Fröling FBR Bedienungsanleitung

Installation and operating instructions
Spring blade agitator FBR
Translation of original German version of installation and operating instructions for technicians and
operators.
Read and follow all instructions and safety instructions.
All errors and omissions excepted.
M0741021_en | Edition 18/10/2021

Table of Contents
ii M0741021_en | Installation and operating instructions Spring blade agitator FBR
1 General ......................................................................................................................................................... 4
1.1 Functional description........................................................................................................................... 5
2 Safety............................................................................................................................................................ 6
2.1 Hazard levels of warnings..................................................................................................................... 6
2.2 Permitted uses...................................................................................................................................... 7
2.2.1 Permitted fuels........................................................................................................................... 8
2.3 Qualification of staff .............................................................................................................................. 9
2.3.1 Qualification of assembly staff ................................................................................................... 9
2.3.2 Personal protective equipment for assembly staff ..................................................................... 9
2.3.3 Qualification of operating staff ................................................................................................... 9
2.3.4 Protective equipment for operating staff .................................................................................... 10
2.4 Design information................................................................................................................................ 10
2.4.1 Standards................................................................................................................................... 10
2.4.2 Requirements at the installation site.......................................................................................... 11
2.5 Safety devices ...................................................................................................................................... 12
2.6 Residual risks ....................................................................................................................................... 13
3 Technology .................................................................................................................................................. 15
3.1 Dimensions ........................................................................................................................................... 15
3.2 Store sizes ............................................................................................................................................ 16
3.3 Technical specifications........................................................................................................................ 17
4 Installation.................................................................................................................................................... 18
4.1 Transport and handling......................................................................................................................... 18
4.1.1 Temporary storage..................................................................................................................... 18
4.2 Installation site ...................................................................................................................................... 18
4.2.1 Wall penetration......................................................................................................................... 19
4.3 Installing the spring blade agitator ........................................................................................................ 20
4.3.1 Materials supplied ...................................................................................................................... 20
4.3.2 Assembling the gears and feeder trough................................................................................... 21
4.3.3 Fitting the rotary agitator head................................................................................................... 24
4.3.4 Mounting the fibre shredder (optional)....................................................................................... 25
4.3.5 Fitting the upper part of gravity shaft and drive unit................................................................... 26
4.3.6 Fitting attachments..................................................................................................................... 29
4.3.7 Fitting the spring blades............................................................................................................. 30
4.3.8 Fitting adjustable feet in boiler room (optional).......................................................................... 31
4.3.9 Closing the wall penetration....................................................................................................... 31
4.3.10 Temperature monitoring device in the fuel store (TMD): ........................................................... 32
4.4 Connecting the system ......................................................................................................................... 33
4.4.1 Electrical connection.................................................................................................................. 33
4.4.2 Connecting the sprinkler system................................................................................................ 33
5 Operating the system.................................................................................................................................. 34
5.1 General information .............................................................................................................................. 34
5.2 Initial startup ......................................................................................................................................... 34
5.3 Filling/refilling the store with fuel........................................................................................................... 35
5.3.1 Loading of fuel for a partially emptied store with rotary agitator ................................................ 35
5.3.2 Loading fuel into an empty fuel store with a rotary agitator ....................................................... 36
5.3.3 Blowing in fuel for a partially emptied store with rotary agitator................................................. 36
5.3.4 Blowing in fuel for an empty store with rotary agitator ............................................................... 37
5.3.5 Drainage of fuel store................................................................................................................. 38
5.4 During operation ................................................................................................................................... 38
5.5 Decommissioning ................................................................................................................................. 39
5.5.1 Disassembly............................................................................................................................... 39

Table of Contents
M0741021_en | Installation and operating instructions Spring blade agitator FBR iii
5.5.2 Disposal ..................................................................................................................................... 39
6 Servicing the system................................................................................................................................... 40
6.1 Maintenance work by the operator ....................................................................................................... 41
6.2 Maintenance work by technicians......................................................................................................... 43
6.3 Replacement parts................................................................................................................................ 43
7 Troubleshooting .......................................................................................................................................... 44

