Juwent TERM-E-18 Bedienungsanleitung

ELECTRIC HEATING AND VENTILATION UNITS
TERM-E
Szymański, Nowakowski General Partnership
31 Lubelska Str., 08-500 Ryki
phone +48 81 883 56 00, fax +48 81 883 56 09
POLAND
I. CONTACTS
II. ORIGINAL INSTRUCTION MANUAL
III. WARRANTY TERMS AND CONDITIONS
IV. UNIT STARTUP REPORT
V. INSPECTION AND MAINTENANCE DOCUMENT
VI. SERVICE NOTIFICATION
VII. LIST OF SUBASSEMBLIES INSTALLED IN THE UNIT
Please read this instruction manual carefully before beginning any work.
RYKI 2017
ISSUE 1 EN

2www.juwent.com.pl
I. CONTACTS
Szymański, Nowakowski General Partnership
31 Lubelska Str., 08-500 Ryki
phone +48 81 883 56 00, fax +48 81 883 56 09
POLAND
Export department
mob.+48 502 087 841
mob.+48 664 465 243

3www.juwent.com.pl
ELECTRIC HEATING AND VENTILATION UNITS
TERM-E
II. ORIGINAL INSTRUCTION MANUAL

4www.juwent.com.pl
TABLE OF CONTENTS
1. INTENDED USE 5
2. DESIGNATIONS 5
3. DEVICE DESCRIPTION 5
4. TECHNICAL DATA 6
5. ADDITIONAL EQUIPMENT 8
6. TRANSPORT 10
7. SAFETY RECOMMENDATIONS 10
8. MOUNTING 11
9. WIRING SYSTEM 14
10. AUTOMATICS 15
11. DEVICE COMMISSIONING 16
12. REPAIR, MAINTENANCE AND WITHDRAWAL FROM USE 16
13. TROUBLESHOOTING 17
14. INFORMATION 17

5www.juwent.com.pl
1. INTENDED USE
TERM-E heating and ventilation units, are intended to heat and ventilate such compartment as:
industrial halls, warehouses, workshops, other objects of similar use
The units should be used only according to the intended use.
The manufacturer is not liable for using the units against the intended use and for any
damages arisen for this reason.
TERM 1; 2; 3 and 4 units cannot be used in the compartments with relative humidity
larger than 95% and air dust concentration over 3mg/m3.
The compartment can be served by one or larger number of the units, also by the units of different
sizes. The units can operate as heating or heating and ventilation units with added intake boxes and
wall or roof intakes. The intake boxes enable to draw circulating air through grids located on either
side of the box and fresh air through an inlet hole of the intake box.
2. DESIGNATIONS
Heating and ventilation unit TERM-E -27-D
Heating power 18, 27 kW
Equipment
single-row grid (K);
slot diffuser (N);
discharge cone (D);
Marking of unit’s optional automation
AT-RTA
Supply and control box AT
Additional elements
temperature regulator (RTA)
timer (ZG)
regulator and timer (RTA + ZG)
3. DEVICE DESCRIPTION
W skład aparatu wchodzą:
»axial fan mounted on the rear wall of the unit with a net protecting the rotor;
»electric heaters with spirally rolled aluminium nned tubes;
»casing made of steel sheets with a single-row outlet grid allowing adjusting a direction of supply
air. The structure of grid blades protects against an automatic rearrangement of the blades.
The single-row grid can be replaced with the slot diffuser or outlet nozzle.
The casing can be made of stainless steel sheets.
»protection net made of galvanized steel sheet against accidental contact with heaters,
The casing variant with the following items is recommended to use with the units which are planned
to be operated as ceilings ones:
»slot diffuser - for heating a zone of human presence by a secondary air stream;
»discharge cone - for increasing a range of supply air stream.

