PM135 QuickStart www.satec-global.com
CONFIGURATION
The essential configuration includes:
1. Basic measurement setup
2. Communication setup and testing
3. Resetting the min/max, energy, demands etc.
Additional recommended configuration: set points, TOU and data logging
Note: It may be easier to configure communication first and use PAS software for setup
Basic Measurement Setup
In any display screen, press MENUto enter the Basic Settings Display.
Network wiring configuration
Transformation ratio of the Potential Transformers
Additional PT factor for EHV network
The Primary Rating Of The Current Transformers
Power Demand Period
(E & EH models)
Duration in minutes of the power demand period
calculations. E = External pulse in DI1.
Blocks in Sliding Demand
(E & EH models)
The number of blocks to be averaged for sliding window
demands
Volt/Ampere Demand Period
Duration in seconds for voltage and current demand
0 = CT primary current. Other = max. current
3-wire 2-element Delta direct connection using 2 CTs
4-wire 3-element Wye direct connection or 3PTs, and 3 CTs
3-wire 2-element Open Delta connection using 2 PTs, 2 CTs
4-wire 2½-element Wye connection using 2 PTs, 3 CTs
3-wire 2½-element Open Delta connection using 2 PTs, 3 CTs
4-wire 3-element Delta direct connection using 3 CTs
3-wire 2½-element Broken Delta connection using 2 PTs, 3 CTs
* LN or LL denotes the default use of L-L or L-N voltages (in thresholds, min/max, demands etc.)
Communication setup and testing
In any display screen, press MENU 5 times andto setup the built in RS-485 port
(COM1). If communication module is present, configure also COM2.
Resetting the min/max, energy, demands etc.
Press MENU to enter the reset menu. Select the value to be reset, press to
select, then press for 5 seconds until the "Do" notification is changed to "Done".
Copyright © 2013 SATEC Ltd.