1 | General
4 M0741021_en | Installation and operating instructions Spring blade agitator FBR
1 General
Thank you for choosing a quality product from Froling. The product features a state-of-
the-art design and conforms to all currently applicable standards and testing guidelines.
Please read and observe the documentation provided and always keep it close to the
system for reference. Observing the requirements and safety information in the
documentation makes a significant contribution to safe, appropriate, environmentally
friendly and economical operation of the system.
The constant further development of our products means that there may be minor
differences from the pictures and content. If you discover any errors, please let us know:
Subject to technical change.
Issuing a delivery
certificate This is an incomplete machine as defined by the Machinery Directive. The incomplete
machine must only be started up when it has been confirmed that the machine, in which
the incomplete machine has been installed, conforms to the provisions of Directive
2006/42/EC.
Compliance with the open provisions and verification of the correct installation must be
confirmed in the delivery certificate of the declaration of installation (included in
documentation).

General | 1
M0741021_en | Installation and operating instructions Spring blade agitator FBR 5
1.1 Functional description
The Froling discharge system “Spring blade agitator (FBR)“ consists of:
1
1
2
3
4
5
6
8
9
12
710
11
1Spring piles
2Rotary agitator head
3Intermediate plate for connecting the raised floor to the rotary agitator head
4Mitre gear
5Trough channel, open
6Discharge screw
7Cover plate for wood chips or pellets
8Raising plate for fuel store without raised floor
9Transfer channel from open to closed trough channel
10 Trough channel, closed
11 Top part of gravity shaft with gravity shaft cover and water sprinkler system
12 Geared motor
When the store is full, the rotary agitator arms are positioned at the rotary agitator plate,
reducing resistance during system operation due to the smaller diameter.
If fuel is requested using the boiler controller, the system starts and the material is
loosened by the pre-tensioned rotary agitator arms, and fed to the trough of the discharge
screw. The discharge screw feeds the material to the transfer position, where it falls
through the burn back protection system (burn back flap/rotary valve) into the stoker
screw of the boiler that is positioned below or into another feed screw.

2 | Safety
6 M0741021_en | Installation and operating instructions Spring blade agitator FBR
2 Safety
2.1 Hazard levels of warnings
This documentation uses warnings with the following hazard levels to indicate direct
hazards and important safety instructions:
DANGER
The dangerous situation is imminent and if measures are not observed it will lead
to serious injury or death. You must follow the instructions!
WARNING
The dangerous situation may occur and if measures are not observed it will lead to
serious injury or death. Work with extreme care.
CAUTION
The dangerous situation may occur and if measures are not observed it will lead to
minor injuries.
NOTICE
The dangerous situation may occur and if measures are not observed it will lead to
damage to property or pollution.

Safety | 2
M0741021_en | Installation and operating instructions Spring blade agitator FBR 7
2.2 Permitted uses
Froling’s “Spring blade agitator (FBR)” discharge system is only designed to discharge
fuels from suitable stores. Only use fuels specified in the “Permitted fuels” section.
The unit should only be operated when it is in full working order. It must be operated in
accordance with the instructions, observing safety precautions, and you should ensure
you are aware of the potential hazards. The inspection and cleaning intervals in the
operating instructions must be observed. Ensure that any faults which might impair safety
are rectified immediately.
The manufacturer or supplier is not liable for any damage resulting from non-permitted
uses.
Only original spare parts or specific alternative spare parts authorised by the
manufacturer may be used. Any kind of change or modification made to the product will
invalidate the manufacturer’s conformity with the applicable guideline(s). In such cases,
the product will need to undergo new hazard evaluation procedures by the operator. The
operator will then be fully responsible for the declaration of conformity according to the
valid guideline(s) for the product and will need to issue a corresponding declaration for
the device. This person will then assume all of the rights and responsibilities of a
manufacturer.
DANGER
If the device is used incorrectly:
Incorrect use of the system can cause severe injury and damage.
When operating the system:
rObserve the instructions and information in the manuals
rObserve the details on procedures for operation, maintenance and cleaning, as well
as troubleshooting in the respective manuals.
rAny work above and beyond this (e.g. servicing) must be carried out by a heating
engineer approved by Fröling Heizkessel- und Behälterbau GesmbH or by Froling
customer services

