
Sno-Pro Fast-Cast Series Spreaders
5 of 17
2c. SPREADER LOADING TIPS
► Never exceed 10 m.p.h. when spreading.
► For a wider pass, increase Spinner speed.
► For a heavier pass, drive slower.
► Never operate Spreader near pedestrians.
► Spread ice melters with the storm to prevent
unmanageable levels of ice.
► Calculate spread pattern when near vegetation.
2d.FAST-CAST 2000 OPERATION
(1.) TheVariableSpeedControllerhasnger-tip
dialaction.
(2.) ToStart,pressPowerSwitchonControllerand
Spreaderwillacceleratetospeedsetondial.
(3.) ToStop,pressPowerSwitchonControllerto
offposition.
(4.) AdjustspeedofSpinnerbyusingdialonright
sideofController.
SECTION 3. FAST-CAST 400 ASSEMBLY
STEPS (Refer to Page 12)
3a. AttachHopperTubeSupport(17)toTransmission
Weldment(18)usingfour5/16"-18x1-3/4"HexBolts
(11)andfour5/16"LockNuts(3)Usethefourbottom
mountingholesatendsofHopperTubeSupport(17).
3b. LocateSpreaderGateDeck(15)andplaceupside
downonaatworksurface.
3c. AssembleGateIndicator/Stop(12)onStopSlidewith
GateKnob(7).GateIndicator/Stopmustbeonthe
insideofGateDeckwhereitwillstopthetrack.
3d. Insertone5/16"Boltwithhole(10)throughGate
Indicator/Stop(12).Handtightenone5/16"LockNut
(3)onBolt.
3e. LocateBulkheadCableFitting(9).Threadonto
T-HandleCable-20'(8)rubbercoating.
3f. InsertCableassemblythroughTabonGateDeck.
SecurewithsuppliedWasherandNuts.
A Nut must be positioned on
both sides of tab on Gate Deck.
3g. TurnoverGateDeckandlowertheassemblyover
theSpinnerShaft.TheSpinnerShaftmustbeinserted
throughthe5/8"holeonGateDeck.
3h. FastenGateDecktoHopperTubeusingfour5/16"
HexBolts(11)andfour5/16"LockNuts(3).
First tighten bottom bolts,
pull front of Gate Deck up,
then tighten top set of bolts.
3i. PlaceHopper(16)onGateDeckandoverthe
SpinnerShaft.
3j. Handtightenthetwo5/16"x1"Bolts(5)inserted
throughbottomofHopper.
3k. PlaceoneFenderWasher(1)overeachofthefour
HexBolts(11).InsertthefourBoltswithFender
WashersthroughHopperbackandthroughTube
Support.Securewithfour5/16"Locknuts(3).
3l.FullytightenthetwoBoltsinbottomofHopperthat
securetheHoppertotheDeckinstalledinStep3j.
Refer to Page 13 for the
following Steps.
3m. PositionAgitator(11)onSpinnerShaft.Tightento
middleofatwithshortallenkey.
3n. AttachReceiverMount(18)toTransmission
Weldment(17)usingfour1/2"HexBolts(19)and
four1/2"LockNuts(20).
CABLE INSTALLATION STEPS
3o.MountSpreaderonvehicleinitspermanentlocation.
InsertHitchPininhitchtopreventunitfrommoving.
3p. RouteT-Handletodesiredoperatinglocation.There
cannotbeanybendsorsharpcornersintheCable.
3q. TakeT-HandleoutofSleeve.TakeNutsandWasher
offSleeve.
3r. Drilla1/2"diameterholetomountT-Handle.Thread
onesuppliedNutandWasheronCableafterinserting
throughdrilledhole.
3s. CompletelyclosetheGateSlide.
3t. Re-insertCableHandleandwireallthewayuntilthe
HandleportionofT-HandleCable(8)contactsBulk-
headCableFitting(9).AimthroughBoltwithhole(10)
andtightenBolt.
NOTE
NOTE
NOTE