Fig. 4
Stick the 4 rubber pins to the base’s angles.
_
Fig. 5
position you can locate the holes. Pictured are highlighted with coloured areas:
purple for the target Z-guides, green for the Z axis engine, Orange for the control
card, yellow for the fan.
_
Fig. 6
Get 4 pads lock guides. Begin to position the plates block guide to 2 pairs on the
respective holes, and point it using 2 screws M3x6 for every lead carrier.
_
Fig. 7
To center the screws before thighten them, you can use the axis Z guides D8x338.
_
Fig. 8
_
Fig. 9
the base, using 4 screws M3x6. Do not tighten too strong or there’s the risk to dam-
age the nylon threads. In this case you don’t need to use the brakes-threads.
4
6
8
5
7
9
3 | Assembling the base
19