2 | Safety
8 M0741021_en | Installation and operating instructions Spring blade agitator FBR
2.2.1 Permitted fuels
Wood chips
Designation as per
EN ISO 17225-4
Description
M20 Water content max. 20%
M30 Water content max. 30%
M35 Water content max. 35%
P16S Main proportion (at least 60% mass portion): 3.15–16 mm, max.
length of 45 mm, used to be fine wood chips G30
P31S Main proportion (at least 60% mass portion): 3.15–31.5 mm, max.
length of 150 mm, used to be medium-sized wood chips G50
Note on standards EU: Fuel acc. to EN ISO 17225 - Part 4: Wood chips class A2 / P16S-P31S M35
Additional for
Germany:
Fuel class 4 (§3 of the First Federal Emissions Protection Ordinance
(BimSchV) in the last amended version)
Wood pellets
Wood pellets made from natural wood with a diameter of 6mm
Note on standards EU: Fuel acc. to EN ISO 17225 - Part 2: Wood pellets class A1 / D06
and/or: ENplus / DINplus certification scheme
General note:
Before refilling the store, check for pellet dust and clean if necessary.

Safety | 2
M0741021_en | Installation and operating instructions Spring blade agitator FBR 9
2.3 Qualification of staff
2.3.1 Qualification of assembly staff
CAUTION
Assembly and installation by unqualified persons:
Risk of personal injury and damage to property
During assembly and installation:
rObserve the instructions and information in the manuals
rOnly allow appropriately qualified personnel to work on the system
Assembly, installation, initial startup and servicing must only be carried out by qualified
personnel:
▪ Heating technicians/building technicians
▪ Electrical installation technicians
▪ Froling customer services
The assembly staff must have read and understood the instructions in the documentation.
2.3.2 Personal protective equipment for assembly staff
You must ensure that staff have the protective equipment specified by accident
prevention regulations!
▪ During transport, erection and installation:
- wear suitable work wear
- wear protective gloves
- wear safety shoes (min. protection class S1P)
2.3.3 Qualification of operating staff
CAUTION
If unauthorised persons enter the Storeroom:
Risk of personal injury and damage to property
rThe operator is responsible for keeping unauthorised persons, in particular children,
away from the system.
Only trained operators are permitted to operate the unit. The operator must also have
read and understood the instructions in the documentation.

2 | Safety
10 M0741021_en | Installation and operating instructions Spring blade agitator FBR
2.3.4 Protective equipment for operating staff
You must ensure that staff have the protective equipment specified by accident
prevention regulations!
▪ For operation, inspection and cleaning:
- suitable work wear
- protective gloves
- sturdy shoes
2.4 Design information
Carrying out modifications to the system and changing or disabling safety equipment is
prohibited.
Always comply with all fire, building and electrical regulations when installing and
operating the system, in addition to following the assembly and operating instructions and
mandatory regulations that apply in the country of use.
2.4.1 Standards
The system must be installed and commissioned in accordance with the local fire and
building regulations. The following standards and regulations should be observed in any
case:
ÖNORM / DIN EN 60204 Safety of machines; Electrical equipment of machines, Part 1:
General requirements
TRVB H 118 Technical directives for fire protection/prevention (Austria)
ÖNORM H 5170 Construction and fire protection requirements (Austria)
ÖNORM H 5190 Heating systems - Acoustic insulation
EN ISO 13857 Safety of machines; Safety distances for maintaining a safe distance
from hazardous areas
Inhaltsverzeichnis
Andere Fröling Gleichstromantrieb Handbücher
Beliebte Gleichstromantrieb Handbücher anderer Marken

Vincent Associates
Vincent Associates UNIBLITZ ED12DSS Bedienungsanleitung

EKSMA OPTICS
EKSMA OPTICS DQ-100-4 Stücklistenhandbuch

Chamberlain Garog
Chamberlain Garog D Series Bedienungsanleitung

Parker
Parker PDS Series Bedienungsanleitung

Festo
Festo DGC G Series Einrichtungshandbuch

Binks
Binks QS-5012-1-CE Bedienungsanleitung












