
10 Call 1300 369 273 www.enware.com.au
INSTALLATION PROCEDURE IN WALL
STEP 6
Make sure integral inlet isolation valve is off. The
line of the slot should be horizontal across the
inlet valve.
STEP 7
Turn on the water supply and test the supply
pipeline connection for leaks.
Do not turn on the integral isolation valve yet.
STEP 8
Note – this step is for 12V mains powered
installations only:
Plug the transformer into a power outlet, and
place the end connector of the 12V transformer
in the Box via the cable access hole, which is
located on the top side of Box.
Ensure at least 50mm of cable is available in
the Box to connect to the sensor. If the cable is
not long enough, use an extended transformer
(4.5m - ENMS230 - available from Enware).
Use a conduit to run the transformer cable
between the power point and the box, to allow
for easy component replacement in future.
WARNING: Do not cut the electrical cable
of the sensor tap, or alter the product in any
way to suit installation. Damage caused in
this way will void warranty.
To avoid damage to the cable when trimming
the Box front cover later, ensure the cable is
tucked away towards the back of the box.
STEP 9
Re-fit the Box front cover and secure with 4
screws.
STEP 10
The wall is ready to be sheeted. Make sure the
sheeting is finished hard against the protruding
section of the Box.