BTW0241C BFW0341C
For any further information please contact Crosswater on:
0845 873 8840
Or visit our web-site at www.crosswater.co.uk
The manufacturer reserves the right to make technical
modications without prior notice.
BATH WASTES
25mm
‘O’ ring
SEAL
Inside of bath
25mm
‘O’ ring
SEAL
Inside of bath
Prepare the assembly by pushing the ‘O’ ring onto the nut. Push
the rubber seal onto the housing, and hold the unit in position
from the outside of the bath. From the inside of the bath place
the base ring over the bath hole, if the hole is to small, snap off
one of the lugs with a pair of long nose pliers. Slide the insert
and body into the base ring and screw on the nut, nally push on
the cover.
Insert the 2 ‘O’ rings into the grooves on the inside of the hose
and push the hose onto the housing.
Finally connect up the inlet which can be positioned either side
of the housing. An extra inlet elbow is supplied were dual feed
supply is required, remove the blanking socket as required.
BASE RING
BODY
COVER
NUT
‘O’ RING
BATH
RUBBER SEAL
INLET
‘O’ RINGS
HOSE
‘O’ RING
RUBBER WASHER
WASHER
RETAINING NUT
HOSE SEAL
BATH
From below push the rubber seal into the hole in the bath
(see detail), then push on the housing. From inside the bath
place the plug hole in position on the seal, place the washer onto
the bolt and screw in the housing (use the small bolt for bath
thicknesses up to 9mm and the large bolt for thicknesses
from 9mm to 35mm). Place the plug into the hole. To adjust the
plug release the nut, screw/unscrew the bolt until the required
position is obtained, re-tighten the nut.
Prepare the hose by sliding on the retaining nut, clear washer,
rubber washer. Finally push the ‘O’ ring into position 25mm from
the end (see detail above). Push the hose assembly into the
housing and hand tighten the nut.
INSERT
BLANKING SOCKET
Push the rubber seal onto the housing, and hold the unit in
position from the outside of the bath. From the inside of the bath
place the base ring over the bath hole, screw on the locking nut,
nally push the cover onto the splines of the housing.
Insert the 2 ‘O’ rings into the grooves on the inside of the hose
and push the hose onto the housing.
BASE RING
LOCKING NUT
COVER
BATH
RUBBER SEAL
‘O’ RINGS x 2
HOSE
‘O’ RING
RUBBER WASHER
WASHER
RETAINING NUT
HOSE
PLUG
BOLT
PLUG HOLE
SEAL
BATH
From below push the rubber seal into the hole in the bath
(see detail), then push on the housing. From inside the bath
place the plug hole in position on the seal, place the washer onto
the bolt and screw in the housing (use the small bolt for bath
thicknesses up to 9mm and the large bolt for thicknesses
from 9mm to 35mm). Place the plug into the hole. To adjust the
plug release the nut, screw/unscrew the bolt until the required
position is obtained, re-tighten the nut.
Prepare the hose by sliding on the retaining nut, clear washer,
rubber washer. Finally push the ‘O’ ring into position 25mm from
the end (see detail above). Push the hose assembly into the
housing and hand tighten the nut.
HOUSING
HOUSING
WASHER BOLT
PLUG HOLE
WASHER
PLUG
HOUSING
LUGS
HOUSING
Crosswater Bath Wastes.indd 2 21/8/07 15:08:52