ENGLISH
WWW.STIEBEL-ELTRON.COM SBB 600-1000 WP SOL | 19
INSTALLATION
COMMISSIONING
10. Commissioning
10.1 Initial commissioning
Open a draw-off point until the appliance has filled up and
the pipework is free of air.
Adjust the flow rate. For this, observe the maximum permis-
sible flow rate with a fully opened tap (see chapter "Specifi-
cation / Data table"). If necessary reduce the flow rate at the
butterfly valve of the safety assembly.
Carry out a tightness check.
Vent the internal indirect coils.
Switch the mains power ON if required.
Check the function of the safety assembly.
Check the function of fitted accessories.
Then check the function of the solar thermal system, if
appropriate.
If relevant, check that the DHW temperature displayed on the
heat pump control unit is correct.
10.1.1 Appliance handover
Explain the function of the appliance to users and familiarise
them with its operation.
Make users aware of potential dangers, especially the risk of
scalding.
Hand over these instructions.
10.2 Recommissioning
See chapter "Initial commissioning".
11. Shutting down
If necessary, disconnect any accessories installed from the
mains at the MCB/fuse in the fuse box.
Drain the appliance. See chapter "Maintenance / Draining the
appliance".
12. Troubleshooting
Fault Cause Remedy
The safety valve drips
when the heating is
switched off.
The valve seat is con-
taminated.
Clean the valve seat.
13. Maintenance
WARNING Electrocution
Carry out all electrical connection and installation work
in accordance with relevant regulations.
WARNING Electrocution
Before any work on the appliance, disconnect all poles
of the appliance from the power supply.
If you need to drain the appliance, observe chapter "Draining the
appliance".
13.1 Checking the safety valve
Regularly vent the safety valve on the safety assembly until a
full water jet is discharged.
13.2 Draining the appliance
WARNING Burns
Hot water may escape during the draining process.
If the appliance needs to be drained for maintenance or to protect
the whole installation when there is a risk of frost, proceed as
follows:
Close the shut-off valve in the cold water inlet pipe.
Open the hot water taps on all draw-off points.
Drain the appliance via the "Cold water inlet" (see chapter
"Specification / Dimensions and connections"). Please note
that residual water remains in the appliance.
13.3 Replacing the signal anode
Replace the signal anode if it becomes depleted. For this, ob-
serve the maximum transition resistance between the anode
and the cylinder of 0.3Ω.
13.4 Cleaning and descaling the appliance
26�03�01�0847
1
1
1 Threaded extraction holes
Use the threaded extraction holes to release the flange plate
from the flange connector.
For the torque of the flange screws, see chapter "Specification /
Dimensions and connections".
Never use descaling pumps.
Never treat the cylinder surface or the signal anode with des-
caling agents.