
MCBF1 (Install/Maintenance Instructions)
I N S TA L L AT I O N / M A I N T E N A N C E I N S T R U C T I O N S
Page 3 of 10
CONTEMPORARY WATER COOLERS
Date: 04/03/18
I N S TA L L AT I O N / M A I N T E N A N C E I N S T R U C T I O N S
7109-708-001
WATER COOLERS
MURDOCK MFG. • 15125 Proctor Avenue • City of Industry, CA 91746 USA
Phone 800-453-7465 or 626-333-2543 • Fax 626-855-4860 • www.murdockmfg.com Member of
Please visit www.murdockmfg.com
for most current specifications.
INSTALLATION INSTRUCTIONS CONTINUED:
C
L
3"
(76)
3"
(76) 3
8" (9.5) x 4 Mounting Anchors
(By Others)
103
8"
(262)
27
8"
(73)
Alignment
Notch
Horizontal Mounting
Channel
To Filler Tube
Valve Inlet
From Evaporator
Out Tee Fitting
Bottle Filler Mounting
Frame
Horizontal Mounting
Channel
Water Cooler
(Shown For Reference)
Air Line Inlet
Note: Housing not shown
for clarity
4. Carefully disassemble bottle filler. Remove the top, frame, horizontal mounting channels, and disconnect the PE tubing from
the fill tube. (see page 5)
5. Use the frame as template, align notches in the frame with the vertical center line, and with the frame sitting on the deck
NOTE: COOLER SHOULD BE LEVEL.
6. Mark four mounting holes.
7. Install the four wall anchors (by others).
8. Align mounting frame and horizontal mounting channels to the anchors (as shown) and attach to wall with mounting fasteners
(by others).
9. In drinking cooler access compartment, attach the “Y” strainer (provided) to existing 3/8” OD copper inlet tube and connect
outlet of “Y” strainer to existing 1/4” OD evaporator inlet tube. (see page 4).
10. *In drinking cooler access compartment, remove the 1/4” push-in fitting from evaporator outlet and replace it with 1/4” push-in
tee fitting. Reconnect the PE tube from the cartridge valve assembly to top of tee. (See page 4)
*See insert detail on page 4, for special installation instructions when installing on bi-level drinking fountains.
11. Remove the 18” piece of insulation from the 1/4” OD 30” PE tube. Pass the end of the 30” PE tube through the hole in the
deck of the drinking cooler. Reinstall 18” piece of insulation on to the 30” PE tube, under deck. Connect the 30” PE tube to
the side of the previously installed tee fitting, from step 10. (see page 4).
12. Reconnect 24” PE to fill tube.
13. To reassemble housing to mounting frame assembly, engage the left side of the housing behind the horizontal mounting
channels, then stretch the housing over the right end of the horizontal mounting channels, make sure that the rubber trim on
the housing is touching the water cooler deck. Secure the housing to the top channel, with #10-32 truss head screws
provided.
14. reassemble and install top with #8-32 truss head screws provided.
15. Turn on the water supply stop, test unit and check for leaks, then reinstall access panel.