190 Heating systems - Acoustic insulation
EN ISO 13857 Safety of machines; Safety distances for maintaining a safe
distance from hazardous areas
Safety 2
Qualification of staff
Installation and Operating Instructions | M1730116_en 9

2.4.2 Requirements at the installation site
▪ Protect the store against all weather conditions.
▪ Protective structures must be designed in accordance with the applicable
standards and regulations
Information about the fuel store
NOTICE! The fuel store plate provided must be affixed in a conspicuous place in the
access area of the store
When FILLING the fuel store, observe the system DOCUMENTATION.
The filling procedures may vary depending on the discharge system, type of fuel and
fill level of the fuel store. Only use fuels permitted according to the boiler’s operating
instructions.
SWITCH OFF the HEATING AND FEED SYSTEM before ENTERING the fuel store.
Risk of injury due to moving parts and automatic startup. Shut off the feeder unit
before entering the fuel store and secure it so that it cannot be switched on again.
There is a further risk of injury from the uncontrolled rotation of spring-loaded
components. These must be secured during work.
There is a risk of carbon monoxide poisoning in the pellet stores. Adequately ventilate
the store before entering (at least 15 mins.). Only enter the store under the
supervision of a second person. While in the store, keep the door open and use a dust
mask! There is a risk of collapse and being buried alive as a result of cavity formation
in the store. Therefore, do not enter the fuel area!
Slick surfaces in the fuel store present a slipping hazard and fuel supply points
present a risk of falling.
As a rule, personal protective equipment (work clothing, protective gloves, sturdy
shoes) should be worn when working in the store and on the conveyor.
Unauthorized access prohibited! Keep children away! Design the fuel store in such a
way that it is safe to access and keep it locked. Keep the key in a safe place. No fire,
open flames or smoking! Protect the fuel from moisture.
Affix this notice in a conspicuous place in the access area of the fuel store.
2Safety
Design information
10 Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
Andere Handbücher für FBR-G
1
Dieses Handbuch passt für folgende Modelle
1
Inhaltsverzeichnis
Andere Fröling Gleichstromantrieb Handbücher
Beliebte Gleichstromantrieb Handbücher anderer Marken

Vincent Associates
Vincent Associates UNIBLITZ ED12DSS Bedienungsanleitung

EKSMA OPTICS
EKSMA OPTICS DQ-100-4 Stücklistenhandbuch

Chamberlain Garog
Chamberlain Garog D Series Bedienungsanleitung

Parker
Parker PDS Series Bedienungsanleitung

Festo
Festo DGC G Series Einrichtungshandbuch

Binks
Binks QS-5012-1-CE Bedienungsanleitung