Olsen ODV-B Bedienungsanleitung

ODOD
ODOD
ODVV
VV
V-B-B
-B-B
-B
GAS FIRED BOILERS
FOR FORCED HOT WATER
ECR International Ltd. - Olsen Division •P.O. Box 900 •Wallaceburg, Ont. N8A5E5
VENTING ADDENDUMVENTING ADDENDUM
VENTING ADDENDUMVENTING ADDENDUM
VENTING ADDENDUM

TT
TT
TABLE OF CONTENTSABLE OF CONTENTS
ABLE OF CONTENTSABLE OF CONTENTS
ABLE OF CONTENTS
HORIZONTAL PIPING ..................................................................................PAGES 1-10
WARNINGS............................................................................................... PAGE 1
INSTALLATION ....................................................................................PAGES 2-3
TYPICAL INSTALLATION ......................................................................... PAGE 4
FLEX-LPIPINGCOMPONENTS ............................................................... PAGE 5
HEATFABPIPINGCOMPONENTS........................................................... PAGE 6
Z-FLEXPIPINGCOMPONENTS ............................................................... PAGE 7
PROTECHPIPINGCOMPONENTS........................................................... PAGE 8
CONDENSATEDRAINS............................................................................ PAGE 9
LOCATINGTHEVENTTERMINATION................................................PAGES 9-10
VERTICAL VENT PIPING...........................................................................PAGES 11-18
INSTALLATION .................................................................................. PAGE 11-16
B VENT SINGLE APPLIANCE................................................................ PAGE 16
B VENT DUAL APPLIANCE ................................................................... PAGE 17
CATEGORY I VENT INSTALLATION....................................................... PAGE 18

