
Table of Contents 3
© Travis Industries 3/1/18 - 1478 PB 72 GSB2 Aust.
Overview ................................................................... 2
Listing Details........................................................... 2
Installation Options.................................................. 6
Heating Specifications............................................. 6
Dimensions............................................................... 6
Packing List .............................................................. 7
Additional Items Required....................................... 7
Recommended Installation Procedure................... 7
Fireplace Placement Requirements ....................... 8
Clearances ......................................................................8
Raised Fireplaces............................................................8
Televisions Placed Above the Fireplace................ 9
Using a Mantel Between the Fireplace and Television....9
Using a Buildout Above Fireplace and Television............10
Using a Buildout Below a Television................................11
Minimum Framing Dimensions............................... 12
Standoff Assembly................................................... 13
Nailing Brackets ....................................................... 14
Standard vs. Extended Position ............................. 15
Header and Pipe Shield Installation ....................... 16
Corner Installations.................................................. 20
Removing the Front Panel....................................... 21
Gas Line Requirements........................................... 22
Fuel .................................................................................22
Gas Line Connection.......................................................22
Gas Inlet Pressure...........................................................22
Gas Line Location............................................................23
*Relocating the Gas Line to the Base of Fireplace.........23
Electrical Connection............................................... 24
Optional Wall Switch or Thermostat Installation ..25
Parallel ConnectionSeries Connection ...................25
Vent Requirements................................................... 25
Vent Clearances..............................................................26
Vent Firestop or Thimble .................................................26
Altitude Considerations....................................................26
Approved Vent.................................................................26
Vent Installation...............................................................26
Approved Vent Configurations............................... 27
Exhaust Restrictor Position..............................................27
Diffuser............................................................................28
Minimum Vent Configuration.................................. 29
Vent Configuration: Vertical Termination.............. 30
Vent Configuration: Horizontal Termination
with Vertical Rise...................................................... 31
Termination Requirements...................................... 32
Hearth Requirements............................................... 33
Facing Requirements............................................... 34
Standard vs. Extended Position.......................................35
Facing Thicker than 1-1/2” (38mm) .................................36
Screen Assembly Mounts................................................37
Do Not Drill or Screw Zone..............................................38
Mantel Requirements...............................................39
Mantel Column Clearances.............................................39
Use of a Non-Combustible Mantel Below Listed
Mantel Clearances....................................................40
Finalizing the Installation ........................................41
Air Shutter Adjustment ....................................................42
Location of Controls ........................................................43
Glass Frame Removal and Installation............................44
Crushed Glass Installation...............................................47
LP Conversion Instructions ....................................49
Wall Mount Remote Thermostat installation
(optional) ...................................................................54
Installation.......................................................................54
Wiring Diagram – GSB2...........................................58