Sure Vend 673 Bedienungsanleitung



This machine has been engineered to our own rigid safety and performance standards. It
has been designed to comply with sanitation and health guidelines recommended by the
Automatic Merchandising Health-Industry Council (AMHIC) and it conforms with all
other NAMA safety recommendations.
This machine has been manufactured in accordance with the safety standards of both
Underwriter’s Laboratories and the Canadian Standards Association. To maintain this
degree of safety and to continue to achieve the level of performance built into this
machine, it is important that installation and maintenance be performed so as to not alter
the original construction or wiring and that replacement parts are as specified in the Parts
Manual. Your investment in this equipment will be protected by using this Setup and
Operator’s Guide, the Programming Guide, and the Parts Manual in your operation, ser-
vice and maintenance work. By following prescribed procedures, machine performance
and safety will be preserved.
Crane Merchandising Systems Parts and Support
Phone Numbers:
Parts: 1-800-621-7278
Service: 1-800-628-8363

Hot Drink Center II Set-Up Manual
6730013 i
February, 2003
Table of Contents
Title Page
SPECIFICATIONS............................................................................................ 1
MAJOR PARTS ................................................................................................. 4
CONTROLS AND INDICATORS ................................................................... 8
INITIAL SET-UP ............................................................................................. 14
Location Preparation ................................................................................... 14
Water Requirements ................................................................................ 15
Positioning the Merchandiser...................................................................... 16
Connecting Everything................................................................................ 16
Connect the Merchandiser to the Water Supply: ................................. 16
Connect the Merchandiser to the Electrical Power Supply: ................ 16
Final Mechanical Preparation...................................................................... 16
Level the Merchandiser:....................................................................... 16
Mount the Base Plate: .......................................................................... 17
Set Up the Menu Assembly ................................................................. 18
Install the Water Filter Cartridge: ........................................................ 19
Load the Optional Filter Paper:............................................................ 22
Install the Optional Coin Box Lock ..................................................... 24
Load the Coin Mechanism ................................................................... 24
Fill the Tank:........................................................................................ 24
Fill the Canisters: ................................................................................. 25
Load Cups: ........................................................................................... 26
Tell the Machine About the Cup Size(s):............................................. 27
Test the Machine:................................................................................. 28
ADJUSTMENTS AND MINOR MAINTENANCE...................................... 29
Water Valve Adjustment............................................................................. 29
Cup Mechanism Adjustment....................................................................... 30
Grinder Adjustment..................................................................................... 31
Disengaging the Grinder ............................................................................. 32
Canister Installation..................................................................................... 32
Removing POP to Service fluorescent lights, Starters and ballasts............ 33
SANITATION................................................................................................... 34
Basics .......................................................................................................... 34
Clean the Hot Water Tank........................................................................... 36
Sanitation Procedures.................................................................................. 36
Food-Contact Parts .................................................................................. 36
Non Food-Contact Parts .......................................................................... 37
Brewer Cleaning.......................................................................................... 38
Overall Cleaning ......................................................................................... 44
Preventive Maintenance Cleaning............................................................... 44

Hot Drink Center II Set-Up Manual
ii 6730013
February, 2003
Notes . . .
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________

