Sencore UMH160R Bedienungsanleitung

IRD Quick Installation Guide V1.2-N
Integrated Digital Receiver
Quick Installation Guide

2
IRD Quick Installation Guide V1.2-N
1.InstallationInstruction
1.1 Mounting unit to a 19” rack
When selecting the installation site, try to comply with the following:
zProtective Ground - The protective ground lead of the building's electrical
installation should comply with national and local requirements.
zEnvironmental Condition - The installation site should be dry, clean, and
ventilated. Do not use this equipment where it could be at risk of contact with water.
To avoid electric shock, make sure the rack has been correctly grounded
before switching device on the.
To mount the SMP160R unit to a 19”/42U rack, please perform the following steps:
1. Make sure the mounted rack surface is stable and can support the size and weight of this
equipment.
2. For single unit mounting, use an “L” shape slide (not included in the package) to support
holding the unit if necessary, and fastened with appropriate screws to each side of the
chassis’ rails.
L-shape slide
3. For group pile up (no space between each unit), the unit should be placed on a flat
holding bracket. No more than 5 units for each group, and leave at least one unit space
PIC-1.1-1 Grounding Jackscrew (must be connected to the rack housing)

3
IRD Quick Installation Guide V1.2-N
between each group to ensure good air ventilation.
PIC-1.1-2
1.2 Wiring Connection
Before setting up the connection, please turn off the equipment and all other
connected external devices. The equipment and all connected external devices are
required grounded. Turn on the devices only after the wiring connection is completed.
Otherwise, the device may be damaged.
Follow the below connection diagram to set up cable connection:
PIC-1.2-1
zSet up cable connection for input signal: either the RF input (area 1) or ASI input (area
4).
zSet up cable connection for output signal: either through ASI (area 2) or HDMI/
1
2 5
4
3

4
IRD Quick Installation Guide V1.2-N
CVBS/SDI (area 3)
zSet up connection for network management control: shown in area 5.
In order to ensure a smooth communication between the management PC and
the equipment, please separate the connection of management port and TS/IP output
port to different switch. The switch with management port connected should be
without large data processing.
The TS/IP port can work for input and output simultaneously. User only needs
to connect one RJ45 cable to the TS/IP port of the device.
1.3 Power Connection
Connect this equipment only to the power sources that are identified on the
equipment-rating label normally located close to the power inlet connector(s).
Always pull the plug or the connector to disconnect a cable. Never pull on the cable
itself.
To protect your valuable interests and services, equipping a UPS
(Uninterrupted Power Supply) and an AVR (Automated Voltage Regulator) to the
system is highly recommended.

5
IRD Quick Installation Guide V1.2-N
2.OperationInstructions
2.1 Powering Up & Initializations
Before powering-up the device, make sure that all cabling is correctly
connected (refer to chapter 5.2). The device is correctly connected to the power inlet
and grounded.
Switch on the equipment through the back power switch, the unit is powered up and start the
initialization.
The LCD screen is lighted up, and display information as following:
PIC-2.1-1
The initialization takes about 30 seconds to complete.
If the unit fails to initialize and hangs at the “booting” stage, swtiching off the
device and then powering up again. If the device still fails to initialize, please contact
your service representative for help.
The input/output indicator LEDs turn red after successful initialization because
of signal unlocking. After configuration on the device, corresponding LEDs shall
show correct statuses.
2.2 Network Connection Setup
2.2.1 Navigation Keys Operation Instruction
Use the 6 navigation keys on front panel: Up / Down / Left / Right / Menu / Ok to
IRD
SettingSystem