PAGE 1
HORIZONTHORIZONT
HORIZONTHORIZONT
HORIZONTALAL
ALAL
AL VENT PIPE INSTVENT PIPE INST
VENT PIPE INSTVENT PIPE INST
VENT PIPE INSTALLAALLA
ALLAALLA
ALLATION INSTRTION INSTR
TION INSTRTION INSTR
TION INSTRUCTIONSUCTIONS
UCTIONSUCTIONS
UCTIONS
(Through the wall)
THIS BOILER IS DESIGN CERTIFIED FOR USE WITH THE FOLLOWING VENTING
SYSTEMS.
COMPANY HEAT-FAB ®®
®®
®FLEX-L®®
®®
®Z-FLEX®®
®®
®ProTech®®
®®
®
PRODUCT SAF-T-VENT™STAR-34™Z-VENT™FasNSeal™
CAUTION:CAUTION:
CAUTION:CAUTION:
CAUTION: THE ABOVE VENT PIPE AND FITTINGS ARE USED FOR
VENTING GAS BURNING CATEGORY III AND IV APPLIANCES. DO NOT USE THIS
VENT PIPE OR FITTINGS FOR VENTING APPLIANCES BURNING FUELS SUCH AS
WOOD, OIL, KEROSENE OR COAL.
CAUTION:CAUTION:
CAUTION:CAUTION:
CAUTION: DONOTUSETHISVENTPIPEANDFITTINGSFORVENTING
INCINERATORS OF ANY KIND.
WARNINGS:WARNINGS:
WARNINGS:WARNINGS:
WARNINGS:
1. FOR CORRECT INSTALLATION OF VENT SYSTEM, READ ALL OF THESE
INSTRUCTIONSANDREFERTOTHEVENTPIPEMANUFACTURER'SINSTRUCTIONS.
2. FAILURETOUSETHISVENTINGSYSTEMWILLVOIDTHEMANUFACTURER’S
WARRANTYANDMAYRESULTINRAPIDDETERIORATIONOFTHEVENTINGSYSTEM,
APOTENTIALHEALTHHAZARD.
3. FAULTY VENT INSTALLATION CAN ALLOW TOXIC FUMES TO BE RELEASED
INTO LIVING AREAS. THIS MAY CAUSE SERIOUS BODILY INJURY OR PROPERTY
DAMAGE.VENTPERFORMANCEMAYALSOBEAFFECTEDBYIMPROPERASSEMBLY.
4. INSTALL SEPARATE VENTS FOR FORCED EXHAUST APPLIANCES AND
NATURALDRAFTAPPLIANCES.ACOMMONVENTBETWEENNATURALDRAFTAND
FORCEDEXHAUSTAPPLIANCESMAYCAUSETOXICGASESTOEXHAUSTTHROUGH
THE NATURAL DRAFT APPLIANCE RATHER THAN TO OUTSIDE AIR. BREATHING
EXHAUST GASES WILL CAUSE SERIOUS PERSONAL INJURY OR DEATH.
WARNING:WARNING:
WARNING:WARNING:
WARNING: ALL INSTALLATIONS OF BOILERS ANDALL INSTALLATIONS OF BOILERS AND
ALL INSTALLATIONS OF BOILERS ANDALL INSTALLATIONS OF BOILERS AND
ALL INSTALLATIONS OF BOILERS AND
VENTING SHOULD BE DONE ONLY BY A QUALIFIED EXPERT ANDVENTING SHOULD BE DONE ONLY BY A QUALIFIED EXPERT AND
VENTING SHOULD BE DONE ONLY BY A QUALIFIED EXPERT ANDVENTING SHOULD BE DONE ONLY BY A QUALIFIED EXPERT AND
VENTING SHOULD BE DONE ONLY BY A QUALIFIED EXPERT AND
IN ACCORDANCE WITH THE APPROPRIATE OLSEN MANUAL.IN ACCORDANCE WITH THE APPROPRIATE OLSEN MANUAL.
IN ACCORDANCE WITH THE APPROPRIATE OLSEN MANUAL.IN ACCORDANCE WITH THE APPROPRIATE OLSEN MANUAL.
IN ACCORDANCE WITH THE APPROPRIATE OLSEN MANUAL.
INSTALLING OR VENTING A BOILER OR ANY OTHER GASINSTALLING OR VENTING A BOILER OR ANY OTHER GAS
INSTALLING OR VENTING A BOILER OR ANY OTHER GASINSTALLING OR VENTING A BOILER OR ANY OTHER GAS
INSTALLING OR VENTING A BOILER OR ANY OTHER GAS
APPLIANCE WITH IMPROPER METHODS OR MATERIALS MAYAPPLIANCE WITH IMPROPER METHODS OR MATERIALS MAY
APPLIANCE WITH IMPROPER METHODS OR MATERIALS MAYAPPLIANCE WITH IMPROPER METHODS OR MATERIALS MAY
APPLIANCE WITH IMPROPER METHODS OR MATERIALS MAY
RESULT IN SERIOUS INJURY OR DEATH DUE TO FIRE OR TORESULT IN SERIOUS INJURY OR DEATH DUE TO FIRE OR TO
RESULT IN SERIOUS INJURY OR DEATH DUE TO FIRE OR TORESULT IN SERIOUS INJURY OR DEATH DUE TO FIRE OR TO
RESULT IN SERIOUS INJURY OR DEATH DUE TO FIRE OR TO
ASPHYXIATION FROM POISONOUS GASES SUCH AS CARBONASPHYXIATION FROM POISONOUS GASES SUCH AS CARBON
ASPHYXIATION FROM POISONOUS GASES SUCH AS CARBONASPHYXIATION FROM POISONOUS GASES SUCH AS CARBON
ASPHYXIATION FROM POISONOUS GASES SUCH AS CARBON
MONOXIDE WHICH IS ODORLESS AND INVISIBLE.MONOXIDE WHICH IS ODORLESS AND INVISIBLE.
MONOXIDE WHICH IS ODORLESS AND INVISIBLE.MONOXIDE WHICH IS ODORLESS AND INVISIBLE.
MONOXIDE WHICH IS ODORLESS AND INVISIBLE.