6www.juwent.com.pl
4. TECHNICAL DATA
Size of unit TERM-E-18 TERM-E-27
Dimensions
A [mm] 556 556
B [mm] 526 526
L [mm] 420 420
a [mm] 420 420
b [mm] 290 290
Weight [kg] 30 34
Unit’s IP 30 30
Parameters of fans in units
Type of fan FE-031EQ FE-035EQ
Revoluons [rev/min] 1400 1400
Voltage [V] 230 230
Motor power [W] 140 180
Current [A] 0,63 0,77
Parameters of heaters in units
Voltage [V] 400 400
Power [kW] 18 27
Current [A] 27 39
Noise level dB[A]
At distance of 1m 61 63
At distance of 5m 57 59
Noise level - sound pressure level at a distance of 1 and 5m taking account of directivity factor Q=2
and room absorption value A=50m2.
Heat output of units and air temperature rises
Size of unit TERM-E-18 TERM-E-27
Acvaon
threshold of
heaters
Air ow capacity [m3/h], heat output [kW], outlet air temperature rise [oC]
[m3/h] kW OC [m3/h] kW OC
I1400 6 8 1900 9 9
II 1600 12 17 2200 18 17
III 2100 18 25 2900 27 26

7www.juwent.com.pl
Unit environment and fan motor parameters
Unit
size
Operation temperature
[OC] IP Insulating class
TERM-E do +60 54 F
OUTLET DIFFUSERS FOR THE UNITS
TERM-E
Unit with single-row outlet grid (K)
Slot diffuser (N)
Discharge cone (D)
Slot diffuser (N)
Size of unit A x B
[mm x mm]
a x b
[mm x mm]
Ln
[mm]
TERM-E 555 x 525 355 x 355 100
Discharge cone(D)
Size of unit A x B
[mm x mm]
c x d
[mm x mm]
Ld
[mm]
TERM-E 555 x 525 350 x 350 190
The units are supplied with the single-row grid as a standard.
Grids have the movable blades enabling the air stream direction and reach adjustment.
Ceiling units can be equipped with:
»slot diffusers (N) (air supply to 4 sides);
»discharge cone (D).
Wall units can be also equipped with discharge cone (D).
Slot diffusers are enabling heating people staying zones with the secondary air stream.
Unit TERM-E with slot diffuser can be suspended on the height max. 4m.
Discharge cone enable increase of air supply range.

8www.juwent.com.pl
5. ADDITIONAL EQUIPMENT
ROOF INTAKE CD
The roof intakes are intended to draw fresh air from above the roof and to protect the object against
precipitation.
In order to protect against pollution and insects the intakes have shields and nets installed on either
side (only for CD-4 and amount of external air over 40% the intake has the shields installed on four
sides).
The intakes are adapted to connect with the roof bases PD.
Unit size Intake
size
A
[mm]
Lc
[mm]
C
[mm]
Weight
[kg]
TERM-E CD-1 520 580 728 20,0
S - net
o - shield
The roof intakes are whole made of galvanized steel sheets.
ROOF BASE PD
The roof bases are intended to install the roof intakes CD and intake boxes SC of the TERM units.
Unit size Base size A
[mm]
Lp
[mm]
C
[mm]
Weight
[kg]
TERM-E PD-1 520 600 740 31
The roof bases are made of galvanized steel sheets.
INTAKE BOXES SC
For ceiling and wall heating and ventilation units
Basic version
Version with additional elements:
lter and circulating air dampers
The intake boxes are used to draw and mix fresh and circulating air.
In case the intake boxes are used for the TERM units it is necessary to use (as additional equipment)
exible connector (K) allowing connecting the intake boxes with the units.