6
IRD Quick Installation Guide V1.2-N
enter the configuration menu.
zEnter “Menu”:
Press “MENU” button to enter main menu.
zExit Menu/Back to parent Menu
Upon completion of configuration settings, press “MENU” button until you go back
to the Parent Menu.
You can also go back to Parent Menu directly by pressing “ESC” button once.
zEnter Sub-Menu
Press MENU button to enter main menu.
Select a sub-menu by pressing UP and DOWN button.
Press OK button on the selected sub-menu.
zTo change parameter
Step 1: Enter main menu by pressing MENU button.
Step 2: Scroll sub-menu by pressing UP and DOWN button, and press OK button
to change the selected sub-menu.
Step 3: To change parameter settings, press RIGHT and LEFT button to move the
cursor in which change must be made.
Press UP button and DOWN to input / select an appropriate setting, then press OK
button to save.
2.2.2 Check Out and Change the Default IPAddress
zStep 1: check out the IP on the LCD screen.
zStep 2: use the button on the front panel to change the IP, gateway and subnet mask.
The gateway should be the same as the management PC’s. The subnet mask should
be the same as the management PC’s s. The IP and the server’s IP should be in the
same section.
zStep 3: reboot the device to take effect.
zStep 4: ping the new IP on PC to check whether the device can connect to the
management PC.

7
IRD Quick Installation Guide V1.2-N
2.2.3 Configuration through WEB Management
Accessing the equipment through web can be very convenient for remote
configuration of the equipment. Relative to the front panel settings, web operation
can provide a more user-friendly man-machine interface, and less limits in space. For
quick installation, web operation is highly recommended. In this installation guide,
operation instruction is based on web style. For front panel operation instruction,
please refer to product user manual.
zPreparation before connection
Open any web browser (e.g. Mozilla, internet explorer, safari etc.), input the equipment’s IP
address in format: http://xxx.xxx.xxx.xxx (xxx.xxx.xxx.xxx refers to IRD’s IP address) and
press ENTER button to confirm. The browser will attempt to connect to the device. If
succeed, a login page will appear (see pic-2.2-1).
zFirst Time Log On
oFor first time log on, User Name and Password are required. Default User Name
and Password are “admin”.
PIC-2.2-1

8
IRD Quick Installation Guide V1.2-N
User can change the password after log on the device. Please refer to chapter XXXX
of this document for the details. (Referring chapter 6.4.5 /Page 34)
Possible reasons for unsuccessful log on:
zIP address/ network mask/gateway don’t match with the management PC’s
zUser name/password is wrong.
zThe device is connected to the wrong interface.
zMain Interface Introduction
After successful log on, the following screen will display:
PIC-2.2-2
The main interface can be divided into two areas according to its functionality.
(1) Menu: It share same 6 tabs including “Status”, “Inputs”, “Outputs”, “CA”, “System”
and “Reset”.
1
2

9
IRD Quick Installation Guide V1.2-N
(2) Parameter setting and configuration area: The parameters of the equipment are
shown and configured here by selecting corresponding tabs. This is the main operation
area of the WEB management.
2.3 Quick Configuration on Key Parameters (Base
Model)
2.3.1 Check “Status” tab
Click the “status” tab on the left area and then the status information will show on the right
interface as following, where you can check the main information of the device.
PIC-2.3-1
2.3.2 Configure parameters of signal input modules
Firstly, click the “receiver” menu to obtain the “receiver” interface, where you can configure
the detailed parameter of inputs,there are two kinds siganls to be choose:tuner andASI, just
set the right one you need as source as follows:

10
IRD Quick Installation Guide V1.2-N
PIC-2.3-2
2.3.2.1 Tuner IN
To receive the signal from satellite via the device, connect the satellite siganl to the tuner
port and operate as follows:
-Step one:
PIC-2.3-3
Choose the signal as input ,there are three options: ASI, Tuner1 and Tuner2, here we
choose tunel as siganl source. After confirming the signal source, it is able to go for detailed
parameter coonfifuration.
-Step two:
Stepone
Steptwo
Inhaltsverzeichnis
Andere Sencore Empfänger Handbücher

Sencore
Sencore MRD 4400 Bedienungsanleitung

Sencore
Sencore MRD 7000 Bedienungsanleitung

Sencore
Sencore MRD 3187B Bedienungsanleitung

Sencore
Sencore MRD 5800 Bedienungsanleitung

Sencore
Sencore AG 2600 Bedienungsanleitung

Sencore
Sencore MRD 2600 Bedienungsanleitung

Sencore
Sencore MRD 2600 Bedienungsanleitung

