PAGE 2
HORIZONTAL VENT INSTALLATION:HORIZONTAL VENT INSTALLATION:
HORIZONTAL VENT INSTALLATION:HORIZONTAL VENT INSTALLATION:
HORIZONTAL VENT INSTALLATION:
A. Theboilerscoveredinthis sectionaredesign-certifiedas CATEGORY3for venting,
only when they are installed with manufacturer specified vent system components and
installation practices.
B. Install vent pipe beginning at the vent connector and work toward the vent cap.
C. Vent pipe and fittings MUST NOT be routed into, through, or within any other vent,
suchasanexisting masonry chimney or factorybuiltchimney.(Recommended installation
is shown in figure 1 page 3, unacceptable installation is shown in figure 2 page 3).
D.Vent pipe lengths. Themaximumlength is thecombinedlength of straight horizontal
andverticalruns,andtheequivalentstraightlengthoffittings.Therequiredlengthsforeach
boiler are as follows: VENT PIPE LENGTHS
Vent Pipe VENTLENGTHS EQUIV.
Model Dia. Maximum Minimum feet per fitting
ODV50/100 3" 30' W/
Condensate 2' W/1 5'
Tee & 2 Elbows Elbow
ODV125 3" 25' W/1 2' W/1 5'
Elbow Elbow
ODV150/200 4" 30' W/1 2' W/1 5'
Elbow Elbow
Example: 20 feet of vent pipe w/1 elbow is Equivalent to 15 feet of vent pipe w/2
elbows. Note, condensate trap is not required on models ODV150 thru 200.
E. The vent pipe should slope upward from the boiler at least 1 inch for every 4 feet.
F. Noportionoftheventpipeshouldhavedipsorsagswherecondensatecouldcollect,
see figure 3 on page 3 for a typical vent system.
G. Rigidly support vent pipe every 5 feet and at the elbows. Plumbers straps may be
used.
H. Clearances and enclosures. ALL vent pipe and fittings must be installed with
appropriate air space clearances to combustibles. These air space clearances apply to
indoor or outdoor vents, whether they are open, enclosed, horizontal or vertical or pass
throughfloors,walls,roofs,orframedspaces.Theappropriateairspaceclearancesshould
be observed to joists, studs, subfloors, plywood, drywall, or plaster enclosures, insulated
sheathing, rafters, roofing, and any other combustible material. The minimum air space
clearance also applies to electrical wires and any kind of building insulation.
WARNING:WARNING:
WARNING:WARNING:
WARNING: DONOTINSULATEOROTHERWISEWRAPVENTPIPEOR
FITTINGS.
For Horizontal runsFor Horizontal runs
For Horizontal runsFor Horizontal runs
For Horizontal runs maintaina minimum air space clearance of6 inches for 3inch and
4inchventpipetoanycombustiblematerial,electricwires,andbuildingmaterials.

PAGE 3
FIGURE1b FIGURE 2
FIGURE 3
FIGURE1a

PAGE 4
FIGURE4
TYPICAL INSTTYPICAL INST
TYPICAL INSTTYPICAL INST
TYPICAL INSTALLAALLA
ALLAALLA
ALLATIONTION
TIONTION
TION
Notes:
*1 : A condensate tee/drain is only needed when horizontal vent lengths exceed
10 feet.
*2: Insert vent pipe in boiler venter outlet (vent adapter), apply silicone completely
around edge of outlet and tighten clamp.

Flex-L®Star-34™Vent Pipe Components
Notes:
*1 : A condensate tee/drain is only needed when horizontal vent lengths exceed
10 feet.
*2: Insert vent pipe in boiler venter outlet (vent adapter), apply silicone completely
around edge of outlet and tighten clamp.
PAGE 5
FIGURE5

Heat Fab®Saf-T Vent™Vent Pipe Components
PAGE 6
FIGURE6
Notes:
*1 : A condensate tee/drain is only needed when horizontal vent lengths exceed
10 feet.
*2: Insert vent pipe in boiler venter outlet (vent adapter), apply silicone completely
around edge of outlet and tighten clamp.

PAGE 7
FIGURE7
Z-Flex®Z-Vent™Vent Pipe Components
Notes:
*1 : A condensate tee/drain is only needed when horizontal vent lengths
exceed 10 feet.
*2 : Insert vent pipe in boiler venter outlet (vent adapter), apply silicone
completely around edge of outlet and tighten clamp.

PAGE 8
FIGURE8
ProTech®FasNSeal™Vent Pipe Components
Notes:
*1 : A condensate tee/drain is only needed when horizontal vent lengths
exceed 10 feet.
*2 : Insert vent pipe in boiler venter outlet (vent adapter), apply silicone
completely around edge of outlet and tighten clamp.
Inhaltsverzeichnis
Andere Olsen Kessel Handbücher

Olsen
Olsen OLSSC-050 Gebrauchsanweisung

Olsen
Olsen OMGC-8D Gebrauchsanweisung

Olsen
Olsen OBC II Series Gebrauchsanweisung

Olsen
Olsen ODVB Series Leitfaden

Olsen
Olsen OSW Bedienungsanleitung

Olsen
Olsen OQ95M-200 Bedienungsanleitung

Olsen
Olsen OLSSC-075 Gebrauchsanweisung

Olsen
Olsen OBC Series Technisches Dokument
Beliebte Kessel Handbücher anderer Marken

Vaillant
Vaillant uniSTOR VIH SW GB 500 BES Bedienungsanleitung

Radijator
Radijator BIO max 23.1 Bedienungsanleitung

Brunner
Brunner BSV 20 Bedienungsanleitung

Buderus
Buderus Logamax GB062-24 KDE H V2 Bedienungsanleitung

Potterton
Potterton 50e Datenblatt

UTICA BOILERS
UTICA BOILERS TriFire Bedienungsanleitung