9www.juwent.com.pl
In basic version the intake boxes SC consists of:
»fresh air damper;
»mixing chamber with circulating air inlet grids.
The fresh air damper is operated a actuator.
The mixing chamber has 2 grids (manually adjusted) in the circulating air inlet holes allowing setting
a share of circulating air in the total air efciency.
Unit size Box size A
[mm]
Lm
[mm]
Lmax
[mm]
Weight [kg]
SC basic version SC version with lter
and dampers
TERM-E SC-1 520 310 930 23 35
The intake boxes SC can be made with additional elements:
»lter (F) class G3;
»circulating air dampers (P) with actuators.
The intake boxes with additional elements are made in consultation with the manufacturer.
In consultation with the manufacturer the intake boxes can be also made with the mixing chamber
with one circulating air inlet grid.
Air capacity of unit equipped with the SC intake boxes in standard version
Unit size Fan type Air capacity [m3/h]
TERM-E FE-035-4E 2340
Thermal power of the units with SC intake boxes in the standard version is decreased by about~5%.
ADJUSTMENT RANGES OF INTAKE BOXES SC IN STANDARD VERSION
The intake boxes SC in standard version are delivered for all TERM units with a constant recommended
circulating air grid closing angle equal to 60O.
Adjustment ranges of fresh air, share of fresh air in total air efciency by means of damper at the
constant recommended circulating air grid closing angle
Unit size Box size
Adjustment
range of fresh
air by damper
Circulating air
grid closing
angle
% share
of fresh
air in total
efciency
Share of fresh air
[m3/h]
Total air
capacity
[m3/h]
TERM-E SC-1 open-closed 60O10%÷75% 190÷1760 1940÷2340
Adjustment ranges of fresh air, share of fresh air in total air efciency by means of damper depending
on different circulating air grid closing angles
Adjustment range of fresh air by
damper Circulating air grid closing angle % share of fresh air in total
capacity
open-closed 0o1,5% ÷ 57%
open-closed 30o3,5% ÷ 62%
open-closed 45o5% ÷ 67%
open-closed 60o10% ÷ 75%
open-closed 75o17% ÷ 83%
When it is required to extend the adjustment of share from 100% of fresh air to 100 % of circulating
air it is foreseen to replace the standard intake boxes with circulating air grids with the boxes with
increased tightness dampers (2 pcs.) with servomotors.

10 www.juwent.com.pl
WALL INTAKE CS
The wall intakes are intended to draw fresh air from outside the wall.
Unit size Intake size A
[mm]
Weight
[kg]
TERM-1 CS-1 520 7
The wall intakes are made of steel sheets protected by paint coats.
Presentation of % of share of fresh air to which wall intakes with dimensions equal to intake boxes
meet a condition of air inlet speed lesser than 2,5 m/s, i.e. they will not suck rain
Unit size A
[mm]
Intake area
[m2]
Total air capacity
[m3/h]
Efciency of fresh air at
V<2,5m/s [m3/h]
Fresh air efciency
Total air efciency
TERM-E 520 0,27 2340 2450 > 100 %
The TERM-E1 units can operate totally using fresh air from the wall intakes with dimensions equal to
dimensions of cross-sections of intake boxes.
6. TRANSPORT
The delivered units are completely assembled, protected from outside by polyethylene foil against
pollution and weather impacts.
The Product Manual is delivered along with the unit.
The intake boxes and wall intakes constitute additional equipment and they are delivered separately,
protected by polyethylene foil.
The automatics elements delivered at the customer’s request are packed separately.
The units should be transported in one layer in a way preventing mechanical damages.
7. SAFETY RECOMMENDATIONS
The heating and ventilation units should be used only in compliance with the instruction
manual.
The start-up, mounting, connection, inspections and repairs of the unit should be
executed by an authorized installer, the electric works should be executed by a person
having required certicates authorized to carry out electric works.
All service and repair works should be executed when voltage is off.
Unit should be protected against moisture and do not clean the heater with a damp
cloth.
Unit can only be operated when it is fully operational, in the event of a failure,
immediately cut off the power supply.
Dieses Handbuch passt für folgende Modelle
1
Inhaltsverzeichnis
Andere Juwent Lüfter Handbücher