Hot Drink Center II Set-Up Manual
6730013 1
February, 2003
SPECIFICATIONS
SPECIFICATIONS COMMON TO ALL MACHINES
DIMENSIONS 72" (183 cm) high
38.12" (97 cm) wide
28.5" (72 cm) deep
WEIGHT 570 lbs (258.5 kg)
WATER REQUIREMENTS Minimum: 20 psi (137.8 kPa)
Maximum: 80 psi (551.2 kPa)
AMBIENT TEMPERATURE Minimum: 41× F (5× C)
Maximum: 90× F (32× C)
OPERATING ENVIRONMENT For indoor use only
CUP CAPACITIES
(APPROXIMATE) 12 oz cups = 600
14 oz cups = 530
16 oz cups = 380
20 oz cups = 358
CANISTER CAPACITIES
(APPROXIMATE) Regular coffee beans - 14 lbs
Ground coffee - 13 lbs
Freeze dry coffee - 2 lbs
Decaf coffee beans - 9.5 lbs
Ground decaf coffee - 9 lbs
Freeze dry decaf - 2 lbs
Chocolate - 10 lbs
Soup - 6.7 lbs
Sugar - 11 lbs
Lightener - 4.5 lbs
Sugar substitute - 4 lbs
Tea (freeze dry) - 1.5 lbs
6th and 7th products (freeze dry) - 6 lbs each
FILTER PAPER CAPACITY 2400 vends per roll
PRODUCT OPTIONS
MODEL 673 FRESH BREW Up to eleven selections of fresh brew regular and
decaf coffee, freeze dried regular and decaf cof-
fee, fresh brew and freeze dried tea, soup, choco-
late, cappuccino, espresso, caffè latte, and two
blended drinks.
MODEL 675 FREEZE DRIED Up to eleven selections of freeze dried regular
coffee, decaf coffee, tea, soup, chocolate, cap-
puccino, espresso, caffè latte, and two blended
drinks.
MODEL 677 FRESH BREW
WITH
BEAN GRINDER
Up to nine selections of fresh ground and brewed
regular and decaf coffee, freeze dried regular and
decaf coffee, fresh brew and freeze dried tea,
soup, chocolate, cappuccino, espresso, caffè
latte, and two blended drinks.

Hot Drink Center II Set-Up Manual
26730013
February, 2003
OPTIONS AND ACCESSORIES
OPTIONS Coin box lock
Base grille kit
Automatic delivery door
Flex Ace door lock and key
Van Door lock and key
Sugar substitute kit
6th product kit
Cup/mug electronic sensor (cup hold switch kit)
Snap-on ingredient canister
extension sleeves (4 tall)
Everpure water filter system
CUNO water filter system
Debit card validator
Free vend keyswitch
Data printer kit
Ingredient rinse tray
SPECIFICATIONS COMMON TO ALL MACHINES (Continued)

Hot Drink Center II Set-Up Manual
6730013 3
February, 2003
SPECIFICATIONS UNIQUE TO 115 VOLT MACHINES
ELECTRICAL 115 Volts AC
60 Hertz
16 Amps
Single phase
OPTIONS AND ACCESSORIES
COIN MECHANISM MARS TRC-6000
COINTRON 3000
MARS TRC-6010XV (24 V)
Maka/Conlux Model USPX-004 (24 V)
Coin Acceptors Model 9302-LF (24 V)
BILL VALIDATORS MARS VFM1 pulse
MARS VFM3 serial
MAKA pulse
COINCO
SPECIFICATIONS UNIQUE TO 220 - 240 VOLT MACHINES
ELECTRICAL 220-240 Volts AC
50 Hertz
10 Amps
2 kW
Single phase
OPTIONS AND ACCESSORIES
COIN MECHANISM Executive coin mechanism interface

Hot Drink Center II Set-Up Manual
46730013
February, 2003
MAJOR PARTS
The diagrams on the following pages will acquaint you with the major parts of the Hot
Drink Center. For more detailed information, please consult your PARTS MANUAL. If
you do not have a PARTS MANUAL, contact National Vendors Parts Department.
Door Assembly - Exterior

Hot Drink Center II Set-Up Manual
6730013 5
February, 2003
Door Assembly - Interior
Dieses Handbuch passt für folgende Modelle
3
Inhaltsverzeichnis
Beliebte Getränkespender Handbücher anderer Marken

Marvel
Marvel ML24BN Series Handbuch

Cecilware
Cecilware 2K-GB-LD Handbuch

Cornelius
Cornelius 2 Flavor Post-Mix Cold Coffee Dispenser Quest... Bedienungsanleitung

Nostalgia Electrics
Nostalgia Electrics KEG7000SS Bedienungsanleitung

Bunn
Bunn LCR-3 HV Fehlerbehebungshandbuch

Servend
Servend SV-200 Bedienungsanleitung











